HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. '- Lot 12- Zone of Contribution: In✓ Out_ Acreage C g(
Commercial: Residential: ,,/
Street: 11 Sri-rn-F'} po,Ls; P-4
Village: Floor Plan: V #Bedrooms:
Owner: 1JCn-L�)(IS Installer:
Address: Phone:
Phone:
Builder: Engineer:
Address: Phone:
Phone:
N/A YES NO
1. Required#of copies received ✓
2. Date of soils exam and percolation test not older than 2 years
3. 4-5 ft of naturally occurring pervious material, above water table ✓
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: ✓
5. Water line 10 ft from septic components Var.:
6.Benchmark indicated and shown-NGVD if near wetlands ✓
7. Septic tank minimum 10 ft from foundation, deck Var.: / ✓
8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: ✓
9. Leaching minimum 100 ft from wetlands Var.:
10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: /
11. Tank/leaching minimum 10 ft from property line Var.:
12. System meets all other setback requirements Var.: ✓
13.Uses adjustment for maximum high groundwater Var.:
14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.:
15. System not in top or subsoil(A,B horizons)or 5' removal ✓
16. Proposed contours are suitable
17. System meets slope requirements-min. 1/8", '/"preferred
18. System meets breakout requirements PVC liner: Wall:
19. Specified tee sizes are proper,gas baffle on outlet tee
20. Sewage is under 10,000 gpd for parcel
21. No garbage disposal
22. System adequately sized for its intended use ✓
23. Minimum 6"stone or compacted below tank and dbox
24. Manhole covers within 6" of grade,pump chamber cover to grade ✓
25. Inspection port on plastic chambers/leach field ,/
26. Electrical permit for pump chamber/Separate meter for duplexes ✓
27. Pump system-2"line,weep hole,check valve,tee in dbox,pump size ✓
28. Septic tank/pump chamber to be factory waterproofed ✓
29. Vent provided if leaching below 3 feet,under driveway/parking /
30. Buoyancy calculations for tank/pump chamber
31. Engineer to inspect and certify soils: wall: commercial:
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature V I
33. H-20 loading is subject to vehicular traffic, groundwater V I
34. Title V Application and permit fee, installer signature
35. Foundation footing min. 2 feet above adjusted ground water for new house ✓
36. Deed Restriction required max. #bedrooms: max. flow: gpd ✓
37. Check area lots for groundwater/Label groundwater in Assessor's Map
Plan reviewed by: 6 03 03