January 31, 2022
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed observation of earthwork activities. No Samples Taken. See attached.
The work observed was, to the best of Arsene's knowledge, in accordance with the approved plans, specifications and applicable standards of
workmanship.
February 1, 2022
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed structural masonry inspection. See attached.
The work observed was, to the best of Arsene's knowledge, in accordance with the approved plans, specifications and applicable standards of
workmanship.
February 2, 2022
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed structural masonry inspection for grout placement. Grout sample(s)
obtained: (4) per set, (1) set(s), (4) total. See attached.
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed concrete placement and sampling inspection. Concrete sample(s)
obtained: (5) per set, (1) set(s), (5) total. See attached.
The work observed was, to the best of Arsene's knowledge, in accordance with the approved plans, specifications and applicable standards of
workmanship.
TESTING
INSPECTION
ENGINEERING
SW
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
February 3, 2022
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed observation of earthwork activities. No Samples Taken. See attached.
The work observed was, to the best of Arsene's knowledge, in accordance with the approved plans, specifications and applicable standards of
workmanship.
February 4, 2022
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed structural masonry inspection. Mortar sample(s) obtained: (6) per set,
(1) set(s), (6) total. See attached.
The work observed was, to the best of Arsene's knowledge, in accordance with the approved plans, specifications and applicable standards of
workmanship.
Laboratory test results are enclosed if testing was done during the period covered by this report.
Limitations: These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as
acceptance or guarantee of the work. Even with diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the
code.
Reviewed by:
Enea Mushi
Project Manager
02-11-2022
Date
Technical Contact: Bruce Tie, Engineering Manager (btie@fenaghengineering.com)
Administrative Contact: Siobhain Willis (Swillis@fenaghengineering.com)
cc:Fenagh PM – emushi@fenaghengineering.com (email)
Fenagh Technical Reviewer – btie@fenaghengineering.com (email)
TESTING
INSPECTION
ENGINEERING
Soils Observation
FET Project #: 5951
Project Name: Dennis Yarmouth Middle School TAA #: NA
Inspection Address: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Arsene Ntwali
January 31, 2022
Time In: 07:00 Time Out: 15:00
Weather: Sunny
Temperature: 33°F
Permit No. : BLD-21-006153
Plans Dated: 09/23/2021
Conformance:
The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable
standards of workmanship.
Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below.
Reviewed by:
Arsene Ntwali
Inspector
01-31-2022
Date Jillian Kass
Staff Engineer
02-02-2022
Date
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed observation of earthwork activities. No samples taken.
Additional Notes: R.B.O cleaned the jobsite from the weekend snowstorm.
TESTING
INSPECTION
ENGINEERING
Project No: 5951
Project Name: Dennis Yarmouth Middle School
Project Location: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Arsene Ntwali
Inspection Type: Masonry CMU Block Placement
Pg. 1 of 1
February 1, 2022
Time In: 07:00 Time Out: 15:00
Weather: Sunny
Temperature: 40°F
Permit No. : BLD-21-006153
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Observed placement of 12" units and rebar, #5 at 48” O.C. horizontal and
#7 at 16” O.C. vertical, constructed with Amerimix Type S mortar, 28 courses, wall(s) at Level 1, gridlines Building B gridlines J.7-
L.9/B33. Work in progress. Reference details Submittal #042000-49.0.
Additional Notes: Inspected reinforced rebar for CMU blocks on the East side of the gymnasium.
J.7-L.9/b33.
Plans Dated: 07/02/2021
Conformance:
The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable
standards of workmanship.
Limitations: These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or
guarantee of the work. Even with diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein
has not been reviewed by supervisory staff, therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below.
Reviewed by:
Arsene Ntwali
Inspector
02-01-2022
Date Jillian Kass
Staff Engineer
02-02-2022
Date
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
NYk
TESTING
INSPECTION
ENGINEERING
Project No: 5951
Project Name: Dennis Yarmouth Middle School
Project Location: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Arsene Ntwali
Inspection Type: Masonry Grout Placement
Pg. 1 of 1
February 2, 2022
Time In: 07:00 Time Out: 15:00
Weather: Light Rain
Temperature: 42°F
Permit No. : BLD-21-006153
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Observed placement of Grout, mix design #Spec Mix, 3000 PSI at 28 days,
for the 12" CMU wall, high-lift height 27 courses. Cleanouts were used, cells are clean and acceptable. consolidated by mechanical
vibration. wall(s) at Level 1 at gridlines K-K.8/b33.
Set No.Slump (in.)Mix Temp (°F)Air Temp (°F)Location Qty. of Samples
1 N/A 56 42 K.1/b33 4
1 set of Grout Box(s) for a total of 4 samples
Referenced Details: 1-4WET Fine Grout Mix.
Additional Notes: Grout placed on CMU blocks on the East side of the gymnasium.
Area of placement was enclosed and heated.
Plans Dated: 06/25/2021
Conformance:
The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable
standards of workmanship.
Limitations: These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or
guarantee of the work. Even with diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein
has not been reviewed by supervisory staff, therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below.
Reviewed by:
Arsene Ntwali
Inspector
02-02-2022
Date Jillian Kass
Staff Engineer
02-03-2022
Date
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
NYk
TESTING
INSPECTION
ENGINEERING
Project No: 5951
Project Name: Dennis Yarmouth Middle School
Project Location: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Arsene Ntwali
Inspection Type: Concrete Placement and Sampling
Pg. 1 of 1
February 2, 2022
Time In: 07:00 Time Out: 09:00
Weather: Sunny
Temperature: 42°F
Permit No. : BLD-21-006153
Plans Dated: 08/26/2021
Conformance:
The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable
standards of workmanship.
Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below.
Reviewed by:
Arsene Ntwali
Inspector
02-02-2022
Date Jillian Kass
Staff Engineer
02-09-2022
Date
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Observed placement of and performed sampling of concrete for
Level 1, slab on grade at H-K/b15-16 (mix no. 3000DNA, design strength of 3000 psi at 28 days, specified slump from 5 to 9 in.,
specified air content from 0% to 3%, and 11 cubic yards placed). Monitored loads for mix no., slump, temp., and time limit. Prepared
4x8" cylinder test specimens sampled from Pump truck.
Set
No.
Slump
(in.)
Mix
Temp.
(°F)
Air Temp.
(°F)
Air Content
(%)
Unit Weight
(pcf)
Truck
No.Location Qty. of
Samples Batch Time Sample Time Subcontractor
Ticket
No.
1 6.75 66 42 1.7 149.3 56 H/b16 5 6:55 AM 7:40 AM Silverback
2312
4
5 Total
Additional Notes:
Referenced Details: Mix Design 3000 DNA-3/4 Design Concrete
TESTING
INSPECTION
ENGINEERING
Soils Observation
FET Project #: 5951
Project Name: Dennis Yarmouth Middle School TAA #: NA
Inspection Address: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Arsene Ntwali
February 3, 2022
Time In: 07:00 Time Out: 15:00
Weather: Light Rain
Temperature: 47°F
Permit No. : BLD-21-006153
Plans Dated: 09/23/2021
Conformance:
The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable
standards of workmanship.
Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below.
Reviewed by:
Arsene Ntwali
Inspector
02-03-2022
Date Jillian Kass
Staff Engineer
02-04-2022
Date
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Performed observation of earthwork activities. No samples taken.
Additional Notes: Observed placement and compaction of stones in the auditorium: a8-11/S.1-S.8, a5-a14/W-V.
Bedding sand was used to cover electric conduit.
A plate compactor was used to compact the stone to the finish grade
TESTING
INSPECTION
ENGINEERING
Project No: 5951
Project Name: Dennis Yarmouth Middle School
Project Location: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Arsene Ntwali
Inspection Type: Masonry CMU Block Placement
Pg. 1 of 1
February 4, 2022
Time In: 07:00 Time Out: 15:00
Weather: Rain
Temperature: 46°F
Permit No. : BLD-21-006153
Arsene Ntwali reported to Mitch Miller with PMA at the jobsite. Observed placement of 12" units and rebar, #5 at 48” O.C. horizontal and
#7 at 16” O.C. vertical, constructed with Amerimix Type S mortar, 5 courses, wall(s) at Level 1, gridlines P.1/b26-30. Work in progress.
Reference details Submittal #042000-49.0, #042000-1.5D 3.0, S-1.13B, S-7.00..
Sampled mortar, Type S, 28-day design strength of 1800 psi, placed on Level 1 wall(s) at gridlines P.1/b26-30, .
Set No.Mix Temp (°F)Air Temp (°F)Location Qty. of Samples
1 58 42 P.1/b28 6
1 set of Mortar for a total of 6 samples
Additional Notes: Mortar was placed on CMU blocks on the South side of the gymnasium.
Rebar inspected as well.
Area of placement was enclosed and heated.
Plans Dated: 06/25/2021
Conformance:
The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable
standards of workmanship.
Limitations: These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or
guarantee of the work. Even with diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein
has not been reviewed by supervisory staff, therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below.
