Loading...
HomeMy WebLinkAboutPlan rev 2 Final _ 3-19-22EX. DOCK DEP LICENSE #10325 (2016) OBS. LOW WATERLINE JUNE 7, 2020 MLW=-1.8' BEACH RSH% \ \ \ OA �o MARsN \ _ REPLACE C S 7z�p (SEE NO NG 1 P OPOSED CO-, L1F15 ORQSE erswee - AND PLANTINGS OCK LAYE RCPO ER ROLLS TAI E 5 �_E_TA TED Ai SHED LAWN00 o � - x LS ` 0 SHELL ��, � 1 PATH y o / / � cuss • `� STONE ELEC. WELL WALK � HOUSEN �F MAP 29 PARCEL 86 y METER HVAC O TOMAIOLO PHYLLIS M 40 PRINCE RD GAS W. YARMOUTH, MA 02673 TER v \ n CERT #120596 DOC #507035 i \ #40 LS PLANTING LIST S82`46'08"E 88.74'(TIE-LINE) RVEYED LOCATION . RIP -RAP DPW ZUSE14380 (1960 '- -MAP 29 PARCEL 87 � ILIP J. PEARS AND SHEILA TUCKE 44 PRINCE RD W. YARMOUTH, MA. 02673 RT 224630 C #1,413,682 #44 1►1 W E S S52'40'33"E 62.34'(TIE-LINE) LAWN \ SHE L PAVER PATH DRIVE PAVER OD �\ DRIVEILL RESIDENCE ZONE R-25 LOT AREA (REQ'D) 25,000 S.F. FRONTAGE (REQM 150' FRONT YARD (REQ'D) 30' SIDE YARD (REQ'D) 15' REAR YARD (,REQM 20' FILL IN BARE SPOTS AND REPLANT TO REVIVE EX. VEGETATED BUFFER ABOVE REVETMENT EX. KIN-KAF' DPW LICENSE# 4380 (1960) (From Google Earth) �CUP 64- 5 Common Name BOTANICAL NAME QUANTITY( HEIGHT WIDTH POT SIZE SPACING COVERAGE (SQ.FT)L Veaetated Buffer (75t s.q. ft.)_ ST. JOHN'S WORT Hypericum Densiflorum 1 4' 4' 1-GALLON 3' 9 ROSA CAROLINA Rosa Carolina 2 3' 3' 1G 4' 32 (PASTURE ROSE) SWAMP AZALEA Rhododendron Viscosum 1 5' 5' 3'-4' 4'-5' 16 BUTTERFLY MILKWEED Asciepias Tuberosa 2 V-2.5' V-1.5 2" POT 3' 18 Bank Slope planting (140 Sq. ft.) American Beach Grass Ammophila Breviligulata 20 1.5-3.5' 6-10" 3 culms ea. 12" 20 Sand (Purple) Love Grass Eragrostis Trichodes 20 1'-2' 1'-2' Plug/Seed 2' 80 Spike Grass Distichlis Spicata 15 8"-15" 1'-2' 2" plug 12" 15 NOTE: QUANTITIES SHOWN HERE ARE APPROXIMATE AND CAN BE ADJUSTED AS LONG AS THE TOTAL SQUARE FOOT COVERAGE EQUALS 115t SQUARE FEET. OTHER PLANT SPECIES CAN BE SUBSTITUTED WITH CONSERVATION APPROVAL. LSCSF Coastal Coastal Beach Bank 10 Maintain Existing "STABILIZED SACRIFICIAL AREAS" 10 Vegetated Buffer ABOVE THE STONE 8 2 = 6 6C _ 4 2 PROPOSED "HYBIRD" SOFT FXISTING GRADE 2 0 j SOLUTION (SEE NOTE 1 0 2 AND DETAIL) -2 -4 -6 O -8 I -8 II Ocfl Ins O 00 CD o � o H: 1"=10' SECTION A -A (EXISTING AND PROPOSED 5 0 5 10 20 SCALE: 1 "=10' SITE PLAN (EXISTING) 10 5 0 10 20 40 SCALE: 1 "=20' CONSTRUCTION NOTES: Soil Key 1000 gram coir matting in 1' lifts (typ) MEAN HIGH WATER (1.1') MEAN LOW WATER (-1.8') -- 2--- ELEVATION CONTOUR PROPERTY LINE LIMIT OF WORK/ACCESS 2' oak stakes (typ) TRM matting i lantings (typ) 1 One Rowof ,OZ3' 0 stone; (bury half of Loamy sand filler ,stone) 20" fiber roll (t Duckbill Anchors, DB-68--- or equal; embed 5' into undisturbed soil; wooden stakes can be used as an option HYBRID SOFT SOLUTION DETAIL 2.5 0 2.5 5 10 SCALE: 1 "=5' t�A OF 6, urQ�' EaWtN GL.E S JR. CP IONAL' SURVEY NOTES: w Q w x VAND m \ \/N \ w E 2 r n S \\\\ l a � L OCUS CREEK KEY MAP 1. RECORD OWNERS 1 " = 800't PHILIP J. PEARS AND SHEILA TUCKE 100 CHAMBERLAIN ROAD WESTFORD, MA 01866 DEED DOCUMENT #: 1,413,682 LC CERTIFICATE # 224630 LCP 21898-B LOT 3 C� 'QO YARMOUTH, MA. 2. PROPERTY IS SHOWN AS PARCEL 87 ON ASSESSORS MAP 29 AND APPEARS TO LIE WITHIN THE RESIDENCE (R-25) ZONING DISTRICT PER THE TOWN OF YARMOUTH ZONING MAP AND AVAILABLE ASSESSORS INFORMATION. 3. PROPERTY LINES SHOWN ARE COMPILED FROM AN ON THE GROUND SURVEY CONDUCTED BY EXISTING GRADE, INC ON JULY 8, 2020, LINES OF OCCUPATION, AND FOUND MONUMENTATION. 4. PARCEL APPEARS TO LIE PARTIALLY WITHIN THE FLOOD ZONE AE (EL=11) AND ZONE AE (EL=13) PER FIRM MAP 25027CO569J PANEL 569 OF 875, LAST REVISED JULY 16, 2014, AS SHOWN ON THE FEMA WEBSITE. 5. EXISTING CONDITIONS SHOWN HEREON WERE COMPILED FROM AN ON THE GROUND SURVEY CONDUCTED ON JULY 8, 2020 BY EXISTING GRADE, INC. AND FROM AERIAL IMAGERY PROVIDED BY THE STATE OF MASSACHUSETTS. 6. ORIGIN OF BEARINGS IS MASSACHUSETTS STATE PLANE (NAD83), DETERMINED FROM A GPS SURVEY CONDUCTED BY EXISTING GRADE, INC. ON JULY 8, 2020, ROTATED 16.023' COUNTERCLOCKWISE FROM LAND COURT PLAN 21898-B, RECORDED AT THE BARNSTABLE COUNTY REGISTRY OF DEEDS. 7. ORIGIN OF ELEVATIONS IS NAVD 88, DETERMINED FROM A GPS SURVEY CONDUCTED BY EXISTING GRADE, INC. ON JULY 8, 2020. 8. SURVEYOR HAS MADE NO INVESTIGATION OR INDEPENDENT SEARCH FOR EASEMENTS OF RECORD, ENCUMBRANCES, RESTRICTIVE COVEN ANTS,OWNERSHIP TITLE EVIDENCE, OR ANY OTHER FACTS THAT AN ACCURATE AND CURRENT TITLE SEARCH MAY DISCLOSE. 9. THE PROPOSED WORK DOES NOT APPEAR TO LIE WITHIN A NHESP BOUNDARY PER MASS GIS AND THEREFORE MAY NOT BE SUBJECT TO MESA REVIEW 1. PLANT ELEVATIONS REFER TO NAVD88. CONTACT SHOREFRONT CONSULTING FOR ADDITIONAL ELEVATION INFORMATION AS NEEDED. 