Loading...
HomeMy WebLinkAboutEngineer PlanGENERAL NOTES: A.) NEITHER DRIVEWAYS NOR PARKING AREAS ARE ALLOWED OVER SEPTIC SYSTEM UNLESS H-20 COMPONENTS ARE USED. B.)THE DESIGNER WILL NOT BE RESPONSIBLE FOR THE SYSTEM AS DESIGNED UN- LESS CONSTRUCTED ASSHOWN, ANY CHANGES SHALL BE APPROVED IN WRITING. C.) CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION OF ALL UNDERGROUNDAND OVERHEAD UTILITIES PRIOR TO COMMENCEMENT OF WORK. CONSTRUCTION NOTES: 1.) ALL CONSTRUCTION SHALL CONFORM TO THE STATE ENVIRONMENTAL CODE, TITLE 5, AND THE REQUIREMENTS OF THE LOCAL BOARD OF HEALTH. I 2.) SEPTIC TANK(S), GREASE TRAP(S), DOSING CHAMBER(S) AND DISTRIBUTION .J BOX(ES) SHALL BE SET ON A LEVEL STABLE BASE WHICH HAS BEEN MECHANICALLY COMPACTED, OR ON A 61NCH CRUSHED STONE BASE. 3.) SEPTICTANK(S) SHALL MEET ASTM STANDARD C1127-93 AND SHALL HAVE AT LEASTTHREE DIAMETER MANHOLES. THE MINIMUM DEPTH FROM THE 80T - TOM C THE SEPTANK TO THE FLOW LINE SHALL BE 48". 4.) SCHEDULE 40 PVC INLET AND OUTLET TEES SHALL EXTEND A MINIMUM OF 6" ABOVE THE FLOW LINE OF THE SEPTIC TANK AND SHALL BE INSTALLED ON THE CENTERLINE OF THE TANK DIRECTLY UNDER THE CLEANOUT MANHOLE. 5.) RAISE COVERS OF THE SEPTIC TANK AND DISTRIBUTION BOX WITH PRECAST CONCRETE WATERTIGHT RISERS OVER INLET AND OUTLET TEES TO WITHIN 6" OF FINISH GRADE, ORAS APPROVED BY THE LOCAL BOARD OF HEALTH AGENT. 6.) PIPING SHALL CONSIST OF 4" SCHEDULE 40 PVC OR EQUIVALENT. PIPE SHALL BE LAID ON A MINIMUM CONTINUOUS GRADE OF NOT LESS THAN 1%. 7.) DISTRIBUTION LINES FOR SOIL ABSORPTION SYSTEM (AS REQUIRED) SHALL BE 4" DIAMETER SCHEDULE 40 PVC LAID AT 0.005 FT/FT LINE SHALL BE CAPPED ATEND OR AS NOTED. 8.) OUTLET PIPES FROM DISTRIBUTION BOX SHALL REMAIN LEVEL FOR AT LEAST 2' BEFORE PITCHING TO SOIL ABSORPTION SYSTEM. WATER TEST DISTRIBUTION BOXTO ASSURE EVEN DISTRIBUTION. 9.) DISTRIBUTION BOX SHALL HAVE A MINIMUM SUMP OF 6" MEASURED BELOW THE OUTLET INVERT. 10.) BASE AGGREGATE FOR THE LEACHING FACILITY SHALL CONSIST OF 3/4" TO 1-1/2" DOUBLE WASHED STONE FREE OF IRON, FINES AND DUST AND SHALL BE INSTALLED BELOW THE CROWN OF THE DISTRIBUTION LINE TO THE BOTTOM OF THE SOILABSORPTION SYSTEM. BASE AGGREGATE SHALL BE COVERED WITH A 21, LAYER OF 1/8" TO 1/2" DOUBLE WASHED STONE FREE OF IRON, FINES AND DUST. 11.) VENT SOIL ABSORPTION SYSTEM WHEN DISTRIBUTION LINES EXCEED 50 FEET,. WHEN LOCATED EITHER IN WHOLE OR IN PART UNDER DRIVEWAYS, PARKING AREAS, TURNING AREAS OR OTHER IMPERVIOUS MATERIAL; OR WHEN PRESSURE DOSED. 12.) SOILABSORPTION SYSTEM SHALL BE COVERED WITH A MINIMUM OF 9" OF CLEAN MEDIUM SAND (EXCLUDING TOPSOIL). 13.) FINISH GRADE SHALL BE A MAXIMUM OF 36" OVER THE TOP OF ALL SYSTEM COMPONENTS, INCLUDING THE SEPTIC TANK, DISTRIBUTION BOX, DOSING CHAMBER AND SOIL ABSORPTION SYSTEM. SEPTIC TANKS SHALL HAVE A MINIMUM COVER OF 9". 