Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. ( C Lot "l k Zone of Contribution: In Out )( Acreage 23.LI q i Commercial: Residential: t/ Street: ,C P a '-'' 57-. Village: So io'r-7-1 Floor Plan: `...- -- #Bedrooms: Owner: 5T 7-0---o S Installer: SQt#..-, .+.r-' Address: Phone: Phone: Builder: Engineer: gtr s' ' r4'(- Address: Phone: Phone: N/A YES/ NO 1.Required#of copies received V 2.Date of soils exam and percolation test not older than 2 years / 3.4-5 ft of naturally occurring pervious material,above water table ,/ 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: ./- 5. 5.Water line 10 ft from septic components Var.: / 6.Benchmark indicated and shown-NGVD if near wetlands V 7. Septic tank minimum 10 ft from foundation,deck Var.: VI 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: / 9.Leaching minimum 100 ft from wetlands Var.: ✓ 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: V/ 11.Tank/leaching minimum 10 ft from property line Var.: / 12. System meets all other setback requirements Var.: V 13.Uses adjustment for maximum high groundwater Var.: N7 14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.: / 15. System not in top or subsoil(A,B horizons)or 5'removal 16.Proposed contours are suitable ✓ 17. System meets slope requirements-min. 1/8", 'A"preferred 18. System meets breakout requirements PVC liner: Wall: ( f 19. Specified tee sizes are proper, gas baffle on outlet tee ,/ 20. Sewage is under 10,000 gpd for parcel / 21.No garbage disposal 1 / 22. System adequately sized for its intended use 23.Minimum 6"stone or compacted below tank and dbox / 24. Manhole covers within 6"of grade,pump chamber cover to grade f 25. Inspection port on plastic chambers/leach field / -1- 26. 26. Electrical permit for pump chamber/Separate meter for duplexes / 27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size ✓ 28. Septic tank/pun p chamber to be factory waterproofed 1 29. Vent provided if leaching below 3 feet,under driveway/parking / 30.Buoyancy calculations for tank/pump chamber V 31. Engineer to inspect and certify soils: wall: commercial: V 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33.H-20 loading is subject to vehicular traffic,groundwater I 34.Title V Application and permit fee,installer signature V 35.Foundation footing min.2 feet above adjusted ground water for new house / 36.Deed Restriction required max. #bedrooms: max. flow: gpd V 37.Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by:_ 54i-k. , 3('24 'Lo ZS- 6 03 03