HomeMy WebLinkAboutEngineer Planr LOCUS
m w
SEPTIC SYSTEM DESIGN
rAW
ELEV.
S2
FLOW ESTIMATE:
CpP E RD
E.C.T./ 108 1'
W 108.08,
5 BEDROOMS AT 110 GAL / DAY = 550 GAL / DAY
G
VO /�
o
MECHANICALLY COMPACTED)
QU .MOSS
TEE SIZES:
SEPTIC TANK:
N RD..
550 GAL 1 DAY x 2 DAYS = 1150 GAL
i
6. 2
USE 2 - 1000 GALLON SEPTIC TANKS (1 EXISTING, 1 PROPOSED)
LOCATION MAP
LOT 61 (21,216 SF)
ASSESSORS MAP: 14, PARCEL: 39
LAND COURT CASE 14426H
LEACHING AREA:
USE 40 INFILTRATOR QUICK 4 PLUS STANDARD CAPACITY
CHAMBERS AS SHOWN (34' x 15' x 8" EFF. DEPTH)
SIDE AREA:. NA (0.74) =-N& GAUDAY'
BOTTOM AREA: 4' x 40 UNITS x 4.7 = 752 SF (0.74) = 556 GAVDAY
CAPACITY - 556 GAUDAY
SEPTIC SYSTEM SECTION
unc
REQUIRED VARIANCES FROM TITLE FIVE:
1. SECTION 15.212: LEACH AREA TO BE LESS THAN 6 ABOVE GROUND WATER (VARIANCE OF 1.0').
40 MIL POLY LINER Z
130' x 2' DEEP
TOP OF LINER = 6.5
c BOTTOM ELEVATION = 4.5
6.3
x
5.4
COVe
ROAD
ELEV.
\e of
eveme.,
0.0 1000 GAL
INLET
ELEV. SEPTIC TANK
E.C.T./ 108 1'
W 108.08,
(6' OF STONE UNDER OR
G
VO /�
o
MECHANICALLY COMPACTED)
W
TEE SIZES:
FILTER
INLET: 6" UP, 13" DOWN
OUTLET: 6" UP, 14" DOWN
i
6. 2
17• 4 BEs 1ArG
- DI,aE ROOM
`6..
lop fndAfd
`/905 pRCii.
12 _
cedar
7.4
m
1000 GAL
B 3
12" 24,•pine S
PUMP CHAMBER
34 5
E B"
18 cedar 11 `.�� W oak oak
pine •Sr
5.2 k Q,AOq�,0t
Caj�a��00
2c .�
EXISTING PLASTIC SEPTIC TANK
(PUMP AND FILL WITH SAND OR REMOVE)
EXISTING PIPE INVERT ELEVATION
AT THIS POINT =4.7
N
(.rg
Wac(k
th 1
STONE
DRIVE
4.
1000 GAL
SEPTIC TANK
TEE SIZESffTO BE CONFIRMED)
INLET:6" UP, 13" DOWN
OUTLET: 6" UP, 14" DOWN
EXISTING 1000
GALLON SEPTIC TANK
t
1/8"e� r ft..
2" PRESSURE LINE TO EXIT THROUGH RISER OR TANK
A QUICK DISCONNECT IS TO BE PROVIDED FOR
FUTURE ACCESS TO PUMP.
/-PUMP CHAMBER COVER TO BEAT GRADE.
u (PROPOSED) E .
4.5
ELEV.
I
0.0 1000 GAL
INLET
ELEV. SEPTIC TANK
GAS
(6' OF STONE UNDER OR
BAFFLE
MECHANICALLY COMPACTED)
ZABEL
TEE SIZES:
FILTER
INLET: 6" UP, 13" DOWN
OUTLET: 6" UP, 14" DOWN
6.49
2" PRESSURE LINE TO EXIT THROUGH RISER OR TANK
A QUICK DISCONNECT IS TO BE PROVIDED FOR
FUTURE ACCESS TO PUMP.
/-PUMP CHAMBER COVER TO BEAT GRADE.
