Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST /Acreage Location: A.M. 3 2- Lot ( b v Zone of Contribution: In Out 67.3 = Commercial: Residential: // Street: 3 43 u"4-.,--r-t, ,e.e.#.. 7- Village: -7-,-4 Floor Plan: ✓ #Bedrooms: 2- Owner: Owner: T1e-0 Installer: ,�- 1.70 item› --e..` Address: Phone: Phone: Builder: Engineer: s-€r-14 Address: Phone: Phone: N/A YES NO 1.Required#of copies received V 2.Date of soils exam and percolation test not older than 2 years ✓ 3.4-5 ft of naturally occurring pervious material,above water table ✓ 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: ✓ 5.Water line 10 ft from septic components Var.: 1/ 6.Benchmark indicated and shown-NGVD if near wetlands ,/ 7. Septic tank minimum 10 ft from foundation,deck Var.: / 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: ✓ 9.Leaching minimum 100 ft from wetlands Var.: ✓ 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: ✓ 11.Tank/leaching minimum 10 ft from property line Var.: ./ 12. System meets all other setback requirements Var.: ✓ 13.Uses adjustment for maximum high groundwater Var.: 0.5' ✓ 14.Leaching set 46itt above adj.water or bottom of test hole Var.` i/ 15. System not in top or subsoil(A,B horizons)or 5'removal *7- 16. 16.Proposed contours are suitable V 17. System meets slope requirements-min. 1/8", %"preferred / 18. System meets breakout requirements PVC liner: Wall: V 19. Specified tee sizes are proper, gas baffle on outlet tee V 20. Sewage is under 10,000 gpd for parcel s/ 21.No garbage disposal ✓ 22. System adequately sized for its intended use I' 23.Minimum 6"stone or compacted below tank and dbox / 24. Manhole covers within 6"of grade,pump chamber cover to grade / 25. Inspection port on plastic chambers/leach field / 26. Electrical permit for pump chamber/Separate meter for duplexes / ✓ 27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size ✓ 28. Septic tank/pump chamber to be factory waterproofed / 29. Vent provided if leaching below 3 feet,under driveway/parking V 30.Buoyancy calculations for tank/pump chamber ✓ 31. Engineer to inspect and certify soils: wall: commercial: i 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33.H-20 loading is subject to vehicular traffic,groundwater / 34.Title V Application and permit fee,installer signature ✓ 35.Foundation footing min. 2 feet above adjusted ground water for new house V 36.Deed Restriction required max. #bedrooms: max. flow: gpd 37. Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: /-4.A."15. 3(c.9 (zoz..'-z... 6 03 03