14). FROM THE DATE OF INSTALLATION OF THE SOIL ABSORPTION SYSTEM UNTIL RECEIPT OF A CERTIFICATE OF COMPLIANCE, THE PERIMETER OF THE SOIL ABSORP- TION SYSTEM SHALL BE STAKED AND FLAGGED TO PREVENT THE USE OF SUCH AREA FOR ALLACTIVITIES THAT MIGHT DAMAGE THE SYSTEM. 15.) SUBSURFACE COMPONENTS OFA SYSTEM SHALL NOT BE BACKFILLED OR OTHERWISE CONCEALED FROM VIEW UNTIL A FINAL INSPECTION HAS BEEN CONDUCTED BY THE APPROVING AUTHORITY AN D PERMISSION HAS BEEN GRANTED BY THE APPROVING AUTHORITY TO BACKFILL THE SYSTEM. THE DESIGNER SHALL INSPECT THE CONSTRUCTION AFTER THE INITIAL EXCAVATION, PRIOR TO BACKFILLING, AND DURING BACKFILLING. IN ADDITION, THE FINAL INSPECTION OF THE SYSTEM SHALL BE CONDUCTED BYTHE APPROVING AUTHORITY, THE SYSTEM INSTALLER AND DESIGNER PRIOR TO THE ISSUANCE OF A CERTIFICATE OF COMPLIANCE PURSUANT TO 310 CMR 15.021(3). ANY COMPONENT OF THE SYSTEM WHICH HAS BEEN COVERED WITHOUT SUCH PERMISSION SHALL BE UNCOVERED UPON REQUEST OF THE APPROVING AUTHORITY OR THE DEPARTMENT. 16.) SOIL REMOVAL: IF THE TOPSOIL(HORIZON'A'), FINE LOAMY SAND IS ENCOUNTERED BELOW THE TOP OF 4" PERFORATED DITRIBUTION LINE (EL= 40.6±), BOTH FILL & TOPSOIL'A' SHALL BE REMOVED FOR A DISTANCE OF 5' FROM THE PROPOSED SOIL ABSORPTION SYSTEM (SAS) DOWN TO THE FINE LOAMY SAND LAYER,'B' FOUND IN TEST HOLE #1. DISTURBED AREAS ARE TO BE BACKFILLED WITH CLEAN TITLE V. SAND AND COMPACTED TO MINIMIZE SETTLEMENT. IF SOIL REMOVAL, IS REQUIRED THE DRIVEWAY SHALL BE SAW CUT, AND THEN REPAIREDTO ITS PRE -CONSTRUCTION CONDITION FOLLOWING SAS INSTALLATION. 17.) RE -PLUMBING OF REAR WASTELINE: THE REAR BATHROOM SHALL BE RE -PLUMBED WITHIN THE DWELLING AND CONNECTED TO THE FRONT SEWER EXIT LINE, IN ACCORDANCE WITH THE MASSACHUSETTS STATE PLUMBING CODE. THE EXISTING REAR EXIT UNE SHALL BE CAPPED AT THE HOUSE. 18.) INSTALLER TO CONFIRM LOCATION OF ALL UNDERGROUND AND OVERHEAD UTILITIES PRIOR TO START OF CONSTRUCTION. 19.) THE EXISTING WATER LINE SHALL BE CUT, AND RE-ROUTED AS SHOWN ON THE PLAN VIEW. ALL NEW SECTIONS OF WATER LINE WITHIN l0' OF ANY SEWAGE DISPOSAL SYSTEM COMPONENTS, SHALL BE SLEEVED WITHIN SCH. 40 PVC PIPE. 20.)THE EXISTING CESSPOOLS SHALL BE LOCATED, PUMPED DRY, AND THEN EITHER REMOVED OR ABANDONED IN PLACE, IN ACCORDANCE WITH TITLE V REGULATIONS. 21.) ENGINEER SHALLVERIFY SOILS FOR A DEPTH OF 4' BENEATH THE FINE LOAMY SAND LAYER,'B' FOUND IN TEST HOLE #1, PRIOR TO INSTALLATION OF ANY SEPTIC SYSTEM COMPONENTS, SOI L TEST LOGS: TEST HOLE 1: EL=41.8± SOIL COLOR (MUNSELL) SOIL OTHER MOTTLING 0-11 FILL FLOW PROFILE: NOT TO SCALE TOP OF FOUNDATION EL = 44.8± 0 m A TOTAL OF THREE (3): (2) ST, (1) DB 21" DIAMETER CONCRETE COVERS 1 RAISEDTO W_,I.T_H_I_N__6 OF�FINII .. GRAD (OR AS NOTED) (SEE NOTE #5) r