HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH ���X
SEWAGE PLAN REVIEW CHECKLIST /u` '3
J - G,77.-�'w9
Location: A.M. e7 Lot /7 Zone of Contribution: In r Out_ Acreage -74 SO --
Commercial: Residential:
Street: lef CE-e- ))7'"- /
Village: Floor Plan: t. #Bedrooms: 3
Owner: 4? (_ 7Installer: /-1/2
Address: Phone:
Phone:
Builder: Engineer: 77" .O
Address: Phone: / 570 P 3g5--`,Z1- S
Phone: p%6,��/jG�� 6-1r
N/A YES NO
1. Required#of copies received L/
2. Date of soils exam and percolation test not older than 2 years [/
3. 4-5 ft of naturally occurring pervious material, above water table t...-----
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: ,...-/-
5. Water line 10 ft from septic components Var.: ✓-
6. Benchmark indicated and shown-NGVD if near wetlands
7. Septic tank minimum 10 ft from foundation, deck Var.:
8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: C - �G
9. Leaching minimum 100 ft from wetlands Var.: ' jitfk(//02(/'
_
10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: ,
11. Tank/leaching minimum 10 ft from property line Var.:
12. System meets all other setback requirements Var.: dS`4
-.:::-_,),‘7---
13. Uses adjustment for maximum high groundwater Var.:
14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.:
15. System not in top or subsoil(A,B horizons)or 5' removal L...--"---
16. Proposed contours are suitable L/
17. System meets slope requirements-min. 1/8", 'A"preferred
18. System meets breakout requirements PVC liner: Wall: ✓
T 19. Specified tee sizes are proper, gas baffle on outlet tee k.-----°
20. Sewage is under 10,000 gpd for parcel
21.No garbage disposal
22. System adequately sized for its intended use (
23. Minimum 6"stone or compacted below tank and dbox t.------
24. Manhole covers within 6"of grade,pump chamber cover to grade k/
25. Inspection port on plastic chambers/leach field
26. Electrical permit for pump chamber/Separate meter for duplexes •-_------
27.
-_/27. Pump system-2" line,weep hole,check valve,tee in dbox,pump size C-R'
28. Septic tank/pump chamber to be factory waterproofed ,.-�
29. Vent provided if leaching below 3 feet,under driveway/parking ,...---'4
30. Buoyancy calculations for tank/pump chamber
31. Engineer to inspect and certify soils: wall: commercial:
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature � --
33. H-20 loading is subject to vehicular traffic, groundwater
34. Title V Application and permit fee, installer signature ��
35. Foundation footing min.2 feet above adjusted ground water for new house
36. Deed Restriction required max. #bedrooms: max. flow: gpd _
37.Check area lots for groundwater/Label groundwater in Assessor's Map
Plan reviewed by: 6/03/03