Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. -(6, Lot 25 Zone of Contribution: In Out_ Acreage 3 7'13 2 *' 5•F Commercial: Residential: r.- Street: 20 5 14-i 4 4 t L.,S e,Lo-...s c_cL Village: w s i Floor Plan: #Bedrooms: ' Owner: Fc.--ii-v L c Installer: 56. o--(-0 ,L. )-T-r-t Address: Phone: Phone: Builder: Engineer: -DerA..ru - " Address: Phone: Phone: N/A YES/ NO 1.Required#of copies received �/ 2.Date of soils exam and percolation test not older than 2 years 3.4-5 ft of naturally occurring pervious material,above water table 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: 5.Water line 10 ft from septic components Var.: / 6.Benchmark indicated and shown-NGVD if near wetlands L// 7. Septic tank minimum 10 ft from foundation, deck Var.: ,/ 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: V 9.Leaching minimum 100 ft from wetlands Var.: / 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: ✓ / 11.Tank/leaching minimum 10 ft from property line Var.: �✓ 12. System meets all other setback requirements Var.: 13. Uses adjustment for maximum high groundwater Var.: ✓ 14. Leaching set 4-5 ft above adj.water or bottom of test hole Var.: /I ✓ 15. System not in top or subsoil(A,B horizons)or 5' removal 16.Proposed contours are suitable ✓ 17. System meets slope requirements-min. 1/8", 'A"preferred 18. System meets breakout requirements PVC liner: Wall: 19. Specified tee sizes are proper,gas baffle on outlet tee i/ 20. Sewage is under 10,000 gpd for parcel / 21.No garbage disposal ✓ 22. System adequately sized for its intended use / 23.Minimum 6"stone or compacted below tank and dbox ✓ 24. Manhole covers within 6"of grade,pump chamber cover to grade 25. Inspection port on plastic chambers/leach field 26.Electrical permit for pump chamber/Separate meter for duplexes f 27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size 28. Septic tank/pump chamber to be factory waterproofed - 29.Vent provided if leaching below 3 feet,under driveway/parking 30.Buoyancy calculations for tank/pump chamber 1 r 31.Engineer to inspect and certify soils: wall: commercial: 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature j 33.H-20 loading is subject to vehicular traffic,groundwater ,/ 34.Title V Application and permit fee,installer signature 35.Foundation footing min.2 feet above adjusted ground water for new house 36.Deed Restriction required max. #bedrooms: max. flow: gpd ✓ _ 37.Check area lots for groundwater/Label groundwater in As essor's Map Plan reviewed b . d -+�4 • c �t / Z�� Y' �l a o;o;