2. SCOPE OF WORK CONSISTS OF EXTENDING THE EXISTING SHOREFRONT PROTECTION ALONG THE SHOREFRONT WITH A HYBRID SOFT SOLUTION TO BLEND INTO THE ADJACENT REVETMENT. THE SINGLE ROW OF ROCKS SHALL BE BURIED HALF WAY INTO THE SOIL, ONLY EXPOSING 1.5 FEET OF ROCK. 3. CONSTRUCTION ACCESS SHALL BE FROM THE APPLICANT'S PROPERTY. EQUIPMENT SHALL BE STORED ON THE APPLICANT'S PROPERTY WHEN NOT IN USE. 4. THE WORK ACTIVITY SHALL OCCUPY A MINIMUM AREA TO ACCOMPLISH THE INSTALLATION OF THE SCOUR APRON. EQUIPMENT AND MATERIALS HANDLING SHALL BE IN ACCORDANCE WITH THE WORK PROTOCOL SUBMITTED WITH THE NOTICE OF INTENT, THE RESULTING ORDER OF CONDITIONS AND AS DIRECTED BY THE YARMOUTH CONSERVATION AUTHORITIES. 5. ALL WORK SHALL BE ACCOMPLISHED FROM THE UPLAND. THE NEW ROCK INSTALLATION MAY BE ACCOMPLISHED WITH A SMALL EXCAVATOR ON THE LANDWARD SIDE OF THE TOP OF BANK OR ON THE COASTAL BEACH ABOVE THE HIGH TIDE LINE. 6. ALL AREAS DISTURBED DURING CONSTRUCTION SHALL BE RETURNED TO THEIR PRE -CONSTRUCTION CONDITION. ALL WORK SHALL BE INSPECTED BY SHOREFRONT CONSULTING AND RECEIVE APPROVAL BEFORE REMOVING EQUIPMENT FROM THE SITE. 7. THE ACCESS ROUTE AND WORK SITE SHALL BE CLEANED AND RESTORED TO RESEMBLE THE PRE -CONSTRUCTION CONTOURS AND CONDITIONS. 8. THE CONTRACTOR SHALL OBTAIN A COPY OF THE ORDER OF CONDITIONS ISSUED FOR THE PROJECT BY THE YARMOUTH CONSERVATION COMMISSION PRIOR TO THE START OF ANY WORK. 9. ANY OTHER DEVIATION FROM THE DESIGN PLAN SHALL BE BROUGHT TO THE ATTENTION OF SHOREFRONT CONSULTING FOR APPROVAL BEFORE PROCEEDING FURTHER. 10. A 5-FOOT WIDE VEGETATED BUFFER SHALL BE MAINTAINED BEHIND THE SCOUR APRON. PLANTS SELECTED SHALL BE FROM THE CAPE COD COOPERATIVE EXTENSION LIST AND APPROVED BY THE CONSERVATION AGENT PRIOR TO CONSTRUCTION. SUBSTITUTION OF SPECIES IS ALLOWED WITH CONSERVATION APPROVAL. 11. THE EXISTING WOODEN STEPS SHALL BE REPLACED WITH EITHER TIMBER OR ALUMINUM. NO PART OF THIS DRAWING MAY BE USED BY ANY PARTY WITHOUT THE EXPRESS WRITTEN CONSENT OF SHOREFRONT CONSULTING AND EXISTING GRADE, INC. r 2 3/19/22 Add Planting list to plan:iLUjLjL MCB 1 2/28/22 Change from rocks to hybrid soft solution MCB NO. DATE REVISION --� BY SHEET TITLE PLAN SHOWING PROPOSED SHOREFRONT PROTECTION PROJECT N0. SC-120 SCALE AS SHOWN DATE 9/24/21 PROJECT PHILIP J. PEARS & SHEILA TUCKS 44 PRINCE ROAD WEST YARMOUTH, MA DRAWN Y MCB CHECKEDBY EG DRAWING NO. 40-44 PRINCE.DWG EXISTING GRADE, INC. 62 RIEDELL ROAD DOUGLAS, MA 01516 (508) 694-6501 SHOREFRONT CONSULTING 290 CENTER STREET DENNIS PORT, MA. 02639 (508) 280-8046 WWW.SHOREFRONTCONSULTING.COM C I OF 1 SHEETS