Reviewed by:
Arsene Ntwali
Inspector
02-04-2022
Date Jillian Kass
Staff Engineer
02-08-2022
Date
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
NYk
EZ/η ĂƚĞ >ŽĐĂƚŝŽŶ /ŶƐƉĞĐƚŽƌ /ƐƐƵĞZ&/ͬ^ƵďŵŝƚƚĂůEŽ͘ZĞƐŽůǀĞĚ͍;zͬEͿ ^ƵďͬŽŶƚƌĂĐƚŽƌ ĂƚĞZĞƐŽůǀĞĚ ŽŵŵĞŶƚϭ ϳͬϮϭͬϮϬϮϭ tĂůů͗ͬĚϯ ƌƐĞŶĞEƚǁĂůŝ>ŽǁďƌĞĂŬ͗DŝdžĞƐŝŶŐϯϱϬϬ͕ĚĞƐŝŐŶƐƚƌĞŶŐƚŚŽĨϯϱϬϬƉƐŝĂƚϮϴĚĂLJƐ͕ƐƉĞĐŝĨŝĞĚƐůƵŵƉĨƌŽŵϰƚŽϲŝŶ͕͘ƐƉĞĐŝĨŝĞĚĂŝƌĐŽŶƚĞŶƚĨƌŽŵϰ͘ϱйƚŽϳ͘ϱйz DĂƌŐƵĞƌŝƚĞdƵĞƐĚĂLJ͕:ĂŶƵĂƌLJϭϴ͕ϮϬϮϮϭϮ͗ϱϯWDKZƚŽĚǀŝƐĞϳĚĂLJďƌĞĂŬϬϴͬϭϬͬϮϬϮϭ^Ğƚϭсϭ͕ϴϲϬƉƐŝϮϴĚĂLJďƌĞĂŬϬϴͬϯϭͬϮϬϮϭ^ĞƚϭсϮ͕ϴϬϬƉƐŝ^ĞƚϭсϮ͕ϵϬϬƉƐŝ^Ğƚϭсϯ͕ϰϴϬƉƐŝϮϴĚĂLJĂǀĞƌĂŐĞсϯ͕ϬϲϬƉƐŝϮ ϳͬϮϴͬϮϬϮϭ &ŽŽƚŝŶŐ͗ϭϲͬ ƌƐĞŶĞEƚǁĂůŝ>ŽǁďƌĞĂŬ͗DŝdžĞƐŝŶŐϯϱϬϬ͕ĚĞƐŝŐŶƐƚƌĞŶŐƚŚŽĨϯϱϬϬƉƐŝĂƚϮϴĚĂLJƐ͕ƐƉĞĐŝĨŝĞĚƐůƵŵƉĨƌŽŵϰƚŽϲŝŶ͕͘ƐƉĞĐŝĨŝĞĚĂŝƌĐŽŶƚĞŶƚĨƌŽŵϰ͘ϱйƚŽϳ͘ϱй͗>Ăď>ŽŐEŽ͗͘ϭϱϱϭϵ;ϮϳϰϰͲϮϳϰϱͿz DĂƌŐƵĞƌŝƚĞdƵĞƐĚĂLJ͕:ĂŶƵĂƌLJϭϴ͕ϮϬϮϮϭϮ͗ϱϯWDKZƚŽĚǀŝƐĞϮϴĚĂLJďƌĞĂŬϬϴͬϯϭͬϮϬϮϭ^Ğƚϭсϯ͕ϯϱϬƉƐŝ^Ğƚϭсϯ͕ϱϬϬƉƐŝ^Ğƚϭсϯ͕ϲϮϬƉƐŝϱϲĚĂLJďƌĞĂŬϬϵͬϮϮͬϮϬϮϭ^ĞƚϭсƉƐŝϯ ϳͬϯϬͬϮϬϮϭ&ŽŽƚŝŶŐƐ^Ğƚηϭ͗ŽůƵŵŶůŝŶĞͬZŽǁ͗͘ϯͬĐϭϭϲ^ĞƚηϮŽůƵŵŵůŝŶĞͬZŽǁĐϱͬ,ƌƐĞŶĞEƚǁĂůŝ>ŽǁďƌĞĂŬ͗DŝdžĞƐŝŶŐϯϱϬϬ͕ĚĞƐŝŐŶƐƚƌĞŶŐƚŚŽĨϯϱϬϬƉƐŝĂƚϮϴĚĂLJƐ͕ƐƉĞĐŝĨŝĞĚƐůƵŵƉĨƌŽŵϰƚŽϲŝŶ͕͘ƐƉĞĐŝĨŝĞĚĂŝƌĐŽŶƚĞŶƚĨƌŽŵϰ͘ϱйƚŽϳ͘ϱйz DĂƌŐƵĞƌŝƚĞdƵĞƐĚĂLJ͕:ĂŶƵĂƌLJϭϴ͕ϮϬϮϮϭϮ͗ϱϯWDKZƚŽĚǀŝƐĞϮϴĚĂLJďƌĞĂŬϬϴͬϮϳͬϮϬϮϭ^Ğƚϭсϯ͕ϬϳϬƉƐŝ^Ğƚϭсϯ͕ϯϯϬƉƐŝ^Ğƚϭсϯ͕ϰϯϬƉƐŝ^ĞƚϮсϯ͕ϯϯϬƉƐŝ^ĞƚϮсϯ͕ϱϮϬƉƐŝ^ĞƚϮсϯ͕ϱϴϬƉƐŝϱϲĚĂLJďƌĞĂŬϬϵͬϮϰͬϮϬϮϭ^Ğƚηϭсϯ͕ϳϮϬƉƐŝ^ĞƚηϮсϯ͕ϲϳϬƉƐŝϰ ϴͬϯͬϮϬϮϭ&ŽŽƚŝŶŐƐ͗ůĞǀĂƚŽƌƉŝƚĨŽƵŶĚĂƚŝŽŶƌƐĞŶĞEƚǁĂůŝ>ŽǁďƌĞĂŬ͗DŝdžĞƐŝŶŐϯϱϬϬ͕ĚĞƐŝŐŶƐƚƌĞŶŐƚŚŽĨϯϱϬϬƉƐŝĂƚϮϴĚĂLJƐ͕ƐƉĞĐŝĨŝĞĚƐůƵŵƉĨƌŽŵϰƚŽϲŝŶ͕͘ƐƉĞĐŝĨŝĞĚĂŝƌĐŽŶƚĞŶƚĨƌŽŵϰ͘ϱйƚŽϳ͘ϱйz DĂƌŐƵĞƌŝƚĞdƵĞƐĚĂLJ͕:ĂŶƵĂƌLJϭϴ͕ϮϬϮϮϭϮ͗ϱϯWDKZƚŽĚǀŝƐĞϳĚĂLJďƌĞĂŬϬϴͬϭϬͬϮϬϮϭ^ĞƚϭсϮ͕ϲϭϬƉƐŝϮϴĚĂLJďƌĞĂŬϬϴͬϯϭͬϮϬϮϭ^Ğƚϭсϯ͕ϭϳϬƉƐŝϱϲĚĂLJďƌĞĂŬϵͬϮϴͬϮϬϮϭ^Ğƚϭсϯ͕ϯϯϬƉƐŝ^Ğƚϭсϯ͕ϰϵϬƉƐŝ^Ğƚϭсϯ͕ϳϬϬƉƐŝϱϲĚĂLJĂǀĞƌĂŐĞƐĞƚϭсϯ͕ϱϭϬƉƐŝϱ ϴͬϲͬϮϬϮϭ>ĞǀĞůϭtĂůůĂƚƵŝůĚŝŶŐĂŶĚͲͬĐϮƌƐĞŶĞEƚǁĂůŝ>ŽǁďƌĞĂŬ͗DŝdžĞƐŝŶŐϯϱϬϬ͕ĚĞƐŝŐŶƐƚƌĞŶŐƚŚŽĨϯϱϬϬƉƐŝĂƚϮϴĚĂLJƐ͕ƐƉĞĐŝĨŝĞĚƐůƵŵƉĨƌŽŵϰƚŽϲŝŶ͕͘ƐƉĞĐŝĨŝĞĚĂŝƌĐŽŶƚĞŶƚĨƌŽŵϰ͘ϱйƚŽϳ͘ϱйz DĂƌŐƵĞƌŝƚĞdƵĞƐĚĂLJ͕:ĂŶƵĂƌLJϭϴ͕ϮϬϮϮϭϮ͗ϱϯWDKZƚŽĚǀŝƐĞϳĚĂLJďƌĞĂŬϬϴͬϭϯͬϮϬϮϭ^ĞƚϭсϮ͕ϵϴϬƉƐŝϮϴĚĂLJďƌĞĂŬϬϵͬϯͬϮϬϮϭ^Ğƚϭсϯ͕ϭϳϬƉƐŝϱϲĚĂLJďƌĞĂŬϭϬͬϴͬϮϬϮϭ^Ğƚϭсϯ͕ϮϯϬƉƐŝ^Ğƚϭсϯ͕ϰϬϬƉƐŝϲ ϴͬϲͬϮϬϮϭ>ĞǀĞůϭtĂůůĂƚƵŝůĚŝŶŐĂŶĚͲ:͘ϳͬďϮϱƌƐĞŶĞEƚǁĂůŝ>ŽǁďƌĞĂŬ͗DŝdžĞƐŝŶŐϯϱϬϬ͕ĚĞƐŝŐŶƐƚƌĞŶŐƚŚŽĨϯϱϬϬƉƐŝĂƚϮϴĚĂLJƐ͕ƐƉĞĐŝĨŝĞĚƐůƵŵƉĨƌŽŵϰƚŽϲŝŶ͕͘ƐƉĞĐŝĨŝĞĚĂŝƌĐŽŶƚĞŶƚĨƌŽŵϰ͘ϱйƚŽϳ͘ϱйz DĂƌŐƵĞƌŝƚĞdƵĞƐĚĂLJ͕:ĂŶƵĂƌLJϭϴ͕ϮϬϮϮϭϮ͗ϱϯWDKZƚŽĚǀŝƐĞϳĚĂLJďƌĞĂŬϬϴͬϭϯͬϮϬϮϭ^ĞƚϮсϮ͕ϯϵϬƉƐŝϮϴĚĂLJďƌĞĂŬϬϵͬϯͬϮϬϮϭ^ĞƚϮсϯϯϴϬƉƐŝϱϲĚĂLJďƌĞĂŬϭϬͬϴͬϮϬϮϭ^ĞƚϭсƉƐŝϳ ϴͬϭϯͬϮϬϮϭ>ĞǀĞůϭ&ŽŽƚŝŶŐƐĂƚƵŝůĚŝŶŐ͗W͘ϭͬďϯϯƌƐĞŶĞEƚǁĂůŝ>ŽǁďƌĞĂŬ͗DŝdžĞƐŝŶŐϯϱϬϬ͕ĚĞƐŝŐŶƐƚƌĞŶŐƚŚŽĨϯϱϬϬƉƐŝĂƚϮϴĚĂLJƐ͕ƐƉĞĐŝĨŝĞĚƐůƵŵƉĨƌŽŵϰƚŽϲŝŶ͕͘ƐƉĞĐŝĨŝĞĚĂŝƌĐŽŶƚĞŶƚĨƌŽŵϰ͘ϱйƚŽϳ͘ϱйz