HomeMy WebLinkAboutCOC requestDATE: 03/22/2022
FROM: Ansley Druckenbrod
Town of Yarmouth
Conservation Commission
Method of Delivery: Deliver
12 Powers Lane, West
Yarmouth
Enclosed is a Certificate of Compliance Request filing for 12 Powers Lane, West Yarmouth,
including:
• Town of Yarmouth COC Request Checklist
• WPA Form 8A
• Statement from Engineer, Daniel A. Ojala, PE, PLS
• Photos of Site
• $75 Filing Fee
Cc: File
Please call/email should you have any questions
DOWN CAPE ENGINEERING, INC.
939 MAIN ST, SUITE C
YARMOUTHPORT, MA 02675
PHONE: 508-3624541 X100
FAX: 508-362-9880
E-MAIL: ansley@downcape.com
CONSERVATION
DIVISION
/ / r
i
All filings must be made on Town of Yarmouth forms.
All applications must be submitted two weeks prior to the next scheduled Conservation
Commission meeting. Refer to Meeting Schedule.
Failure to follow the Administrative Checklist shall result in an Administrative Incomplete
Application and will not be scheduled for a Public Hearing.
Contact the Conservation Office if you need assistance.
1 complete original application, plan/sketch, and other supporting information
to the Conservation Division - mailed to/dropped off at Town Hall.
✓ 1 complete pdf of application, plan/sketch, and other supporting information
emailed to kgrant6i varmouth.ma.us.
Statement from Engineer and/or stamped As -Built plan if required under the
9 p
Order of Conditions to be included with both original and pdf application.
Refer to 310 CMR 10.05(9)(d).
`' Local filing fee. Refer to Fee Schedule. Make check payable to "Town of Yarmouth"
and include property address in memo.
All forms, Fee Schedule and Meeting schedule can be found at
https://www.yarmouth.ma.us/696/Filing-Forms.
Yarmouth Conservation Commission • 1146 Route 28 •South Yarmouth, MA 02664-4492
Tel. (508)-398-2231 Ext. 1288 •Fax (508)-398-0836 • TTD# (508) 398-2231 • kUrant c�yarmouth.ma.tts
Rev 8/2021
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 8A — Request for Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Town of Yarmouth Wetland Bvdaw, Chapter 143
A. Project Information
Important: 1
When filling out
forms on the
computer, use
only the tab
key to move
your cursor -
do not use the
return key.
tab
rerun 2
Upon completion
of the work
authorized in
an Order of
Conditions, the
property owner
must request a
Certificate of
Compliance
from the issuing
authority stating
that the work or
portion of the
work has been
satisfactorily
completed.
This request is being made by:
Charles Salerno
Name
12 Powers Lane
Mailing Address
West Yarmouth
City/Town
Phone Number
MA
State
This request is in reference to work regulated by a final Order of Conditions issued to:
Thomas Powers
Applicant
April 2, 1997
Dated
3. The project site is located at:
12 Powers Lane
Street Address
14
Assessors Map/Plat Number
SE83-1398
DEP File Number
West Yarmouth
City/Town
75
Parcel/Lot Number
4. The final Order of Conditions was recorded at the Registry of Deeds for:
Charles and Carol Salerno
DEP He Number:
SE83-1398
Provided by DEP
02673
Zip Code
Property Owner (if different)
Barnstable
County Book Page
125233 Doc#691,258
Certificate (if registered land)
5. This request is for certification that (check one):
® the work regulated by the above -referenced Order of Conditions has been satisfactorily completed.
❑ the following portions of the work regulated by the above -referenced Order of Conditions have
been satisfactorily completed (use additional paper if necessary).
❑ the above -referenced Order of Conditions has lapsed and is therefore no longer valid, and the
work regulated by it was never started.
wpaformSa.doc •• rev. 5/29/14 Page 1 of 2
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 8A — Request for Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Town of Yarmouth Wetland By-law, Chapter 143
A. Project Information (cont.)
DEP He Number:
SE83-1398
Provided by DEP
6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain
an approval of any plans stamped by a registered professional engineer, architect, landscape
architect, or land surveyor?
® Yes If yes, attach a written statement by such a professional certifying substantial
compliance with the plans and describing what deviation, if any, exists from the plans
approved in the Order.
❑ No
B. Submittal Requirements
Requests for Certificates of Compliance should be directed to the issuing authority that issued the final
Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit
this request to that Commission. If the project was issued a Superseding Order of Conditions or was the
subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional
Office (see http://www mass.gov/eea/agencies/massde1)/about/contacts/find-the-massdeg-regional-office-
for-you r-city-or-town. html).
wpaform8a.doc •• rev. 5/29/14 Page 2 of 2
939 main street rt 6a
yarmouth port
mass 02675
land court
surveys
structural design
site planning
sewage system
designs
inspections
permits
down cape engineering, inc
civil engineers & land surveyors
March 15, 2022
Yarmouth Conservation Commission
1146 Route 28
South Yarmouth, MA 02664
Ref: 12 Powers Lane, West Yarmouth
Dear Commission Members:
tel. (508) 362-4541
fax (508) 362-9880
Daniel A. Ojala, P.E., P.L.S.
Arne H. Ojala, P.E., P.L.S.
Daniel E. Gonsalves, P.E., S.E
Craig J. Ferrari, E.I.T., S.E.
On April 2, 1997, the Commission issued an Order of Conditions
for the above -referenced site, for the razing of an existing
dwelling and construction of a new dwelling.
A site visit was made in March of 2022. The following deviations
from the record plan and Order of Conditions are as follows:
• The house
with the
and small
front of
foundation complies with the plan of record,
exception of an added bulkhead. A rinse station
egress deck/steps were added to the rear and
th
e dwelling
Brick walk
• ways were
dwelling; a circular
added to rear, side and front of the
10' diameter brick patio was added.
• The driveway was constructed of pervious pavers
With the exception of the listed deviations and to the best of
my knowledge and belief, the project was completed in
substantial compliance with the approved plan and Order of
Conditions. Photos are enclosed for reference.
We hereby request the issuance of a Certificate of Compliance.
Thank you for your consideration.
Very truly yours,
F�� \
Daniel A. Ojala, PE, PLS
Down Cape Engineering, Inc.
cc: C. Salerno
encl.