Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH mA.f J Jc /l 7 SEWAGE PLAN REVIEW CHECKLIST Location: A.M. I I5 Lot 491 Zone of Contribution: Ing// Out4k1 Acreage Commercial: Residential: 1„../ Street: f q S Ki ID )er- La N e- / Village: Floor Plan: ✓ #Bedrooms: 3 Owner: 4A,e /7 SKipper .1 +►v� --ri-u ± Installer: Ail()r7"JegST C0ivsin,c. ioxi Address: Phone: 5o s $96 - 771.3 Phone: Builder: Engineer: !-► • rn_. 10ei// Address: Phone: 5' �8 (, - ,�6 O / Phone: N/A YES NO 1. Required#of copies received V� 2. Date of soils exam and percolation test not older than 2 years 3.4-5 ft of naturally occurring pervious material,above water table Y 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: V 5.Water line 10 ft from septic components Var.: re.-routed N<< e_ ✓ 6.Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation,deck Var.: V 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: V 9.Leaching minimum 100 ft from wetlands Var.: 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: ,,/ 11.Tank/leaching minimum 10 ft from property line Var.: • V, 12. System meets all other setback requirements Var.: ✓ 13.Uses adjustment for maximum high groundwater Var.: 14. Leaching set 4-5 ft above adj.water or bottom of test hole Var.: 15. System not in top or subsoil(A,B horizons)or 5' removal 1 7 16.Proposed contours are suitable 17. System meets slope requirements-min. 1/8", 'A"preferred 7 18. System meets breakout requirements PVC liner: Wall: 19. Specified tee sizes are proper, gas baffle on outlet tee V/ 20. Sewage is under 10,000 gpd for parcel if 21.No garbage disposal _ 11 22. System adequately sized for its intended use V 23.Minimum 6"stone or compacted below tank and dbox ,�,- 24.Manhole covers within 6"of grade,pump chamber cover to grade 25.Inspection port on plastic chambers/leach field 26.Electrical permit for pump chamber/Separate meter for duplexes t/ 27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size ✓ 28. Septic tank/pump chamber to be factory waterproofed .7 29. Vent provided if leaching below 3 feet,under driveway/parking Mill 30.Buoyancy calculations for tank/pump chamber 31.Engineer to inspect and certify soils: wall: commercial: 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33.H-20 loading is subject to vehicular traffic,groundwater 34.Title V Application and permit fee,installer signature 35.Foundation footing min. 2 feet above adjusted ground water for new house �/ 36.Deed Restriction required max. #bedrooms: max. flow: d ✓ 37. Check area lots for groundwater/Label groundwater in Assessor's Map PIan reviewed b -4► 6 01 07