DĂƌŐƵĞƌŝƚĞdƵĞƐĚĂLJ͕:ĂŶƵĂƌLJϭϴ͕ϮϬϮϮϭϮ͗ϱϯWDKZƚŽĚǀŝƐĞϭϳĚĂLJďƌĞĂŬϬϴͬϯϬͬϮϬϮϭ^Ğƚϭсϯ͕ϬϵϬƉƐŝϮϴĚĂLJďƌĞĂŬϬϵͬϭϬͬϮϬϮϭ^Ğƚϭсϯ͕ϰϲϬƉƐŝ^Ğƚϭсϯ͕ϱϭϬƉƐŝϱϲĚĂLJďƌĞĂŬϭϬͬϬϴͬϮϬϮϭ^ĞƚϭсƉƐŝ^ĞƚϭсƉƐŝϴ ϴͬϭϯͬϮϬϮϭ>ĞǀĞůϭ&ŽŽƚŝŶŐƐĂƚƵŝůĚŝŶŐ͗:͘ϯͬďϮϰƌƐĞŶĞEƚǁĂůŝ>ŽǁďƌĞĂŬ͗DŝdžĞƐŝŶŐϯϱϬϬ͕ĚĞƐŝŐŶƐƚƌĞŶŐƚŚŽĨϯϱϬϬƉƐŝĂƚϮϴĚĂLJƐ͕ƐƉĞĐŝĨŝĞĚƐůƵŵƉĨƌŽŵϰƚŽϲŝŶ͕͘ƐƉĞĐŝĨŝĞĚĂŝƌĐŽŶƚĞŶƚĨƌŽŵϰ͘ϱйƚŽϳ͘ϱйz DĂƌŐƵĞƌŝƚĞdƵĞƐĚĂLJ͕:ĂŶƵĂƌLJϭϴ͕ϮϬϮϮϭϮ͗ϱϯWDKZƚŽĚǀŝƐĞϳĚĂLJďƌĞĂŬϬϴͬϮϬͬϮϬϮϭ^ĞƚϭсϮ͕ϯϮϬƉƐŝϮϴĚĂLJďƌĞĂŬϬϵͬϭϬͬϮϬϮϭ^ĞƚϭсϮ͕ϴϰϬƉƐŝϱϲĚĂLJďƌĞĂŬϭϬͬϬϴͬϮϬϮϭ^ĞƚϭсƉƐŝ^ĞƚϭсƉƐŝ
ϵ ϴͬϮϬͬϮϬϮϭ>ĞǀĞůϭ&ŽŽƚŝŶŐƐĂƚ&ŽƵŶĚĂƚŝŽŶ͗tĂůů͗,ͬĐϱƌƐĞŶĞEƚǁĂůŝ>ŽǁďƌĞĂŬ͗DŝdžĞƐŝŶŐϯϱϬϬ͕ĚĞƐŝŐŶƐƚƌĞŶŐƚŚŽĨϯϱϬϬƉƐŝĂƚϮϴĚĂLJƐ͕ƐƉĞĐŝĨŝĞĚƐůƵŵƉĨƌŽŵϰƚŽϲŝŶ͕͘ƐƉĞĐŝĨŝĞĚĂŝƌĐŽŶƚĞŶƚĨƌŽŵϰ͘ϱйƚŽϳ͘ϱй͗>Ăď>ŽŐEŽ͗͘ϭϱϴϲϬ;ϯϬϮϰͿz DĂƌŐƵĞƌŝƚĞdƵĞƐĚĂLJ͕:ĂŶƵĂƌLJϭϴ͕ϮϬϮϮϭϮ͗ϱϯWDKZƚŽĚǀŝƐĞϳĚĂLJďƌĞĂŬϬϴͬϮϳͬϮϬϮϭ^ĞƚϭсϮ͕ϴϭϬƉƐŝϮϴĚĂLJďƌĞĂŬϬϵͬϭϳͬϮϬϮϭ^Ğƚϭсϯ͕ϰϰϬƉƐŝ^Ğƚϭсϯ͕ϱϬϬƉƐŝϱϲĚĂLJďƌĞĂŬϭϬͬϭϱͬϮϬϮϭ^Ğƚϭсϯ͕ϵϮϬƉƐŝ^Ğƚϭсϰ͕ϬϮϬƉƐŝϭϬ ϵͬϯͬϮϬϮϭ >ĞǀĞůϭtĂůů͖hͬĂϱ ƌƐĞŶĞEƚǁĂůŝ>ŽǁďƌĞĂŬ͗DŝdžĞƐŝŶŐϯϱϬϬ͕ĚĞƐŝŐŶƐƚƌĞŶŐƚŚŽĨϯϱϬϬƉƐŝĂƚϮϴĚĂLJƐ͕ƐƉĞĐŝĨŝĞĚƐůƵŵƉĨƌŽŵϰƚŽϲŝŶ͕͘ƐƉĞĐŝĨŝĞĚĂŝƌĐŽŶƚĞŶƚĨƌŽŵϰ͘ϱйƚŽϳ͘ϱй͖>Ăď>ŽŐEŽ͗͘ϭϲϬϲϳ;ϯϭϮϯͿz DĂƌŐƵĞƌŝƚĞdƵĞƐĚĂLJ͕:ĂŶƵĂƌLJϭϴ͕ϮϬϮϮϭϮ͗ϱϯWDKZƚŽĚǀŝƐĞϳĚĂLJďƌĞĂŬϬϵͬϭϬͬϮϬϮϭ^ĞƚϭсϮ͕ϬϱϬƉƐŝϮϴĚĂLJďƌĞĂŬϭϬͬϬϭͬϮϬϮϭ^Ğƚϭсϯ͕ϭϬϬƉƐŝϱϲĚĂLJďƌĞĂŬϭϬͬϮϵͬϮϬϮϭ^Ğƚϭсϯ͕ϱϭϬƉƐŝ^Ğƚϭсϯ͕ϲϯϬƉƐŝ^Ğƚϭсϯ͕ϲϲϬƉƐŝϭϭ ϵͬϵͬϮϬϮϭ >ĞǀĞůϭ&ŽŽƚŝŶŐ͗D͘ϱͬďϭϳ ƌƐĞŶĞEƚǁĂůŝ>ŽǁďƌĞĂŬ͗DŝdžĞƐŝŶŐϯϱϬϬ͕ĚĞƐŝŐŶƐƚƌĞŶŐƚŚŽĨϯϱϬϬƉƐŝĂƚϮϴĚĂLJƐ͕ƐƉĞĐŝĨŝĞĚƐůƵŵƉĨƌŽŵϰƚŽϲŝŶ͕͘ƐƉĞĐŝĨŝĞĚĂŝƌĐŽŶƚĞŶƚĨƌŽŵϰ͘ϱйƚŽϳ͘ϱй͖>Ăď>ŽŐEŽ͗͘ϭϲϭϯϮ;ϯϭϳϱͿz DĂƌŐƵĞƌŝƚĞdƵĞƐĚĂLJ͕:ĂŶƵĂƌLJϭϴ͕ϮϬϮϮϭϮ͗ϱϯWDKZƚŽĚǀŝƐĞϳĚĂLJďƌĞĂŬϬϵͬϭϲͬϮϬϮϭ^ĞƚϭсϮ͕ϰϬϬƉƐŝϮϴĚĂLJďƌĞĂŬϭϬͬϬϳͬϮϬϮϭ^Ğƚϭсϯ͕ϰϴϬƉƐŝ^Ğƚϭсϯ͕ϰϵϬƉƐŝϱϲĚĂLJďƌĞĂŬϭϭͬϬϰͬϮϬϮϭ^Ğƚϭсϰ͕ϬϱϬƉƐŝ^Ğƚϭсϰ͕ϮϰϬƉƐŝϭϮ ϵͬϭϬͬϮϬϮϭ >ĞǀĞůϭ&ŽŽƚŝŶŐ͗>͘ϵͬďϮ ƌƐĞŶĞEƚǁĂůŝ>ŽǁďƌĞĂŬ͗DŝdžĞƐŝŶŐϯϱϬϬ͕ĚĞƐŝŐŶƐƚƌĞŶŐƚŚŽĨϯϱϬϬƉƐŝĂƚϮϴĚĂLJƐ͕ƐƉĞĐŝĨŝĞĚƐůƵŵƉĨƌŽŵϰƚŽϲŝŶ͕͘ƐƉĞĐŝĨŝĞĚĂŝƌĐŽŶƚĞŶƚĨƌŽŵϰ͘ϱйƚŽϳ͘ϱй͖>Ăď>ŽŐEŽ͗͘ϭϲϭϯϯ;ϯϭϳϲͿz DĂƌŐƵĞƌŝƚĞdƵĞƐĚĂLJ͕:ĂŶƵĂƌLJϭϴ͕ϮϬϮϮϭϮ͗ϱϯWDKZƚŽĚǀŝƐĞϳĚĂLJďƌĞĂŬϬϵͬϭϳͬϮϬϮϭ^ĞƚϭсϮ͕ϯϯϬƉƐŝϮϴĚĂLJďƌĞĂŬϭϬͬϬϴͬϮϬϮϭ^Ğƚϭсϯ͕ϰϱϬƉƐŝ^Ğƚϭсϯ͕ϰϱϬƉƐŝ^Ğƚϭсϯ͕ϰϵϬƉƐŝϱϲĚĂLJďƌĞĂŬϭϭͬϬϱͬϮϬϮϭ^Ğƚϭсϰ͕ϬϲϬƉƐŝϭϯ ϴͬϭϯͬϮϬϮϭ>ĞǀĞůϭ&ŽŽƚŝŶŐƐĂƚƵŝůĚŝŶŐ͗^ĞƚηϭW͘ϭͬďϯϯ^ĞƚηϮ:͘ϯͬďϮϰƌƐĞŶĞEƚǁĂůŝ>ŽǁďƌĞĂŬ͗DŝdžĞƐŝŶŐϯϱϬϬ͕ĚĞƐŝŐŶƐƚƌĞŶŐƚŚŽĨϯϱϬϬƉƐŝĂƚϮϴĚĂLJƐ͕ƐƉĞĐŝĨŝĞĚƐůƵŵƉĨƌŽŵϰƚŽϲŝŶ͕͘ƐƉĞĐŝĨŝĞĚĂŝƌĐŽŶƚĞŶƚĨƌŽŵϰ͘ϱйƚŽϳ͘ϱй͖>Ăď>ŽŐEŽ͗͘ϭϱϳϰϱ;ϮϵϰϱͲϮϵϰϲͿz DĂƌŐƵĞƌŝƚĞdƵĞƐĚĂLJ͕:ĂŶƵĂƌLJϭϴ͕ϮϬϮϮϭϮ͗ϱϯWDKZƚŽĚǀŝƐĞϳĚĂLJďƌĞĂŬϬϴͬϮϬͬϮϬϮϭ^ĞƚϮсϮ͕ϯϮϬƉƐŝϮϴĚĂLJďƌĞĂŬϬϵͬϭϬͬϮϬϮϭ^Ğƚϭсϯ͕ϰϲϬƉƐŝ^Ğƚϭсϯ͕ϱϭϬƉƐŝ^ĞƚϮсϮ͕ϴϰϬƉƐŝϱϲĚĂLJďƌĞĂŬϭϬͬϬϴͬϮϬϮϭ^Ğƚϭсϯ͕ϳϲϬƉƐŝ^Ğƚϭсϯ͕ϴϱϬƉƐŝ^ĞƚϮсϯ͕ϮϲϬƉƐŝ^ĞƚϮсϯ͕ϬϯϬƉƐŝ^ĞƚϮсϯ͕ϭϱϬƉƐŝ^Ğƚ Ϯсϯ͕ϮϲϬ ƉƐŝϭϰ ϴͬϭϳͬϮϬϮϭ>ĞǀĞůϭ&ŽŽƚŝŶŐƐĂƚƵŝůĚŝŶŐ͗^͘ϭͬďϮϳƌƐĞŶĞEƚǁĂůŝ>ŽǁďƌĞĂŬ͗DŝdžĞƐŝŶŐϯϱϬϬ͕ĚĞƐŝŐŶƐƚƌĞŶŐƚŚŽĨϯϱϬϬƉƐŝĂƚϮϴĚĂLJƐ͕ƐƉĞĐŝĨŝĞĚƐůƵŵƉĨƌŽŵϰƚŽϲŝŶ͕͘ƐƉĞĐŝĨŝĞĚĂŝƌĐŽŶƚĞŶƚĨƌŽŵϰ͘ϱйƚŽϳ͘ϱй͖>Ăď>ŽŐEŽ͗͘ϭϱϳϰϱ;ϮϵϰϱͲϮϵϰϲͿz DĂƌŐƵĞƌŝƚĞdƵĞƐĚĂLJ͕:ĂŶƵĂƌLJϭϴ͕ϮϬϮϮϭϮ͗ϱϯWDKZƚŽĚǀŝƐĞϳĚĂLJďƌĞĂŬϬϴͬϮϰͬϮϬϮϭ^ĞƚϭсϮ͕ϱϭϬƉƐŝϮϴĚĂLJďƌĞĂŬϬϵͬϭϰͬϮϬϮϭ^Ğƚϭсϯ͕ϮϴϬƉƐŝ^Ğƚϭсϯ͕ϰϯϬƉƐŝϱϲĚĂLJďƌĞĂŬϭϬͬϭϮͬϮϬϮϭ^Ğƚϭсϰ͕ϬϳϬƉƐŝ^Ğƚϭсϰ͕ϭϭϬƉƐŝϭϱ ϵͬϮϯͬϮϬϮϭ>ĞǀĞůϭ&ŽŽƚŝŶŐƐĂƚƵŝůĚŝŶŐ͗WϳͬĂϭϴƌƐĞŶĞEƚǁĂůŝ>ŽǁďƌĞĂŬ͗DŝdžĞƐŝŶŐϱϬϬϬ͕ĚĞƐŝŐŶƐƚƌĞŶŐƚŚŽĨϱ͕ϬϬϬƉƐŝĂƚϮϴĚĂLJƐ͕ƐƉĞĐŝĨŝĞĚƐůƵŵƉĨƌŽŵϱƚŽϴŝŶ͕͘ƐƉĞĐŝĨŝĞĚĂŝƌĐŽŶƚĞŶƚĨƌŽŵϰйƚŽϳй͖>Ăď>ŽŐEŽ͗͘ϭϲϮϴϴ;ϯϮϲϰͿz DĂƌŐƵĞƌŝƚĞdƵĞƐĚĂLJ͕:ĂŶƵĂƌLJϭϴ͕ϮϬϮϮϭϮ͗ϱϯWDKZƚŽĚǀŝƐĞϳĚĂLJďƌĞĂŬϬϵͬϯϬͬϮϬϮϭ^Ğƚϭсϯ͕ϱϭϬƉƐŝϮϴĚĂLJďƌĞĂŬϭϬͬϮϭͬϮϬϮϭ^Ğƚϭсϰ͕ϰϳϬƉƐŝϱϲĚĂLJďƌĞĂŬϭϭͬϭϴͬϮϬϮϭ^Ğƚϭсϰ͕ϴϴϬƉƐŝ^Ğƚϭсϱ͕ϭϮϬƉƐŝ^Ğƚϭсϱ͕ϮϭϬƉƐŝϭϲ ϭϭͬϮͬϮϬϮϭ>ĞǀĞůϭ^ůĂďĂƚƵŝůĚŝŶŐ͗>ŝŶĞͲϭ͕ZŽǁϭͲďĞĨŽƌĞϭϲŶĞĂDƵƐŚŝ DĞĂƐƵƌĞĚ&ůŽŽƌ&ůĂƚŶĞƐƐ͕>ĞǀĞůŶĞƐƐ;ϯϰ͘ϳĂŶĚϭϴ͘ϯͿĚŝĚŶŽƚŵĞĞƚŽǀĞƌĂůůƉƌŽũĞĐƚƌĞƋƵŝƌĞŵĞŶƚ;ϯϱĂŶĚϮϱͿ E DĂƌŐƵĞƌŝƚĞdƵĞƐĚĂLJ͕:ĂŶƵĂƌLJϭϴ͕ϮϬϮϮϭϮ͗ϱϯWDKZƚŽĚǀŝƐĞ
ϭϳ ϵͬϮϳͬϮϬϮϭ>ĞǀĞůϭtĂůůĂƚYͲW͘ϳͬĂϭϴ͕ĂϭϴͲϮϰͬtϭϳ͗^ĂŵƉůĞĚΛE͘ϰͬďϱƌƐĞŶĞEƚǁĂůŝ>ŽǁďƌĞĂŬ͗DŝdžĞƐŝŶŐϱϬϬϬ͕ĚĞƐŝŐŶƐƚƌĞŶŐƚŚŽĨϱ͕ϬϬϬƉƐŝĂƚϮϴĚĂLJƐ͕ƐƉĞĐŝĨŝĞĚƐůƵŵƉĨƌŽŵϱƚŽϴŝŶ͕͘ƐƉĞĐŝĨŝĞĚĂŝƌĐŽŶƚĞŶƚĨƌŽŵϰйƚŽϳй͖>Ăď>ŽŐEŽ͗͘ϭϲϯϯϵ;ϯϯϮϯͿz DĂƌŐƵĞƌŝƚĞdƵĞƐĚĂLJ͕:ĂŶƵĂƌLJϭϴ͕ϮϬϮϮϭϮ͗ϱϯWDKZƚŽĚǀŝƐĞϳĚĂLJďƌĞĂŬϭϬͬϬϰͬϮϬϮϭ^Ğƚϭсϯ͕ϱϭϬƉƐŝϮϴĚĂLJďƌĞĂŬϭϬͬϮϱͬϮϬϮϭ^Ğƚϭсϰ͕ϭϳϬƉƐŝϱϲĚĂLJďƌĞĂŬϭϭͬϮϮͬϮϬϮϭ^Ğƚϭсϰ͕ϳϬϬƉƐŝϵϬĚĂLJďƌĞĂŬϭϮͬϮϲͬϮϬϮϭ^ĞƚϭсƉƐŝ^ĞƚϭсƉƐŝϭϴ ϭϮͬϭϲͬϮϬϮϭ>ĞǀĞůϭ͕ĂƌĞĂΛ^͘ϭͲ^͘ϱͬďϭϭďŽƚƚŽŵƐŽŶůLJ͗>ĞǀĞůϭϲΛ<͘ϵͲEͬďϯϯƐƚĞĞůŐŝƌƚƐ͗>ĞǀĞůůŽǁƌŽŽĨͬŚŝŐŚƌŽŽĨΛE͘ϵͲ<ͬďϭ͕<ͬďϭͲďϮϮ͕>нW͘ϳͬĂϭϳͲďϮϭ͕>W͘ϳͬĂϭϳнďϮϭ͕sͲs͘ϵͬĂϭϱ͕tͬĂϭͲĂϭϰ͕tͲsͬĂϭ͕sͬĂϭͲĂϮ͕sͲhͬĂϮdŽŶLJWĂƌĂĚŝƐtW^ƐŶŽƚĂǀĂŝůĂďůĞĨŽƌƌĞǀŝĞǁĨŽƌ^ƚĞůůĂƌ^ƚĞĞůƌĞĐƚŽƌƐŽƌhŶŝƚĞĚ^ƚĞĞů͘^ƚĞůůĂƌ^ƚĞĞůhƐĞĚ&tƉƌŽĐĞƐƐŝŶƚŚĞϮ&͕ϰ&͕Ϯ'ĂŶĚϯ'ƉŽƐƐŝƚŝŽŶƐ͘hŶŝƚĞĚ^ƚĞĞůƵƐĞĚƚŚĞ^DtƉƌŽĐĞƐƐŝŶƚŚĞϮ&ƉŽƐƐŝƚŝŽŶ͘ƌŶtWYZƐƌĞĐŝĞǀĞĚĨŽƌ^ƚĞůůĂƌ^ƚĞĞůƌĞĐƚŽƌƐƐŚŽǁŶŽǁĞůĚĞƌƐƋƵĂůŝĨŝĞĚĨŽƌ&tǁĞůĚƐŝŶƚŚĞϰ&Žƌϯ'ƉŽƐŝƚŝŽŶƐ͘E WD KZƚŽĚǀŝƐĞϭϵ ϭϮͬϭϳͬϮϬϮϭ ƚŽƉĂŶĚďŽƚƚŽŵƉůĂƚĞƐ dŽŶLJWĂƌĂĚŝƐŽŶƚƌĂĐƚŽƌŚĂƐĨĂŝůĞĚƚŽŵĂŝŶƚĂŝŶϯͬϰΗŵŝŶŝŵƵŵĚŝƐƚĂŶĐĞĨƌŽŵƐĐƌĞǁƚŽĞĚŐĞŽĨůŝŐŚƚŐĂƵŐĞƐƵƌĨĂĐĞƐĂƐĐĂůůĞĚĨŽƌŝŶ'ĞŶĞƌĂůEŽƚĞϰŽŶ^<Ͳϯ͘E WD KZƚŽĚǀŝƐĞϮϬ ϭϮͬϭϴͬϮϬϮϭ>ĞǀĞůϭDĞƚĂůƉĂŶƐƚĂŝƌƐĂƚƵŝůĚŝŶŐdŽŶLJWĂƌĂĚŝƐ>ŽǁƌĞĂŬ͗Dŝdžη͗ϰϬϬϬ'ZE͗^ůƵŵƉϱͲϵĂŝƌϬͲϯĞƐŝŐŶ^ƚƌĞŶŐƚŚ;ƉƐŝͿ͗ϰ͕ϬϬϬΛϮϴĚĂLJƐ͗>Ăď>ŽŐEŽ͗͘ϭϳϮϴϮ;ϯϲϴϭͿEWDKZƚŽĚǀŝƐĞϳĚĂLJďƌĞĂŬϭϭͬϮϱͬϮϬϮϭ^ĞƚϭсϮ͕ϬϲϬƉƐŝϮϴĚĂLJďƌĞĂŬϭϮͬϭϲͬϮϬϮϭ^ĞƚϭсϮ͕ϱϴϬƉƐŝϱϲĚĂLJďƌĞĂŬϬϭͬϭϯͬϮϬϮϮ^Ğƚϭсϯ͕ϮϮϬƉƐŝϵϬĚĂLJďƌĞĂŬϬϮͬϭϲͬϮϬϮϮ^ĞƚϭсƉƐŝ^ĞƚϭсƉƐŝϮϭ ϭϮͬϮϭͬϮϬϮϭ ůŽĐĂƚŝŽŶƐĂƚďƵŝůĚŝŶŐĂŶĚ ůĂŬĞDƵůůĞŶƐdŚĞŝƚĞŵƐĂƐůŝƐƚĞĚŚĞƌĞŝŶŚĂǀĞŶŽƚďĞĞŶĂĐĐŽŵƉůŝƐŚĞĚŝŶĂĐĐŽƌĚĂŶĐĞǁŝƚŚƚŚĞĂƉƉƌŽǀĞĚĚŽĐƵŵĞŶƚƐ͕ƉůĂŶƐĂŶĚƐƉĞĐŝĨŝĐĂƚŝŽŶƐ͗EŽ͘ϭϬƐĐƌĞǁŵŝƐƐŝŶŐĂƚŝŶƐŝĚĞůĞŐŽĨƚƌĂĐŬĐŽŶŶĞĐƚŝŽŶƐ͘ŽŶƚƌĂĐƚŽƌƚŽŝŶƐƚĂůůŝŶƐŝĚĞůĞŐŶŽϭϬƐĐƌĞǁƐǁŝƚŚůŝĨƚĂĐĐĞƐƐ͘WŝŶƐĂƚƚLJƉŝĐĂůƉĂƌĂƉĞƚĚĞƚĂŝůǁŝƚŚŝŶƚŚŝƐĂƌĞĂŶŽƚƐƉĂĐĞĚƉƌŽƉĞƌůLJ͘WŝŶƐŝŶƐƚĂůůĞĚĂƚƌĂŶĚŽŵůŽĐĂƚŝŽŶƐŝŶƐƚĞĂĚŽĨϱƉŝŶƐǁŝƚŚŝŶƚŽƉϮΗĂŶĚϰƉŝŶƐǁŝƚŚŝŶďŽƚƚŽŵϮΗ͘E