HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. /Z-4 Lot Zv Zone of Contribution: In Out )( Acreage 39, 24.415 F
Commercial: Residential: I/-
Street:
Street: V S S ,ems Co A
Village: Floor Plan: #Bedrooms: -5--
Owner: /-f-U 4 f+E-5 Installer: /Z.c-,41-3 c(
Address: Phone:
Phone:
Builder: Engineer: vC&-'`/'&.4--_
Address: Phone:
Phone:
N/A YES NO
1.Required#of copies received I/
2.Date of soils exam and percolation test not older than 2 years
3.4-5 ft of naturally occurring pervious material,above water table ,/
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: V
5.Water line 10 ft from septic components Var.: ,V
6.Benchmark indicated and shown-NGVD if near wetlands V
7. Septic tank minimum 10 ft from foundation,deck Var.: V
8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: ,/
9.Leaching minimum 100 ft from wetlands Var.: I
10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: ✓
11.Tank/leaching minimum 10 ft from property line Var.: ,/
12. System meets all other setback requirements Var.: ,/
13.Uses adjustment for maximum high groundwater Var.:
14.Leaching set 4-5 ft above adj. water or bottom of test hole Var.: ,/
15. System not in top or subsoil(A,B horizons)or 5' removal ,/
16.Proposed contours are suitable
17. System meets slope requirements-min. 1/8", %"preferred V
18. System meets breakout requirements PVC liner: Wall: /
19. Specified tee sizes are proper, gas baffle on outlet tee /
20. Sewage is under 10,000 gpd for parcel /
21.No garbage disposal ✓
22. System adequately sized for its intended use /
_ 23.Minimum 6"stone or compacted below tank and dbox V
24. Manhole covers within 6"of grade,pump chamber cover to grade V
25. Inspection port on plastic chambers/leach field /
26. Electrical permit for pump chamber/Separate meter for duplexes ,/
27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size ,/
28. Septic tank/pump chamber to be factory waterproofed V
29.Vent provided if leaching below 3 feet,under driveway/parking /
30.Buoyancy calculations for tank/pump chamber /
31. Engineer to inspect and certify soils: wall: commercial: /
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature /
33.H-20 loading is subject to vehicular traffic,groundwater
34.Title V Application and permit fee,installer signature
/
35. Foundation footing min. 2 feet above adjusted ground water for new house ,/
36.Deed Restriction required max. #bedrooms: max.flow: gpd /
37. Check area lots for groundwater/Label groundwater in Assessor's Map
PIan reviewed by: S i 4 (70Z1--
_ 6ozos