PROPOSED EL=44.1±(MIN.) / 311 4'0" rGAS 13' PROPOSED 1,500 GALLON 17 DB -3 � CONCRETE SEPTIC TANK D -BOX NOTE: FH -26] Y EXISTING PLUMBING CONNECTED TO THE REAR BUILDING SEWER LINE REQUIRES RE-ROUTING WITHIN THE DWELLING, AND SHALL BE CONNECTED TO THE FRONT BUILDING SEWER LINE IN ACCORDANCE WITH MASSACHUSETTS PLUMBING CODE. (SEE NOTE #17) SAS DETAIL SCALE: 1"=10' 4" SCH. 40 PVC LAID @ 0.005 FT/FT 5' - - _ - 21.5' - - - - N in ^I OBSERV. PORT .n D -BOX STONE ONE --------- N 21.5' 'r OBSERVATION PORT PROPOSED SAS THREE (3) 22.4'x 2.5'x 2' - LEACHING TRENCHES ONE (1) 6" PVC INSPECTION PORT AND CAP WITHIN 3" OF FINISH GRADE WITH SECTION OF #5 REBAR PROP. HIGH SIDE EL= 43.5± EL=43.5± PROP. LOW SIDE EL= 42.9+ 28"- 36" Proposed (9" Min- 36" Max) FILTER OR ENGINEER APPROVED EQUIV. 40.28 24" MAXt�3 40.17 40.38. - /4"- 1-1/2" STONE 2' DROP 38.17 4" DIA SCH 40"PERF' PVC PIPE, PIT ES 38.17 AT 0.005 FT/FT (MIN) LEACHING TRENCHES 21.5'x 2.5'x 2.0' 8.4'± LONGEST RUN T-22'- L EL = 29.8± BOTTOM OF TPI NO GROUNDWATER ENCOUNTERED BASEMENT FLOOR PLAN NOT TO SCALE NO BASEMENT (GARAGE SLAB) -[ UNFINISHED BASEMENT & STORAGE AREA FIRST FLOOR PLAN NOT TO SCALE BATH LIVING ROOM BED ROOM ROOM KITCHEN 1-CARGARAGE CONVERTEDTO HALL ALL LIVING ROOM CLOSET CLOSET DINING BED ROOMggTH BED ROOM AREA - _ t ROOM DEPTH FROM SURFACE (INCHES) SOIL HORIZON SOIL TEXTURE (USDA) SOIL COLOR (MUNSELL) SOIL OTHER MOTTLING 0-11 FILL -G- GAS SERVICE LINE 11-15 FINE LOAMY SAND 10YR51 NONE 15-56 8- FINE LOAMY SAND 10YR58. NONE PERC 56"RAT<4MININ 56- 144 Cl ME6 UM SAND lOYR 5 6 NONE LOOSE NO G.W. E D DATE OF TESTING: 1/27/2022 PERCOLATION RATE: LESS THAN 4 MIN/INCH IN BOTH'B'' &'C1' LAYERS. WITNESSED BY: MATTHEW J. WROBEL, EIT, J.M. O'REILLY & ASSOCIATES, INC. PHILLIP RENAUD, HEALTH AGENT, YARMOUTH HEALTH DEPARTMENT NO WATER ENCOUNTERED USE A LOADING RATE OF 0.74 GPD SF FOR SIZING OF SOILABSORPTION SYSTEM. SECOND TEST HOLE WAVED BY THE HEALTH AGENT Approximate -Location of ® x Existing Cesspool System 44.1 TO BE REMOVED (SEE NOTE#20) SYSTEM DESIGN CALCULATIONS: SEWAGE DESIGN FLOWI BE R M D EUUNG @ 110 GPD 330 GPD LEACHING CAPACITY REQUIREDI BEDROOMSPO=330 GPD REQUIRED SEPTIC TANK CAPACITY REQUIREM DAILY O = PD 00%= 330 GAL. REQUIRED SEPTIC TANK CAPACITY PROVIDEM TSM -GALLON PT TANK MI .ALLOWED) LEACHING CAPACITY PROVIDEDi a� Vt=([(21.5X2.5)+((21.5X2)2)+(25X2)2)]HX 0.741 X 3ES CAN =332.45 332 GPD> 330 GPD REQUIRED -+NOTE: A GARBAGE DISPOSAL IS NOT PERMITTED WITH THIS DESIGN. INSTAL i NE - 1,500 GALLON CONCRETE SEPTIC TANK ONE (1)- 3 OUTLET DISTRIBUTION BOX (H-20 RATED) THREE (3)- 21.5' X 2.5'X 2.0' LEACHING TRENCHES WITH SCH. 40 PVC PIPE LAID @ 0.005 FT/FT 42.6 17 (40,W10HE�1 �NC R 6 a ofp »o PR/VATE w' l Paved Pave nt ) riveway n`\ - _ 420 0.4 v x 43.2 1p .00, \ ry 