ADJUSTED GROUND WATER ELEVATION = 1.5
TH-1 6.0
E
TEST HOLE LOGS 24" FILL
BED A/E HORIZON
I MMIROOM ENGINEER: THOMAS MCLELLAN, P.E. LOAMY SAND
BED .LOFT 30" 10YR 2/1 3.5
ROOM WITNESS: BRUCE MURPHY, R.S. B HORIZON
LOAMYSAND
PROPOSED LEACH AREA DATE: 12-14-20 48" IOYR 5/8 20
APPROXIMATE AREA OF
EXISTING LEACH FIELD
SERVING MAIN HOUSE.
ABANDON IN PLACE.
INSPECTION PORT
TEE AT
ELEV, 6.5
7.3
INLET
T MAX•
,. ,
-
COVERS''"
m
(9' MIN)
>
(PROPOSED)
6.49
6. 2
ELEV: D -BOX
ELEV. ,17"
, " 5.5
(6" OF STONE UNDER) ELEV.
ELEV.
1000 GAL
PUMP CHAMBER
34 5
ERS SRM -4 PUMP. PUMP ALARM 114" DRAIN
HOLE
USE 401NFILTRATOR QUICK 4PLUS 4'
E TO BE INSTALLED INDWELLING
STANDARD CAPACITY CHAMBERS
ID BY A CIRCUIT SEPARATE FROM CHECK
AS SHOWN (34'x 15'x 8" EFF: DEPTH)
IP POWER. DISTANCE BETWEEN VALVE
xunrcu rn c a'q
/
ADJUSTED GROUND WATER ELEVATION = 1.5
TH-1 6.0
E
TEST HOLE LOGS 24" FILL
BED A/E HORIZON
I MMIROOM ENGINEER: THOMAS MCLELLAN, P.E. LOAMY SAND
BED .LOFT 30" 10YR 2/1 3.5
ROOM WITNESS: BRUCE MURPHY, R.S. B HORIZON
LOAMYSAND
PROPOSED LEACH AREA DATE: 12-14-20 48" IOYR 5/8 20
APPROXIMATE AREA OF
EXISTING LEACH FIELD
SERVING MAIN HOUSE.
ABANDON IN PLACE.
BENCHMARK AT
RIGHT CORNER
OFCONC. APRON
ELEVATION = 6.05
OPEN PERCOLATIONS RATE: <2 MIWIN C1 HORIZON
BATH TO MEDIUM SAND
BELOW 2.5Y 6/6
OBSERVED 1.2
2nd FLOOR ADJUSTED GROUNDWATER ELEV.= 1.5 78" GROUND WA ER
s
(BASED ON HISTORICAL DATA AND NO C2 HORIZON
PHRIMPTER ADJUSTMENT DUE TO BEING FINE SAND
WITHIN 300' OF A TIDAL WATER BODY.) 120" 2.5Y 7/2 .4.0
BED KITCHEN NOTES:
ROOM DINING
AREA
PCH. 1. VERTICAL DATUM: NAVD(88)
2. MUNICAPAL WATER IS AVAILABLE.
bh mai m
00 = ROOM 3. SCHEDULE 40 - 4" PVC PIPE TO BE USED THROUGHOUT SEPTIC SYSTEM.
0 4. ALL PRECAST UNITS SUBJECT TO TRAFFIC LOADS TO CONFORM WITH AASHTO H-20 SPECIFICATIONS.
i st FLOOR
5. PIPE PITCH = 1;4' PER FOOT (UNLESS NOTED OTHERWISE). --
6. FIRST 2' OF PIPE OUT OF.D-BOX TO BE SET LEVEL. -
EXISTING FLOOR PLAN 7. THE SEPTIC SYSTEM HAS. NOT BEEN DESIGNED TO. ACCOMODATE THE USE OF A GARBAGE DISPOSAL.
8. ALL CONSTRUCTION DETAILS ARE TO BE IN CONFORMANCE WITH THE STATE OF MASS. ENVIRONMENTAL
CODE (TITLE FIVE) AND LOCAL HEALTH REGULATIONS,
BATH 9. CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES PRIOR TO CONSTRUCTION.
8ED 10. GROUND COVER OVER ALL SEPTIC SYSTEM COMPONENTS NOT TO EXCEED T WITHOUT VARIANCE.
ROAM 11. FIELD SURVEY PROVIDED BY TERRY A. WARNER, P.L.S., HARWICH, MA.