WD KZƚŽĚǀŝƐĞϮϮ ϭͬϭϬͬϮϬϮϮ>ĞǀĞůϭ͕ŐƌŝĚůŝŶĞƐW͘ϭͲ:͘ϭͬ͘ϯϯďĚƵůǁĂŚĂďďƵůŐĂƐĞŵDhďůŽĐŬƐƚŚĞsĞƌƚŝĐĂůηϳďLJϭϲ͟ŶŽƚƌĞĂĐŚŝŶŐŽǀĞƌůĂƉƌĞƋƵŝƌĞŵĞŶƚƐ͕ĂŶĚŵĂLJŐĞƚƚŝŶŐĐŽŶĨůŝĐƚǁŝƚŚŽƚŚĞƌƐƚƌƵĐƚƵƌĞƐĂƐŐŽŝŶŐƵƉ͘z WD ϭͬϭϯͬϮϬϮϮ KZƚŽĚǀŝƐĞϮϯ ϭϭͬϴͬϮϬϮϭ>ĞǀĞůϮ^ĂůďŽŶŵĞƚĂůĚĞĐŬĂƚƵŝůĚŝŶŐ͗ͬϰƌƐĞŶĞEƚǁĂůŝ>ŽǁƌĞĂŬ͗Dŝdžη͗ϰϬϬϬ'ZE͗^ůƵŵƉϱͲϵĂŝƌϬͲϯĞƐŝŐŶ^ƚƌĞŶŐƚŚ;ƉƐŝͿ͗ϰ͕ϬϬϬΛϮϴĚĂLJƐ͗>Ăď>ŽŐEŽ͗͘ϭϲϵϵϱEWDKZƚŽĚǀŝƐĞϳĚĂLJďƌĞĂŬϭϭͬϭϱͬϮϬϮϭ^ĞƚϭсϮ͕ϴϴϬƉƐŝϮϴĚĂLJďƌĞĂŬϭϮͬϬϲͬϮϬϮϭ^Ğƚϭсϯ͕ϴϮϬƉƐŝϱϲĚĂLJďƌĞĂŬϬϭͬϬϯͬϮϬϮϮ^Ğƚϭсϰ͕ϭϲϬƉƐŝ^Ğƚϭсϰ͕ϮϱϬƉƐŝ^Ğƚϭсϰ͕ϯϬϬƉƐŝϮϰ ϭϮͬϮͬϮϬϮϭ ƵŝůĚŝŶŐ͗&Ͳ'ͬϳͲϵ ƌƐĞŶĞEƚǁĂůŝ>ŽǁƌĞĂŬ͗Dŝdžη͗ϯϬϬϬE͗^ůƵŵƉϱͲϵĂŝƌϬͲϯĞƐŝŐŶ^ƚƌĞŶŐƚŚ;ƉƐŝͿ͗ϯ͕ϬϬϬΛϮϴĚĂLJƐ͗>Ăď>ŽŐEŽ͗͘ϭϳϮϮϲ;ϯϳϯϱͿEWDKZƚŽĚǀŝƐĞϳĚĂLJďƌĞĂŬϭϮͬϬϵͬϮϬϮϭ^Ğƚϭсϭ͕ϮϵϬƉƐŝϮϴĚĂLJďƌĞĂŬϭϮͬϯϬͬϮϬϮϭ^Ğƚϭсϭ͕ϳϮϬƉƐŝϱϲĚĂLJďƌĞĂŬϬϭͬϮϳͬϮϬϮϮ^Ğƚϭсϭ͕ϳϴϬƉƐŝϵϬĚĂLJďƌĞĂŬϬϯͬϮͬϮϬϮϮ^ĞƚϭсƉƐŝϮϱ ϭͬϭϵͬϮϬϮϮϭͲWͬ͘ϭϬ>ŽǁƌŽŽĨŵĞĚŝĂĐĞŶƚĞƌϮͲWͬ͘ϭϮ>ŽǁƌŽŽĨŵĞĚŝĂĐĞŶƚĞƌϯͲϱͬt&ŽƵŶĚĂƚŝŽŶƉůĂŶZŽŶĞLJEĂŬŚŽƵůŽŚĞƐŝŽŶͬĚŚĞƐŝŽŶŽĨ^&ZDƉƉůŝĞĚƚŽ^ƚƌƵĐƚƵƌĂůDĞŵďĞƌƐĨĂŝůƵƌĞ͗&ŝƌĞƉƌŽŽĨŝŶŐŵĂƚĞƌŝĂůŝƐŶŽƚĂĚŚĞƌŝŶŐƚŽƚŚĞŐůƵĞ͘EŽƚĞĚƚŚĂƚŵĂƚĞƌŝĂůǁĂƐǁĞƚƚŽƚŽƵĐŚĂŶĚϮƐĂŵƉůĞƐƚĂŬĞŶE WD KZƚŽĚǀŝƐĞϮϲ ϭϭͬϭϲͬϮϬϮϭ ƵŝůĚŝŶŐ͗EͬďϮϬ͕ϱͬ^ ƌƐĞŶĞEƚǁĂůŝ 'ƌŽƵƚ͕ůŽǁďƌĞĂŬ͗ĞƐŝŐŶ^ƚƌĞŶŐƚŚ;ƉƐŝͿ͗ϯ͕ϬϬϬΛϮϴĚĂLJƐ͕>Ăď>ŽŐEŽ͗͘ϭϳϬϴϳ;ϯϲϱϭͿ E WDKZƚŽĚǀŝƐĞϳĚĂLJďƌĞĂŬϭϭͬϮϯͬϮϬϮϭ^ĞƚϭсϮ͕ϯϬϬƉƐŝϮϴĚĂLJďƌĞĂŬϭϮͬϭϰͬϮϬϮϭ^ĞƚϭсϮ͕ϲϲϬƉƐŝϱϲĚĂLJďƌĞĂŬϬϭͬϭϭͬϮϬϮϮ^Ğƚϭсϯ͕ϯϬϬƉƐŝ^Ğƚϭсϯ͕ϯϯϬƉƐŝ
Ϯϳ ϭϭͬϭϴͬϮϬϮϭ ƵŝůĚŝŶŐ͗d͘ϭͬϳ ƌƐĞŶĞEƚǁĂůŝ 'ƌŽƵƚ͕ůŽǁďƌĞĂŬ͗ĞƐŝŐŶ^ƚƌĞŶŐƚŚ;ƉƐŝͿ͗ϯ͕ϬϬϬΛϮϴĚĂLJƐ͕>Ăď>ŽŐEŽ͗͘ϭϳϭϭϵ;ϯϲϳϴͿEWDDŽŶĚĂLJ͕:ĂŶƵĂƌLJϯϭ͕ϮϬϮϮϴ͗ϰϳDKZƚŽĚǀŝƐĞϳĚĂLJďƌĞĂŬϭϭͬϮϱͬϮϬϮϭ^Ğƚϭсϭ͕ϴϯϬƉƐŝϮϴĚĂLJďƌĞĂŬϭϮͬϭϲͬϮϬϮϭ^ĞƚϭсϮ͕ϮϵϬƉƐŝϱϲĚĂLJďƌĞĂŬϬϭͬϭϯͬϮϬϮϮ^ĞƚϭсϮ͕ϰϱϬƉƐŝϵϬĚĂLJďƌĞĂŬϬϮͬϭϲͬϮϬϮϮ^ĞƚϭсƉƐŝϮϴ ϭϭͬϭϴͬϮϬϮϭ ƵŝůĚŝŶŐ͗d͘ϭͬϳ ƌƐĞŶĞEƚǁĂůŝ ŽŶĐƌĞƚĞ͕ůŽǁďƌĞĂŬ͗ĞƐŝŐŶ^ƚƌĞŶŐƚŚ;ƉƐŝͿ͗ϰ͕ϬϬϬΛϮϴĚĂLJƐ͕>Ăď>ŽŐEŽ͗͘ϭϳϮϴϮ;ϯϲϴϭͿ E WDKZƚŽĚǀŝƐĞϳĚĂLJďƌĞĂŬϭϭͬϮϱͬϮϬϮϭ^ĞƚϭсϮ͕ϬϲϬƉƐŝϮϴĚĂLJďƌĞĂŬϭϮͬϭϲͬϮϬϮϭ^ĞƚϭсϮ͕ϱϴϬƉƐŝϱϲĚĂLJďƌĞĂŬϬϭͬϭϯͬϮϬϮϮ^Ğƚϭсϯ͕ϮϮϬƉƐŝϵϬĚĂLJďƌĞĂŬϬϮͬϭϲͬϮϬϮϮ^ĞƚϭсƉƐŝ^ĞƚϭсƉƐŝϮϵ ϭϭͬϮϮͬϮϬϮϭ ƵŝůĚŝŶŐ͗d͘ϭͬϲ ƌƐĞŶĞEƚǁĂůŝ ŽŶĐƌĞƚĞ͕ůŽǁďƌĞĂŬ͗ĞƐŝŐŶ^ƚƌĞŶŐƚŚ;ƉƐŝͿ͗ϯ͕ϬϬϬΛϮϴĚĂLJƐ͕>Ăď>ŽŐEŽ͗͘ϭϳϭϵϳ;ϯϳϮϴͿ E WDKZƚŽĚǀŝƐĞϳĚĂLJďƌĞĂŬϭϭͬϮϵͬϮϬϮϭ^Ğƚϭсϭ͕ϳϮϬƉƐŝϮϴĚĂLJďƌĞĂŬϭϮͬϮϬͬϮϬϮϭ^ĞƚϭсϮ͕ϯϭϬƉƐŝϱϲĚĂLJďƌĞĂŬϬϭͬϭϳͬϮϬϮϮ^ĞƚϭсϮ͕ϯϳϬƉƐŝϵϬĚĂLJďƌĞĂŬϬϮͬϮϬͬϮϬϮϮ^ĞƚϭсƉƐŝ^ĞƚϭсƉƐŝϯϬ ϭϮͬϮϳͬϮϬϮϭ >ĞǀĞůϮ͕>Ͳ<͘ϴͬďϮϭͲďϮϮ ƌŝĐWŝƚŵĂŶ 'ƌŽƵƚ͕ůŽǁďƌĞĂŬ͗ĞƐŝŐŶ^ƚƌĞŶŐƚŚ;ƉƐŝͿ͗Ϯ͕ϱϬϬΛϮϴĚĂLJƐ͗>Ăď>ŽŐEŽ͗͘ϭϳϴϵϬ;ϰϬϭϬͿ E WDKZƚŽĚǀŝƐĞϯϮĚĂLJďƌĞĂŬϬϭͬϮϴͬϮϬϮϮ^Ğƚϭсϭ͕ϭϵϬƉƐŝϱϲĚĂLJďƌĞĂŬϬϮͬϮϭͬϮϬϮϮ^ĞƚϭсƉƐŝ^ĞƚϭсƉƐŝ^ĞƚϭсƉƐŝϯϭ ϮͬϵͬϮϬϮϮ'ƌĂĚĞŽŶ>ĞǀĞůϭĂƚ>ŝŶĞD͘ϱͲY͕ZŽǁĂϭϴͲWĂƐƐĂϯϬŶĞĂDƵƐŚŝ&ůŽŽƌ>ĞǀĞůŶĞƐƐŵĞĂƐƵƌĞŵĞŶƚĚŝĚŶŽƚŵĞĞƚƉƌŽũĞĐƚƐƉĞĐƌĞƋƵŝƌĞŵĞŶƚƐ͘ϯ͘ϵ&/E/^,/E'&>KKZ^E^>^^ƉĞĐŝĨŝĞĚŽǀĞƌĂůůǀĂůƵĞƐŽĨĨůĂƚŶĞƐƐ͕&;&Ϳϯϱ͖ĂŶĚŽĨůĞǀĞůŶĞƐƐ͕&;>ͿϮϱ͖ǁŝƚŚŵŝŶŝŵƵŵůŽĐĂůǀĂůƵĞƐŽĨĨůĂƚŶĞƐƐ͕&;&ͿϮϰ͖ĂŶĚŽĨůĞǀĞůŶĞƐƐ͕&;>Ϳϭϳ͖ĨŽƌƐůĂďƐͲŽŶŐƌĂĚĞE WD KZƚŽĚǀŝƐĞ^ƚĂƚƵƐ͗tŽƌŬͲŝŶͲWƌŽŐƌĞƐƐ>ĞŐĞŶĚ͗^ƚĂƚƵƐ͗ůŽƐĞĚ^ƚĂƚƵƐ͗KƉĞŶ
