HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
'ID SEWAGE PLAN REVIEW CHECKLIST
33
Location: A.M. --96.-- Lot Zone of Contribution: In Out ✓ Acreage o-VS A
Commercial: Residential: v
Street: /3 c ,vo 1.4 1-419-7 .c' Sr
Village: 5c v i)-1 Floor Plan: #Bedrooms: 4
Owner: Et-T.)xi .44..._7 Installer: L' t--/ //=e,"---/-"D
Address:
----
Address: Phone:
Phone:
Builder: Engineer: v`,4-
Address: Phone:
Phone:
N/A YES/ NO
1.Required#of copies received ,/ /
2.Date of soils exam and percolation test not older than 2 years
3.4-5 ft of naturally occurring pervious material,above water table
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: ,/
5.Water line 10 ft from septic components Var.: ix)x,ft 5110...,u i.----
6.
6.Benchmark indicated and shown-NGVD if near wetlands /
7. Septic tank minimum 10 ft from foundation,deck Var.: /
8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: /
9.Leaching minimum 100 ft from wetlands Var.: /
10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: /
11.Tank/leaching minimum 10 ft from property line Var.: V
12. System meets all other setback requirements Var.: ti..4.-7 v Ar47
13.Uses adjustment for maximum high groundwater Var.: / /
14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.: ✓
15. System not in top or subsoil(A,B horizons)or 5'removal
16.Proposed contours are suitable /
17. System meets slope requirements-min. 1/8", '4"preferred V
18. System meets breakout requirements 51 cam*-- PVC liner: Wall: ✓
19. Specified tee sizes are proper, gas baffle on outlet tee ✓
20. Sewage is under 10,000 gpd for parcel ✓
21.No garbage disposal ,/
22. System adequately sized for its intended use ,/
23.Minimum 6"stone or compacted below tank and dbox ✓
24. Manhole covers within 6"of grade,pump chamber cover to grade ,/
25. Inspection port on plastic chambers/leach field ,/
26. Electrical permit for pump chamber/Separate meter for duplexes ✓
27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size ,/
28. Septic tank/pump chamber to be factory waterproofed /
29.Vent provided if leaching below 3 feet,under driveway/parking ./
30.Buoyancy calculations for tank/pump chamber
31.Engineer to inspect and certify soils: wall: commercial: T
32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature x/
33.H-20 loading is subject to vehicular traffic, groundwater
34.Title V Application and permit fee,installer signature ../
35.Foundation footing min.2 feet above adjusted ground water for new house
36.Deed Restriction required max. #bedrooms: max. flow: gpd
37.Check area lots for groundwater/Label groundwater in Assessor's Map
Plan reviewed by: "e-72:› 6 03 03