12. THIS PLAN REQUIRES THE REVIEW AND APPROVAL OF ONE OR MORE TOWN DEPARTMENTS AND
ROOM ABOVE GARAGE IS SUBJECT TO CHANGE UNTIL SUCH TIME. THIS PLAN HAS BEEN PREPARED FOR THE SOLE
PURPOSE OF CONSTRUCTION OF A NEW SEPTIC SYSTEM AND DOES NOT NECESSARILY
REPRESENT A FULL DETAILED PROPERTY SURVEY.
BUOYANCY CALCULATION: 1000 GALLON SEPTIC TANK 13. EXISTING WESTERLY LEACH FIELD IS TO BE PUMPED AND REMOVED. EASTERLY FIELD TO BE
8.5'x 4.83'x (1.5 - 0) x 62.4 LB/CF - 3,842 LB ABANDONED IN PLACE.
WEIGHT OF TANK = 8,240 LB -
BUOYANCY CALCULATION: 1000 GALLON PUMP CHAMBER 14. D -BOX TO BE WATER TESTED TO ENSURE LEVELNESS AND EQUAL FLOW.
8.5' x 4.83'x1.5 -t-0.55Y x 62.4 LB/CF = 5,252 LB 15. AN ELECTRIC PERMIT FOR THE PUMP PACKAGE IS TO BE OBTAINED PRIOR TO CONSTRUCTION.
WEIGHT OF TANK = 8,240 LB - -
16. PROPOSED SEPTIC TANK AND PUMP CHAMBER ARE TO BE WATER PROOFED BY MANUFACTURER WITH
IPANEX CONCRETE ADDITIVE OR CONSEAL 55. A 6" EZ WRAP IS ALSO REQUIRED FOR BOTH TANKS.
17. ALL UNSUITABE SOIL (FILL, A/E & B HORIZON, APPROX. 4' DEEP) WITHIN 5' OF PROPOSED LEACH FIELD IS
TO BE REMOVED AND REPLACED WITH CLEAN MEDIUM SAND.
18. WATER SERVICE FROM HOUSE TO GARAGE TO BE ENCASED IN 4" PVC PIPE.
SITE PLAN
rtT� OF
LOCATION:
THOMAS J. 1 COVE RD., W. YARMOUTH, MA
KEY: Mdis.LAN
EXISTING CONTOUR - - - N � m PREPARED FOR:
PROPOSED CONTOUR ............. JAY BERKSON
EXISTING SPOT ELEVATION: 25.5 DATE: 1-13-2L SCALE: I"=30'
PROPOSED SPOT ELEVATION: 55 NAL
TEST HOLE: --
UTILITY POLE: -o- BASS RIVERENGINEERING
FENCE LINE:
HYDRANT:-
RETAINING WALL: m THOMAS J. MCLELLAN, P.E. P.O. BOX 1153, EAST DENNIS, MA 02641
508-3&f-9048
Permit valid for REPAIR OFSFI'-fI(' SYSTRM
ONLY, due to State and Local septic variances.
Board of Health r c, iew and approval is required for
any future additionvlrenov»uunvulu•ratiuns to
sewage facilities and/or structuresldnr long.
Yartnuuth health Dcpartwent
APPROVED
ojj 3 1-7 2t
Name Date
3
�
o�
�
m
2
>
Co
I(
D
Z
J
v
/
0
/
Y
d
BENCHMARK AT
RIGHT CORNER
OFCONC. APRON
ELEVATION = 6.05
OPEN PERCOLATIONS RATE: <2 MIWIN C1 HORIZON
BATH TO MEDIUM SAND
BELOW 2.5Y 6/6
OBSERVED 1.2
2nd FLOOR ADJUSTED GROUNDWATER ELEV.= 1.5 78" GROUND WA ER
s
(BASED ON HISTORICAL DATA AND NO C2 HORIZON
PHRIMPTER ADJUSTMENT DUE TO BEING FINE SAND
WITHIN 300' OF A TIDAL WATER BODY.) 120" 2.5Y 7/2 .4.0
BED KITCHEN NOTES:
ROOM DINING
AREA
PCH. 1. VERTICAL DATUM: NAVD(88)
2. MUNICAPAL WATER IS AVAILABLE.
bh mai m
00 = ROOM 3. SCHEDULE 40 - 4" PVC PIPE TO BE USED THROUGHOUT SEPTIC SYSTEM.