TESTING
INSPECTION
ENGINEERING
Field Number: 4 Masonry Grout Compression Test
Project Name: Dennis Yarmouth Middle School Permit # : BLD-21-006153
Project No.:5951 Sampled by: Arsene Ntwali Report Date: 01/31/2022
Client: PMA Consultants, LLC
Date of Sampling: 01/24/2022 Lab Log No.: 17921 (4001, 4021)
Reviewed by: Edmychael Colon, Lab
Manager
01/31/2022
Date
ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C1019, C31, C143, C231, C470, C511, C1077,
C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39.
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 1 of 1
Information provided by Field Technician
Mix #: Spec Mix Supplier: CCRM Contractor: Lighthouse
Set: 1 of 1 Truck #: N/A
Design Strength (psi): 3,000 @28
days Ticket#: N/A
Sample Material/Shape: ASTM C1019 Compressive Testing of Masonry Grout
(Grout Box)Type of Structure: wall
Location: Onsite
Location for overall pour:
Location when sampled: Gymnasium J.7/b28-b30, J.7-L/ b33
Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature (ºF): 58 50-90 Slump (in.): NA N/A Unit Wt (#cu ft): N/A
Air Temperature (ºF): 30 >40 Air Content (%): N/A N/A Time Sampled:
Aggregate Size (in): N/A N/A Batch Time: Time in Truck: <90 Mins <90 Mins
Information supplied by Laboratory Technician
Date Received: 01/28/2022 Technician that received: MN
Test #Age of
Test (Days)Date Technician
Dimensions (inch) X-section Total Load
(lbs)Strength (psi)Width Width Height Area (in²)
A 7 01/31/2022 Luis Soto Soldevilla 3.40 3.43 6.61 11.66 47,563 4,080 psi
B 28 02/21/2022
C 28 02/21/2022
D 28 02/21/2022
7 Day Avg.:4080
Remarks: Received Sample Condition: Acceptable and/or Satisfactory
TESTING
INSPECTION
ENGINEERING
Field Number: 6 Masonry Mortar Compression Test
Project Name: Dennis Yarmouth Middle School Permit # : BLD-21-006153
Project No.:5951 Sampled by: Arsene Ntwali Report Date: 01/31/2022
Client: PMA Consultants, LLC
Date of Sampling: 01/24/2022 Lab Log No.: 17921 (4001, 4021)
Reviewed by: Edmychael Colon, Lab
Manager
01/31/2022
Date
ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C1019, C31, C143, C231, C470, C511, C1077,
C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39.
