HomeMy WebLinkAboutCOC Request SE82-2137DATE: 03/10/2022
FROM: Ansley Druckenbrod
Town of Yarmouth
Conservation Commission
Method of Delivery: Deliver
c
140 Mayflower Terrace, South
Yarmouth (SE83-2137) _
Enclosed is the Certificate of Compliance Request for 140 Mayflower Terrace, South Yarmouth,
including:
• Yarmouth Certificate of Compliance Request Checklist
• WPA Form 8A
• Statement from Engineer
• Photograph
• Video (in digital file)
• As -built Plan, dated 3-9-22
• $75 filing fee
Cc: File
Please call/email should you have any questions
DOWN CAPE ENGINEERING, INC.
939 MAIN ST, SUITE C
YARMOUTHPORT, MA 02675
PHONE: 508-3624541 X100
FAX: 508-362-9880
E-MAIL: ansleyC@downcape.com
/
All filings must be made on Town of Yarmouth forms.
CONSERVATION
DIVISION
All applications must be submitted two weeks prior to the next scheduled Conservation
Commission meeting. Refer to Meeting Schedule.
Failure to follow the Administrative Checklist shall result in an Administrative Incomplete
Application and will not be scheduled for a Public Hearing.
Contact the Conservation Office if you need assistance.
S arc �i i �%caiicarc •
�/ 1 complete original application, plan/sketch, and other supporting information
to the Conservation Division - mailed to/dropped off at Town Hall.
y 1 complete pdf of application, plan/sketch, and other supporting information
emailed to kgrant(a)yarmouth.ma.us.
Statement from Enginee and/or stamped As -Built plan if required under the
Order of Conditions to be included with both original and pdf application.
Refer to 310 CMR 10.05(9)(d).
�Local filing fee. Refer to Fee Schedule. Make check payable to "Town of Yarmouth"
and include property address in memo.
All forms, Fee Schedule and Meeting schedule can be found at
https•//www yarmouth.ma.us/696/Filing-Forms.
Yarmouth Conservation Commission • 1146 Route 28 •South Yarmouth, MA 02664-4492
Tel. (508)-398-2231 Ext. 1288 •Fax (508)-398-0836 • TTD# (508) 398-2231 • k�rant(�yarmouth.ma.us
Rev 8/2021
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 8A — Request for Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Town of Yarmouth Wetland BV-law, Chapter 143
A. Project Information
DEP He Number:
SE83-2137
Provided by DEP
Important:
When filling out 1. This request is being made by:
forms on the Nicholas and Donna DiNinno
computer, use Name
only the tab 161 Old Tavern Road
key to move
your cursor - Mailing Address
do not use the Leominster MA 01453
return key. City/Town State Zip Code
4:1 Phone Number
2. This request is in reference to work regulated by a final Order of Conditions issued to:
Nicholas and Donna DiNinno
,Applicant
2/6/18 SE83-2137
Dated DEP File Number
Upon completion of the work 3. The project site is located at:
authorized in 140 Mayflower Terrace South Yarmouth
an Order of Street Address City/Town
Conditions, the 119 15
property owner
must request a Assessors Map/Plat Number Parcel/Lot Number
Certificate of 4. The final Order of Conditions was recorded at the Registry of Deeds for:
Compliance
from the issuing Nicholas and Donna DiNinno
authority stating Property Owner (if different)
that the work or Barnstable 31096 274
portion of the Book Page
work has been County
satisfactorily
completed. Certificate (if registered land)
5. This request is for certification that (check one):
® the work regulated by the above -referenced Order of Conditions has been satisfactorily completed.
❑ the following portions of the work regulated by the above -referenced Order of Conditions have
been satisfactorily completed (use additional paper if necessary).
❑ the above -referenced Order of Conditions has lapsed and is therefore no longer valid, and the
work regulated by it was never started.
wpaform8a.doc ••rev. 5/29/14 Page 1 of 2
Massachusetts Department of Environmental Protection DEP File Number:
Bureau of Resource Protection - Wetlands
WPA Form 8A — Request for Certificate of Compliance SE83-2137
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
Town of Yarmouth Wetland By-law, Chapter 143
A. Project Information (cont.)
6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain
an approval of any plans stamped by a registered professional engineer, architect, landscape
architect, or land surveyor?
® Yes If yes, attach a written statement by such a professional certifying substantial
compliance with the plans and describing what deviation, if any, exists from the plans
approved in the Order.
❑ No
B. Submittal Requirements
Requests for Certificates of Compliance should be directed to the issuing authority that issued the final
Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit
this request to that Commission. If the project was issued a Superseding Order of Conditions or was the
subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional
Office (see http://www mass gov/eea/agencies/massdep/about/contacts/find-the-massdep-regional-office-
for-you r-city-or-town. html).
wpaform8a.doc ••rev. 5/29/14 Page 2 of 2
939 main street rt 6a
yarmouth port
mass 02675
land court
surveys
structural design
site planning
sewage system
designs
inspections
permits
down cape engineering, inc
civil engineers & land surveyors
March 9, 2022
Yarmouth Conservation Commission
1146 Route 28
South Yarmouth, MA 02664
Re: Request for Certificate of Compliance
SE 83-2137 (140 Mayflower Terrace, So
Dear Commission Members:
Yarmouth)
tel. (508) 362-4541
fax(508)362-9880
Daniel A. Ojala, P.E., P.L.S.
Arne H. Ojala, P.E., P.L.S.
Daniel E. Gonsalves, P.E., S.E
Craig J. Ferrari, E.I.T., S.E.
On 2/6/18, the Commission issued an Order of Conditions for the
above -referenced site, for the construction of an elevated
walkway.
A site visit/inspection/as-built were made for the purpose of
closing out the Order of Conditions. Pictures and an as -built
Location plan are enclosed for review. The walkway is very
slightly angled from the originally proposed location. No storage
bench was constructed.
This is to certify, to the best of my knowledge and belief, that
the work was performed in substantial compliance with the approved
plan and Order of Conditions. We hereby request the issuance of a
Certificate of Compliance at this time.
Thank you for your consideration.
Very truly yours,
Daniel A. Ojala, PE, PLS
Down Cape Engineering, Inc.
cc: M/M DiNinno
encl.
— 3
t• 1 t `, 'r i s
y
•j:
*
—. 0 at
itL All
t
IL I
+y f
�Ya r r'
1
M1
fPit
i
Nor
tow—
t
... s:
Y+
- 40,
' - _ j
i.
I It
obam
Y
r
IV, If
ok, it
it
J V. " _ "r}
l
i 1/ it Ot
— to iZ
- E
1 '
li
Wool 4V
ol
Arr
LL
or
to
21,
4 Ito
to
It
It
7f
.—
�(.
.�
'r h ,t
41 to
li
Ilk Lit
it
or I
1 �r
I�� r ti
m:1
�f' _ M .