No preview available
HomeMy WebLinkAboutEngineer PlanASSESSORS MAP: fZ5 PARCEL: 5aj FLOOD ZONE: NOp11���� REFERENCE: NIA LOCAT ION MAP CN•T,�,, Y/,117 r �oVA O' — a } FjE 4 25' 1 It �iSSQG EX�STj �I`/ TEST HOLE LOGS SOIL EVALUATOR:'.- P•S• CGI WITNESS:R•yoay� k(L__ DATE: Mfl- 24 PERCOLATION RATE : 2O 'n No({ G�A�S S" So IL Cn�-2L oL(o Q' TH- I FL, 58,b TH-2 tf"A m r S"ID IOC /, J8, l3 g 5 �� loYtts/g 33" ro.os fl Q W h-kse 2,7 C `y D NOTES: 1) THE INSTALLATION MUST BE IN SUBSTANTIAL COMPLIANCE WITH ,"('HIS PLAN, 1995 MASSACHUSETTS TITLE V & TOWN OF 1y (LM� BOARD OF HEALTH REGULATIONS. 2) THE INSTALLER SHALL VERIFY THE LOCATION OF UTILITIES, SEWER INVERTS AND SEPTIC COMPONENTS PRIOR TO INSTALLATION. 3) THIS PLAN SHALL BE USED FOR SEPTIC SYSTEM INSTALLATION ONLY, AND SHALL NOT BE USED FOR PROPERTY LINE DETERMINATION: 4) ALL PIPING TO BE 4" SCHEDULE 40 @ 118 "/ FOOT. (UNLESS SPECIFIED OTHERWISE) 5) THE DESIGN OF THIS SYSTEM DOES NOT ALLOW FOR THE USE OF A GARBAGE DISPOSAL. 6) SEPTIC TANKS AND DISTRIBUTION BOXES (WHEN INSTALLED) MUST BE PLACED ON A MECHANICALLY COMPACTED BASE OR ON A BASE OF 6" OF CRUSHED STONE. 132,, c{�. � 7) ; n /v' -)c/5 NO (�w Ob5rc-LUEU tin t? �? SEPTIC SYSTEM DESIGN __._.� 9. �t��.ar�1n. _w�rN lso_'. QF rr?�Q�°��0.. _l���t'c.nl� • � I FLOW ESTIMATE (b;l/✓��O�VEC21�i�i�GT D_.Tow1J _fly._ 3 BEDROOMS AT 00 GAL/DAY/BEDROOM -�J?� GAL/RAY SEPTIC TANK 3�DGA'-/DAY x 2 DAYS (0(D GAL I USE j, S X? GALLON SEPT I C TANK SO'L AB>ORPTION SYSTEM SIDE AREA: ly7- x o,��f /12 -Ys BOTTOM AREA: 2y' ,� (3 ` 0 7�/ Z?q 2,Sz.,78 Gia SrPT I C SYSTEM SECTION TB ` TO rrL'• 0 . � (fI5`avM�D� lb` /¢" �''6�t7h/Sl, �rode�� Al 5? .556 �aS Of/e�=7 -=2" ,�,ie (va5hed 5 k eEt 7S 3a _ S%.6 rb (a,,5tpne6aSa GAL D -BOX S✓o.33 Sra ,5 0 SEPTIC TANK ✓ 1/la$ke'd S ee 7a Y, 13, ---- ort . F TesT--+ o lideL SITE AND SEWAGE PLAN LOCATION >=IZRKJC,ES 1-)r✓cE><l W'�A PREPARED FOR: DARFtEN M. MEYER, R.S. SCALE:DATE: Z6 0 43 VINE STREET DUXBURY NEA 02332 DATE 7z<; HEALTH AGENT (781) 585-0293 Do AAAV n a onnA .' I - r 1 . 1 604 UPJ lLc