0 4. ALL PRECAST UNITS SUBJECT TO TRAFFIC LOADS TO CONFORM WITH AASHTO H-20 SPECIFICATIONS.
i st FLOOR
5. PIPE PITCH = 1;4' PER FOOT (UNLESS NOTED OTHERWISE). --
6. FIRST 2' OF PIPE OUT OF.D-BOX TO BE SET LEVEL. -
EXISTING FLOOR PLAN 7. THE SEPTIC SYSTEM HAS. NOT BEEN DESIGNED TO. ACCOMODATE THE USE OF A GARBAGE DISPOSAL.
8. ALL CONSTRUCTION DETAILS ARE TO BE IN CONFORMANCE WITH THE STATE OF MASS. ENVIRONMENTAL
CODE (TITLE FIVE) AND LOCAL HEALTH REGULATIONS,
BATH 9. CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES PRIOR TO CONSTRUCTION.
8ED 10. GROUND COVER OVER ALL SEPTIC SYSTEM COMPONENTS NOT TO EXCEED T WITHOUT VARIANCE.
ROAM 11. FIELD SURVEY PROVIDED BY TERRY A. WARNER, P.L.S., HARWICH, MA.
12. THIS PLAN REQUIRES THE REVIEW AND APPROVAL OF ONE OR MORE TOWN DEPARTMENTS AND
ROOM ABOVE GARAGE IS SUBJECT TO CHANGE UNTIL SUCH TIME. THIS PLAN HAS BEEN PREPARED FOR THE SOLE
PURPOSE OF CONSTRUCTION OF A NEW SEPTIC SYSTEM AND DOES NOT NECESSARILY
REPRESENT A FULL DETAILED PROPERTY SURVEY.
BUOYANCY CALCULATION: 1000 GALLON SEPTIC TANK 13. EXISTING WESTERLY LEACH FIELD IS TO BE PUMPED AND REMOVED. EASTERLY FIELD TO BE
8.5'x 4.83'x (1.5 - 0) x 62.4 LB/CF - 3,842 LB ABANDONED IN PLACE.
WEIGHT OF TANK = 8,240 LB -
BUOYANCY CALCULATION: 1000 GALLON PUMP CHAMBER 14. D -BOX TO BE WATER TESTED TO ENSURE LEVELNESS AND EQUAL FLOW.
8.5' x 4.83'x1.5 -t-0.55Y x 62.4 LB/CF = 5,252 LB 15. AN ELECTRIC PERMIT FOR THE PUMP PACKAGE IS TO BE OBTAINED PRIOR TO CONSTRUCTION.
WEIGHT OF TANK = 8,240 LB - -
16. PROPOSED SEPTIC TANK AND PUMP CHAMBER ARE TO BE WATER PROOFED BY MANUFACTURER WITH
IPANEX CONCRETE ADDITIVE OR CONSEAL 55. A 6" EZ WRAP IS ALSO REQUIRED FOR BOTH TANKS.
17. ALL UNSUITABE SOIL (FILL, A/E & B HORIZON, APPROX. 4' DEEP) WITHIN 5' OF PROPOSED LEACH FIELD IS
TO BE REMOVED AND REPLACED WITH CLEAN MEDIUM SAND.
18. WATER SERVICE FROM HOUSE TO GARAGE TO BE ENCASED IN 4" PVC PIPE.
SITE PLAN
rtT� OF
LOCATION:
THOMAS J. 1 COVE RD., W. YARMOUTH, MA
KEY: Mdis.LAN
EXISTING CONTOUR - - - N � m PREPARED FOR:
PROPOSED CONTOUR ............. JAY BERKSON
EXISTING SPOT ELEVATION: 25.5 DATE: 1-13-2L SCALE: I"=30'
PROPOSED SPOT ELEVATION: 55 NAL
TEST HOLE: --
UTILITY POLE: -o- BASS RIVERENGINEERING
FENCE LINE:
HYDRANT:-
RETAINING WALL: m THOMAS J. MCLELLAN, P.E. P.O. BOX 1153, EAST DENNIS, MA 02641
508-3&f-9048
Permit valid for REPAIR OFSFI'-fI(' SYSTRM
ONLY, due to State and Local septic variances.
Board of Health r c, iew and approval is required for
any future additionvlrenov»uunvulu•ratiuns to
sewage facilities and/or structuresldnr long.
Yartnuuth health Dcpartwent
APPROVED
ojj 3 1-7 2t
Name Date