Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. 36 Lot Zone of Contribution: In Out X Acreage /0, / lo Commercial: Residential: Street: R 4 t 4 4 ( p S C A-ca. c-L Village: (A3 Floor Plan: ✓ #Bedrooms: 3 Owner: (...c>1)�L L-t"� L Installer: --TTC- Address: Phone: Phone: Builder: Engineer: ECC) Address: Phone: Phone: . N/A YES NO 1. Required#of copies received r/ 2. Date of soils exam and percolation test not older than 2 years 3. 4-5 ft of naturally occurring pervious material, above water table 4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: 5. Water line 10 ft from septic components Var.: V 6. Benchmark indicated and shown-NGVD if near wetlands .+f V 7. Septic tank minimum 10 ft from foundation, deck Var.: b 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 9. Leaching minimum 100 ft from wetlands Var.: 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: ✓ 11. Tank/leaching minimum 10 ft from property line Var.: ✓ 12. System meets all other setback requirements Var.: 13. Uses adjustment for maximum high groundwater Var.: V 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: ,/ 15. System not in top or subsoil (A,B horizons)or 5' removal 16. Proposed contours are suitable 17. System meets slope requirements-min. 1/8", '/"preferred - 18. System meets breakout requirements PVC liner: Wall: 19. Specified tee sizes are proper, gas baffle on outlet tee 20. Sewage is under 10,000 gpd for parcel ,// 21.No garbage disposal 22. System adequately sized for its intended use V 23. Minimum 6" stone or compacted below tank and dbox V 24. Manhole covers within 6" of grade,pump chamber cover to grade ,/ 25. Inspection port on plastic chambers/leach field r/ 26. Electrical permit for pump chamber/Separate meter for duplexes 27. Pump system-2"line,weep hole,check valve, tee in dbox,pump size ✓ 28. Septic tank/pump chamber to be factory waterproofed ✓ 29. Vent provided if leaching below 3 feet,under driveway/parking t/ 30. Buoyancy calculations for tank/pump chamber ✓ 31. Engineer to inspect and certify soils: wall: commercial: 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature ✓ 33. H-20 loading is subject to vehicular traffic, groundwater ✓ 34. Title V Application and permit fee, installer signature ✓ 35. Foundation footing min. 2 feet above adjusted ground water for new house e� 36. Deed Restriction required max. #bedrooms: max. flow: gpd r/ 37. Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: �'(''27P/ E 6 03 03