Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. 2 C> Lot 9 Zone of Contribution: In Out X Acreage /3 9 6G s Commercial: Residential: c----- street: /street: 2 3 C C_ o n- 67-- Village: TVillage: W E--r- Floor Plan: 17 #Bedrooms: 3 Owner: ""'"ha A___,..-,..._, Installer: #4 j 5 Address: Phone: Phone: Builder: 4 i S Engineer: b 5 'L Address: Phone: Phone: N/A YES NO 1.Required#of copies received ✓ 2.Date of soils exam and percolation test not older than 2 years / 3.4-5 ft of naturally occurring pervious material,above water table 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: V 5.Water line 10 ft from septic components Var.: I / 6.Benchmark indicated and shown-NGVD if near wetlands _ ,// 7. Septic tank minimum 10 ft from foundation,deck Var.: ✓/ 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 9.Leaching minimum 100 ft from wetlands Var.: ✓ 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: ✓ 11.Tank/leaching minimum 10 ft from property line Var.: 12. System meets all other setback requirements Var.: / 13.Uses adjustment for maximum high groundwater Var.: ✓ 14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.: / 15. System not in top or subsoil(A,B horizons)or 5'removal / 16.Proposed contours are suitable _ ✓ 17. System meets slope requirements-min. 1/8", '4"preferred 18. System meets breakout requirements PVC liner: Wall: 19. Specified tee sizes areproper, gas baffle on outlet tee / 20. Sewage is under 10,000 gpd for parcel ,/ 21.No garbage disposal ( ✓ 22. System adequately sized for its intended use / 23.Minimum 6"stone or compacted below tank and dbox ✓ 24. Manhole covers within 6"of grade,pump chamber cover to grade ✓ 25. Inspection port on plastic chambers/leach field / 26.Electrical permit for pump chamber/Separate meter for duplexes ✓ 27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size ✓ 28.Septic tank/pump chamber to be factory waterproofed ✓ 29.Vent provided if leaching below 3 feet,under driveway/parking i 30.Buoyancy calculations for tank/pump chamber 31.Engineer to inspect and certify soils: wall: commercial: 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature i 33.H-20 loading is subject to vehicular traffic, groundwater I 34.Title V Application and permit fee,installer signature / 35.Foundation footing min. 2 feet above adjusted ground water for new house / ,/36.Deed Restriction required max. #bedrooms: max. flow: gpd ✓ / 37. Check area lots for groundwater/Label groundwater in Assessor's Map �/ Plan reviewed by: 3(c ..( ao - 6 0:o: