Loading...
HomeMy WebLinkAboutE-mail Correspondence Page 1 of 1 vonHone, Amy From: vonHone, Amy Sent: Monday, June 24, 2013 10:13 AM To: 'eas.survey@yahoo.com' Subject: China Inn plan revisions Attachments: D00001.PDF; D00002.PDF Ed- Bruce and I have reviewed the revised plan and have the following comments/revisions prior to approving the plan: Label Benchmark on the plan view d'kL 2. Label System 2 d-box replacement as H-20 capacity o--t,-3. Provide a larger observation port within the leach field for potential pumping and inspection of the system. Other options may by an 18"wide precast riser set into the stone with a cast iron cover to grade. Provide a detail on the plan. 0. 4. The design calcs. listed for System 1: remove the statement"2500 gallon provided (existing tank)..." under the Required First Septic Tank section Add "Install New 5040 gallon 2-compartment Septic Tank" 1)'x-5. Provide an additional summary of the flow of the entire site to clarify how much flow is required for the site and how the flow is separated into the two systems. I have attached a pdf of a suggested summary. A plan with notes is available in the office for your review if needed. I will need 3 revised copies for the installation permit. Thanks, Amy Amy L.von Hone, R.S., C.H.O. Assistant Health Director Yarmouth Health Department 1146 Route 28 South Yarmouth, MA 02664 (0) 508-398-2231 X1241 (F) 508-760-3472 avonhone@yarmouth.ma.us 6/24/2013