Loading...
HomeMy WebLinkAboutCorrespondence Haas, Steve From: Haas, Steve Sent: Tuesday, November 30, 2021 3:16 PM To: 'PETER MCENTEE' Subject: RE: 32 Shore Rd Yarmouth Hi Pete, The plan looks good. Could you add the water lines in both Vermont Ave and Shore Road along with the line to the cottage? Also add notes that the SAS is to be staked prior to construction, the system is to be inspected and certified by both the design engineer and Geo-flow, and that an O&M is required for both the Fast and Geo-flow. I think that should do it. Thanks, Stephen Haas Yarmouth Health Dept. By the way, Anna did a great job in the interview. I'm trying to get Bruce to call her sooner than later! From: PETER MCENTEE [mailto:peter.mcentee@gmail.com] Sent: Friday, November 26, 2021 2:19 PM To: Haas, Steve <SHaas@yarmouth.ma.us>; sahaas@comcast.net Subject: 32 Shore Rd Yarmouth Attention! This email originates outside of the organization. Do not open attachments or click links unless you are sure this email is from a known sender and you know the content is safe. Call the sender to verify if unsure. Otherwise delete this email. Steve, Attached is the data logging information and the revised plan. Sheets 3 &4 did not change. THe plan revisions are noted in the lower left corner of sheet 1. Please let me know if this satisfies your concerns and, if so, I will send hard copies. Thanks - Peter Peter T. McEntee PE - Principal Engineering Works, Inc. 12 West Crossfield Road Forestdale, MA 02644 Tel/fax (508) 477-5313 i