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 1 of 1
Information provided by Field Technician
Mix #: Type S Supplier: Amerimix Contractor: Lighthouse
Set: 1 of 1 Truck #: N/A
Design Strength (psi): 1,800 @28
days Ticket#: N/A
Sample Material/Shape: ASTM C780 A7.6 Compressive Testing of Masonry
Mortar (2x2)Type of Structure: wall
Location: Onsite
Location for overall pour:
Location when sampled: Building B Gymnasium K/b33
Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature (ºF): 56 50-90 Slump (in.): N/A N/A Unit Wt (#cu ft): N/A
Air Temperature (ºF): 36 >40 Air Content (%): N/A N/A Time Sampled:
Aggregate Size (in): N/A N/A Batch Time: Time in Truck: <90 Mins <90 Mins
Information supplied by Laboratory Technician
Date Received: 02/01/2022 Technician that received: JK
Test #Age of
Test (Days)Date Technician
Dimensions (inch) X-section Total Load
(lbs)Strength (psi)Width Width Height Area (in²)
A 7 01/31/2022 Luis Soto Soldevilla 1.99 1.99 2.02 3.96 5,883 1,490 psi
B 7 01/31/2022 Luis Soto Soldevilla 1.99 1.98 2.02 3.94 6,352 1,610 psi
C 7 01/31/2022 Luis Soto Soldevilla 1.99 1.99 2.02 3.96 5,521 1,390 psi
D 28 02/21/2022
E 28 02/21/2022
F 28 02/21/2022
7 Day Avg.:1500
Remarks: Received Sample Condition: Acceptable and/or Satisfactory
TESTING
INSPECTION
ENGINEERING
Field Number: 4 Masonry Grout Compression Test
Project Name: Dennis Yarmouth Middle School Permit # : BLD-21-006153
Project No.:5951 Sampled by: Arsene Ntwali Report Date: 02/01/2022
Client: PMA Consultants, LLC
Date of Sampling: 12/07/2021 Lab Log No.: 17374 (3800)
Reviewed by: Edmychael Colon, Lab
Manager
02/01/2022
Date
ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C1019, C31, C143, C231, C470, C511, C1077,
C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39.
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 1 of 1
Information provided by Field Technician
Mix #: 3000 Supplier: Girard & Co. Contractor: Lighthouse Masonry, Inc.
Set: 1 of 1 Truck #: Design Strength (psi): 3,000 @28 days Ticket#:
Sample Material/Shape: ASTM C1019 Compressive Testing of Masonry Grout
(Grout Box)Type of Structure: Wall
Location: Onsite
Location for overall pour:
Location when sampled: Building C
Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature (ºF): 50-90 Slump (in.): N/A Unit Wt (#cu ft): N/A
Air Temperature (ºF): 45 >40 Air Content (%): N/A Time Sampled:
Aggregate Size (in): N/A Batch Time: Time in Truck: <90 Mins <90 Mins
Information supplied by Laboratory Technician
Date Received: 12/13/2021 Technician that received: MN
Test #Age of
Test (Days)Date Technician
Dimensions (inch) X-section Total Load
(lbs)Strength (psi)Width Width Height Area (in²)
A 7 12/14/2021 Luis Soto Soldevilla 3.42 3.45 6.91 11.80 14,164 1,200 psi
B 28 01/04/2022 Kevin Noel 3.42 3.45 6.73 11.80 21,290 1,800 psi
C 56 02/01/2022 Luis Soto Soldevilla 3.41 3.43 6.79 11.70 21,915 1,870 psi
D 90 03/07/2022
FAILS TO MEET DESIGN STRENGTH
56 Day Avg.:1870
Remarks: Internal voids. Low 7-Day indication compression test result.
TESTING
INSPECTION
ENGINEERING
Field Number: 20 Laboratory Compression Test (4x8)
Project Name: Dennis Yarmouth Middle School Permit # : BLD-21-006153
Project No.:5951 Sampled by: Arsene Ntwali Report Date: 02/01/2022
Client: PMA Consultants, LLC
Date of Sampling: 01/25/2022 Lab Log No.: 17891 (4002-4005)
Reviewed by: Edmychael Colon, Lab
Manager
02/01/2022
Date
ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077,
C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39.
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 1 of 4
Information provided by Field Technician
Mix #: 3000DNA Supplier: Cape Cod Mix Contractor: Silverback
Set: 1 of 4 Truck #: 56
Design Strength (psi): 3,000 @28
days Ticket#: 23070
Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical
Concrete Specimens (4x8)Type of Structure: Slab on Grade
Location: Onsite
Location for overall pour: Level 1 Slab on Grade at Building B
Location when sampled: K/b23
Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature (ºF): 64 50-90 Slump or Spread (in.): 7.75 5-9 Unit Wt (#cu ft): 148.8 148.17
Air Temperature (ºF): 38 >40 Air Content (%): 1.6 0-3 Time Sampled: 7:30 AM
Aggregate Size (in): 3/4 N/A Batch Time: 6:42 AM Time in Truck: 48 minutes <90 Mins
Information supplied by Laboratory Technician
Date Received: 01/27/2022 Technician that received: MN
Test #
Age of
Test
(Days)
Date Technician Diameter Length Area (in²) Cure Loc
Ultimate Load
(lbs)
Compressive
Strength (psi)
Type of
Fracture
A 7 02/01/2022 Luis Soto Soldevilla 4.00 8.00 12.57 Fld 33,725 2,680 psi Type 2
B 28 02/22/2022 4.00 8.00 12.57 Fld
C 28 02/22/2022 4.00 8.00 12.57 Fld
D 28 02/22/2022 4.00 8.00 12.57 Fld
E H H 4.00 8.00 12.57 Fld
7 Day Avg.:2,680 psi
Remarks: Received Sample Condition: Acceptable and/or Satisfactory
TESTING
INSPECTION
ENGINEERING
Field Number: 20 Laboratory Compression Test (4x8)
Project Name: Dennis Yarmouth Middle School Permit # : BLD-21-006153
Project No.:5951 Sampled by: Arsene Ntwali Report Date: 02/01/2022
Client: PMA Consultants, LLC
Date of Sampling: 01/25/2022 Lab Log No.: 17891 (4002-4005)
Reviewed by: Edmychael Colon, Lab
Manager
02/01/2022
Date
ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077,
C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39.
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 2 of 4
Information provided by Field Technician
Mix #: 3000DNA Supplier: Cape cod Ready Mix Contractor: Silverback
Set: 2 of 4 Truck #: 58
Design Strength (psi): 3,000 @28
days Ticket#: 23077
Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical
Concrete Specimens (4x8)Type of Structure: Slab on Grade
Location: Onsite
Location for overall pour: Level 1 Slab on Grade at Building B
Location when sampled: N/b21
Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature (ºF): 58 50-90 Slump or Spread (in.): 6.0 5-9 Unit Wt (#cu ft): 149.3 148.17
Air Temperature (ºF): 38 >40 Air Content (%): 1.2 0-3 Time Sampled: 9:00 AM
Aggregate Size (in): 3/4 N/A Batch Time: 8:34 AM Time in Truck: 26 minutes <90 Mins
Information supplied by Laboratory Technician
Date Received: 01/27/2022 Technician that received: MN
Test #
Age of
Test
(Days)
Date Technician Diameter Length Area (in²) Cure Loc
Ultimate Load
(lbs)
Compressive
Strength (psi)
Type of
Fracture
A 7 02/01/2022 Luis Soto Soldevilla 4.00 8.00 12.57 Fld 36,481 2,900 psi Type 2
B 28 02/22/2022 4.00 8.00 12.57 Fld
C 28 02/22/2022 4.00 8.00 12.57 Fld
D 28 02/22/2022 4.00 8.00 12.57 Fld
E H H 4.00 8.00 12.57 Fld
7 Day Avg.:2,900 psi
Remarks:
TESTING
INSPECTION
ENGINEERING
Field Number: 20 Laboratory Compression Test (4x8)
Project Name: Dennis Yarmouth Middle School Permit # : BLD-21-006153
Project No.:5951 Sampled by: Arsene Ntwali Report Date: 02/01/2022
Client: PMA Consultants, LLC
Date of Sampling: 01/25/2022 Lab Log No.: 17891 (4002-4005)
Reviewed by: Edmychael Colon, Lab
Manager
02/01/2022
Date
ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077,
C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39.
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 3 of 4
Information provided by Field Technician
Mix #: 3000DNA Supplier: Cape cod Ready Mix Contractor: Silverback
Set: 3 of 4 Truck #: 55
Design Strength (psi): 3,000 @28
days Ticket#: 23080
Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical
Concrete Specimens (4x8)Type of Structure: Slab on Grade
Location: Onsite
Location for overall pour: Level 1 Slab on Grade at Building B
Location when sampled: K/b18
Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature (ºF): 65 50-90 Slump or Spread (in.): 6.5 5-9 Unit Wt (#cu ft): 148.6 148.17
Air Temperature (ºF): 40 >40 Air Content (%): 1.4 0-3 Time Sampled: 10:14 AM
Aggregate Size (in): 3/4 N/A Batch Time: 9:37 AM Time in Truck: 37 minutes <90 Mins
Information supplied by Laboratory Technician
Date Received: 01/27/2022 Technician that received: MN
Test #
Age of
Test
(Days)
Date Technician Diameter Length Area (in²) Cure Loc
Ultimate Load
(lbs)
Compressive
Strength (psi)
Type of
Fracture
A 7 02/01/2022 Luis Soto Soldevilla 4.00 8.00 12.57 Fld 41,795 3,320 psi Type 2
B 28 02/22/2022 4.00 8.00 12.57 Fld
C 28 02/22/2022 4.00 8.00 12.57 Fld
D 28 02/22/2022 4.00 8.00 12.57 Fld
E H H 4.00 8.00 12.57 Fld
7 Day Avg.:3,320 psi
Remarks:
TESTING
INSPECTION
ENGINEERING
Field Number: 20 Laboratory Compression Test (4x8)
Project Name: Dennis Yarmouth Middle School Permit # : BLD-21-006153
Project No.:5951 Sampled by: Arsene Ntwali Report Date: 02/01/2022
Client: PMA Consultants, LLC
Date of Sampling: 01/25/2022 Lab Log No.: 17891 (4002-4005)
Reviewed by: Edmychael Colon, Lab
Manager
02/01/2022
Date
ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077,
C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39.