220" Oak ' x 42.3 -- 44. B X 43.9 ,.,...ST i o _ YARMOUTH PORT, MA G2 P SKIPpE\IANE /AN�, \ C<1. � \\v n 00 Y NOT TO SCALE 0 0 DEED BOOK 29262 PAGE 268 z PLAN BOOK 187 PAGE 149 CL ASSESSORS' MAP 115 PARCEL 197 LEGEND F32-1 EXISTING CONTOUR 32 PROPOSED CONTOUR x12.34 EXISTING SPOT GRADE 44.6 a to I TPl 43.4 e41.8 Existing 3 Bedroom Dwelling I TOE EL = 44.8± �(I O� OS 44 G^ 428 Paver ~ Patio I X 41.4 LOT 51 ae.9. rea= 10,000 SF± X 42.8 O 41.4 � g<1cK o' O 00, pyr 42 x 41.9 423 X 41.0 PROPOSED RE-ROUTE WATER SERVICE LINE (SEE NOTES #19) Existing Building Sewer TO BE RE -PLUMBED (SEE NOTE #17) Approximate Location of / Existing Cesspool System TO BE ABANDONED (SEE NOTE #20) 0 20 40 60 SCALE 1"=20' G:\AAJobs\Northeast Construction\9245- 19 Skipper Ln Yarmouthport\dwg\9245.PROPOSED SDS PLAN.dwg Yarmouth Health Department 1 APPROVED. RECEIVED MAR 2 2 2022 HEALTH DE°'1, THE 19 SKIPPER LANE TRUST OF 2003 C/O NORTHEAST CONSTRUCTION, P.O. BOX 2350, BREWSTER, MA 02631 SITE & SEWAGE DISPOSAL SYSTEM DESIGN 19 SKIPPER LANE, YARMOUTH PORT, MA 02675 J.M. OTEILLY & ASSOCIATES, INC. Professional Engineering & Land Surveying Services 1573 Main Street - Route BA P.O. Boa 1773 (508)896-6601 Office Brewster, MA 02631 (508)898-6602 Fax ATE: SCALE BY: CHECK: FJJOBNUM2BER: 3/15/2022 As Noted MJW JMO 5 24x5 PROPOSED SPOT GRADE -G- GAS SERVICE LINE rvey Nail -W- WATER SERVICE LINE AVD1988 Datum) -OH- OVERHEAD UTILITY SERVICE FBENCHMARKi TEST HOLE/ BORING LOCATION \ ST SEPTICTANK DB DISTRIBUTION BOX SAS SOIL ABSORPTION SYSTEM CP CESSPOOL rob UTILITY POLE ■ CONCRETE BOUND, FOUND STOCKADE FENCE EDGE OF CLEARING 40.1 NOTE: Gravel THE PROPERTY IS LOCATED WITHIN THE TOWN OF YARMOUTH'S )riveway�. �.-_---__..._. AQUIFER PROTECTION 43VERLAY DISTRICT (ZONE II).- - 44.6 a to I TPl 43.4 e41.8 Existing 3 Bedroom Dwelling I TOE EL = 44.8± �(I O� OS 44 G^ 428 Paver ~ Patio I X 41.4 LOT 51 ae.9. rea= 10,000 SF± X 42.8 O 41.4 � g<1cK o' O 00, pyr 42 x 41.9 423 X 41.0 PROPOSED RE-ROUTE WATER SERVICE LINE (SEE NOTES #19) Existing Building Sewer TO BE RE -PLUMBED (SEE NOTE #17) Approximate Location of / Existing Cesspool System TO BE ABANDONED (SEE NOTE #20) 0 20 40 60 SCALE 1"=20' G:\AAJobs\Northeast Construction\9245- 19 Skipper Ln Yarmouthport\dwg\9245.PROPOSED SDS PLAN.dwg Yarmouth Health Department 1 APPROVED. RECEIVED MAR 2 2 2022 HEALTH DE°'1, THE 19 SKIPPER LANE TRUST OF 2003 C/O NORTHEAST CONSTRUCTION, P.O. BOX 2350, BREWSTER, MA 02631 SITE & SEWAGE DISPOSAL SYSTEM DESIGN 19 SKIPPER LANE, YARMOUTH PORT, MA 02675 J.M. OTEILLY & ASSOCIATES, INC. Professional Engineering & Land Surveying Services 1573 Main Street - Route BA P.O. Boa 1773 (508)896-6601 Office Brewster, MA 02631 (508)898-6602 Fax ATE: SCALE BY: CHECK: FJJOBNUM2BER: 3/15/2022 As Noted MJW JMO 5