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 4 of 4
Information provided by Field Technician
Mix #: 3000DNA Supplier: Cape cod Ready Mix Contractor: Silverback
Set: 4 of 4 Truck #: 67
Design Strength (psi): 3,000 @28
days Ticket#: 33313
Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical
Concrete Specimens (4x8)Type of Structure: Slab on Grade
Location: Onsite
Location for overall pour: Level 1 Slab on Grade at Building B
Location when sampled: M.3/b17
Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature (ºF): 66 50-90 Slump or Spread (in.): 6.25 5-9 Unit Wt (#cu ft): 148.4 148.17
Air Temperature (ºF): 42 >40 Air Content (%): 1.7 0-3 Time Sampled: 11:30 AM
Aggregate Size (in): 3/4 N/A Batch Time: 10:26 AM Time in Truck: 64 minutes <90 Mins
Information supplied by Laboratory Technician
Date Received: 01/27/2022 Technician that received: MN
Test #
Age of
Test
(Days)
Date Technician Diameter Length Area (in²) Cure Loc
Ultimate Load
(lbs)
Compressive
Strength (psi)
Type of
Fracture
A 7 02/01/2022 Luis Soto Soldevilla 4.00 8.00 12.57 Fld 42,331 3,370 psi Type 2
B 28 02/22/2022 4.00 8.00 12.57 Fld
C 28 02/22/2022 4.00 8.00 12.57 Fld
D 28 02/22/2022 4.00 8.00 12.57 Fld
E H H 4.00 8.00 12.57 Fld
7 Day Avg.:3,370 psi
Remarks:
TESTING
INSPECTION
ENGINEERING
Field Number: 4 Masonry Grout Compression Test
Project Name: Dennis Yarmouth Middle School Permit # : BLD-21-006153
Project No.:5951 Sampled by: Arsene Ntwali Report Date: 02/02/2022
Client: PMA Consultants, LLC
Date of Sampling: 01/26/2022 Lab Log No.: 17966 (4029)
Reviewed by: Edmychael Colon, Lab
Manager
02/02/2022
Date
ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C1019, C31, C143, C231, C470, C511, C1077,
C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39.
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 1 of 1
Information provided by Field Technician
Mix #: Spec Mix Supplier: CCRM Contractor: Lighthouse
Set: 1 of 1 Truck #: N/A
Design Strength (psi): 3,000 @28
days Ticket#: N/A
Sample Material/Shape: ASTM C1019 Compressive Testing of Masonry Grout
(Grout Box)Type of Structure: wall
Location: Onsite
Location for overall pour: Building B Gymnasium J.7/B29
Location when sampled: Building B Gymnasium J.7/b28-b30, J.7-L/ b33
Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature (ºF): 56 50-90 Slump (in.): N/A N/A Unit Wt (#cu ft): N/A
Air Temperature (ºF): 38 >40 Air Content (%): N/A N/A Time Sampled:
Aggregate Size (in): N/A N/A Batch Time: Time in Truck: <90 Mins <90 Mins
Information supplied by Laboratory Technician
Date Received: 02/01/2022 Technician that received: MN
Test #Age of
Test (Days)Date Technician
Dimensions (inch) X-section Total Load
(lbs)Strength (psi)Width Width Height Area (in²)
A 7 02/02/2022 Max Nabulsi 3.48 3.51 6.05 12.22 39,513 3,230 psi
B 28 02/23/2022
C 28 02/23/2022
D 28 02/23/2022
7 Day Avg.:3230
Remarks: Received Sample Condition: Acceptable and/or Satisfactory
TESTING
INSPECTION
ENGINEERING
Field Number: 6 Masonry Mortar Compression Test
Project Name: Dennis Yarmouth Middle School Permit # : BLD-21-006153
Project No.:5951 Sampled by: Abdulwahab Abulgasem Report Date: 02/03/2022
Client: PMA Consultants, LLC
Date of Sampling: 01/06/2022 Lab Log No.: 17660
Reviewed by: Edmychael Colon, Lab
Manager
02/03/2022
Date
ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C1019, C31, C143, C231, C470, C511, C1077,
C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39.
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 1 of 1
Information provided by Field Technician
Mix #: Type S Supplier: Girard & Co. Contractor: Lighthouse Masonry, Inc.
Set: 1 of 1 Truck #: N/A
Design Strength (psi): 1,800 @28
days Ticket#: N/A
Sample Material/Shape: ASTM C780 A7.6 Compressive Testing of Masonry
Mortar (2x2)Type of Structure: Wall
Location: Onsite
Location for overall pour: L.6/B.33
Location when sampled: P.1-J.1/B.33
Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature (ºF): 53 50-90 Slump (in.): N/A N/A Unit Wt (#cu ft): N/A
Air Temperature (ºF): 42 >40 Air Content (%): N/A N/A Time Sampled: 8:00 AM
Aggregate Size (in): N/A N/A Batch Time: 7:30 AM Time in Truck:
30
minutes <90 Mins
Information supplied by Laboratory Technician
Date Received: 01/11/2022 Technician that received: MN
Test #Age of
Test (Days)Date Technician
Dimensions (inch) X-section Total Load
(lbs)Strength (psi)Width Width Height Area (in²)
A 7 01/13/2022 Luis Soto Soldevilla 1.99 1.99 2.00 3.96 6,973 1,760 psi
B 7 01/13/2022 Luis Soto Soldevilla 1.99 2.00 2.00 3.98 7,169 1,800 psi
C 7 01/13/2022 Luis Soto Soldevilla 1.99 2.00 2.00 3.98 6,922 1,740 psi
D 28 02/03/2022 Luis Soto Soldevilla 1.99 1.98 2.02 3.94 10,284 2,610 psi
E 28 02/03/2022 Luis Soto Soldevilla 1.98 1.97 1.99 3.90 10,846 2,780 psi
F 28 02/03/2022 Luis Soto Soldevilla 1.97 1.97 1.96 3.88 10,927 2,820 psi
MEETS DESIGN STRENGTH
28 Day Avg.:2740
Remarks: Received Sample Condition: Acceptable and/or Satisfactory
TESTING
INSPECTION
ENGINEERING
Field Number: 4 Masonry Grout Compression Test
Project Name: Dennis Yarmouth Middle School Permit # : BLD-21-006153
Project No.:5951 Sampled by: Arsene Ntwali Report Date: 02/04/2022
Client: PMA Consultants, LLC
Date of Sampling: 01/28/2022 Lab Log No.: 17967 (4026)
Reviewed by: Edmychael Colon, Lab
Manager
02/04/2022
Date
ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C1019, C31, C143, C231, C470, C511, C1077,
C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39.
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 1 of 1
Information provided by Field Technician
Mix #: Spec Mix Supplier: CCRM Contractor: Lighthouse
Set: 1 of 1 Truck #: N/A
Design Strength (psi): 3,000 @28
days Ticket#: N/A
Sample Material/Shape: ASTM C1019 Compressive Testing of Masonry Grout
(Grout Box)Type of Structure: wall
Location: Onsite
Location for overall pour:
Location when sampled: L.5-N.7/b33
Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature (ºF): 70 50-90 Slump (in.): NA N/A Unit Wt (#cu ft): N/A
Air Temperature (ºF): 36 >40 Air Content (%): N/A N/A Time Sampled: 8:20 AM
Aggregate Size (in): N/A N/A Batch Time: 7:39 AM Time in Truck:
41
minutes <90 Mins
Information supplied by Laboratory Technician
Date Received: 02/01/2022 Technician that received: MN
Test #Age of
Test (Days)Date Technician
Dimensions (inch) X-section Total Load
(lbs)Strength (psi)Width Width Height Area (in²)
A 7 02/04/2022 Getnet Beyene 3.39 3.39 6.63 11.49 17,633 1,530 psi
B 28 02/25/2022
C 28 02/25/2022
D 28 02/25/2022
7 Day Avg.:1530
Remarks: Received Sample Condition: Acceptable and/or Satisfactory
TESTING
INSPECTION
ENGINEERING
Field Number: 6 Masonry Mortar Compression Test
Project Name: Dennis Yarmouth Middle School Permit # : BLD-21-006153
Project No.:5951 Sampled by: Arsene Ntwali Report Date: 02/04/2022
Client: PMA Consultants, LLC
Date of Sampling: 01/28/2022 Lab Log No.: 17968 (4028)
Reviewed by: Edmychael Colon, Lab
Manager
02/04/2022
Date
ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C1019, C31, C143, C231, C470, C511, C1077,
C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39.
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 1 of 1
Information provided by Field Technician
Mix #: Supplier: Contractor:
Set: 1 of 1 Truck #: Design Strength (psi): 1,800 @28 days Ticket#:
Sample Material/Shape: ASTM C780 A7.6 Compressive Testing of Masonry
Mortar (2x4)Type of Structure: wall
Location: Onsite
Location for overall pour:
Location when sampled: J.7/b29-31
Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature (ºF): 58 50-90 Slump (in.): N/A Unit Wt (#cu ft): N/A
Air Temperature (ºF): 36 >40 Air Content (%): N/A Time Sampled:
Aggregate Size (in): N/A Batch Time: Time in Truck: <90 Mins <90 Mins
Information supplied by Laboratory Technician
Date Received: 02/01/2022 Technician that received: MN
Test #Age of
Test (Days)Date Technician
Dimensions (inch) X-section Total Load
(lbs)Strength (psi)Width Width Height Area (in²)
A 7 02/04/2022 Luis Soto Soldevilla 1.95 1.98 1.98 3.86 4,542 1,180 psi
B 7 02/04/2022 Luis Soto Soldevilla 1.98 1.98 1.95 3.92 3,802 970 psi
C 7 02/04/2022 Luis Soto Soldevilla 1.99 1.98 1.97 3.94 4,721 1,200 psi
D 28 02/25/2022
E 28 02/25/2022
F 28 02/25/2022
7 Day Avg.:1120