Loading...
HomeMy WebLinkAboutEngineer PlanWF#4 Q 0 0 a QJl� WF#3 LOT 58 a 14150 S.F.X 44 \/ v 010 /44. 44. ^h 40.5 i 46 42. WF#2 EXISTING 44.1 s -r wa L s DWELLNG i 3''0 — �`C,ND ��o D @J T`KAI O \. SURVEY BY: WELLER AND ASSOC. WETLAND FLAGGING BY: BRAD HALL i 46� 48 TBM = EL. 50.0 TOP OF CONC. BND. 9 LEACHING ATCH BASIN (no discharge) 61 PROP. LEACHING' (see specs pg 2.) 50 \J� P�� LEGEND WEST YARMOUTH }—� PROPOSED CONTOUR SUFFOLK AVE. 98 PROPOSED SPOT GRADE --gg -- EXISTING CONTOUR LOCUS 8 McNAMARA + 96.52 EXISTING SPOT GRADE INICOLE = HALFWAY POND —W— EXISTING WATER SERVICE L TEST PIT AVE,SCALE: 1" = 20' / Permit valid for REPAIR OF SEPTIC SVST ONLY, due to State and Local septic variaa Board of Health review and approval is required any future additionstrenovations/alterations sewage facilities and/or structures/dwelling. Yarmouth Health Department APPROVED 50 PROP. 1,50OG SEPTIC TANK 5 FT. SOIL REMOVAL (NOTE 16) LOCUS MAP LOCUS INFORMATION 7 PLAN REF: 258/004 3/y Za2Z TITLE REF: 6741/0052 -'--! Daft - PARCEL ID: MAP 076 PAR. 234 FLOOD ZONE: NOT IN FLOOD ZONE PROPERTY IN ZONE II - - SEPTIC SYSTEM i REPAIR PLAN MAR 14 2022 LOCATED AT: 8 MCNAMARA AVENUE WEST YARMOUTH, MA PREPARED FOR KEVIN HOLLAND JANUARYA3a,I7p22 REV: MARCH 8, 2022 I VARIANCE REQUESTS — MAXIMUM FEASIBLE COMPLIANCE I 1) A 8 Fr. VARMNCE FROM 310 CMR 15.211/YARMOUTH REGS TO ALLOW PROP. LEACHING TO BE A MIN. OF 12 FT. FROM DWELLING VS. REQUIRED 20 Fr. 2) A 0.5 FT. VARIANCE FROM 310 CMR 15.221(7)/YARMOUrH BEGS TO ALLOW PROP. LEACHING TO BE 3.5 FT. BELOW GRADE VS. REWIRED 3 Ff. (H-20 PROW 3) A 20.7 FT. (UP TO) VARIANCE FROM 310 CMR 15.211/YARMOUi BEGS TO ALLOW PROP. LEACHING A TO BE A MIN. 78.3 Fr. FROM WETLAND VS REQUIRED 100 ST8V8N W.9cyN ��R��H NASJ RUMBA 1 o DARREN M. No. _$79 ti MEYER: PFcI$��ato 11.2-1-1 "`. MEYER & SONS INC. P.O. Box 981 E. SANDWICH, MA 02537 PH. (508)360-3311 fax (774)413-9468 meyerandsonstitle5®gmail.com SHEET 1 OF 2 TOP OF FND. EL.= 48.50 48.0 INV. 45.50 INV. 45. NOTE: PLACE MAGNETIC MARKING TAPE OVER ALL COVERS BRING ALL COVERS TO WITHIN 3" OF FINISH GRADE F.G.EL: 48.50 F.G. EL: 48.50 TEE'S ARE TO BE 11 INV. 45.00/1" 11N 4" SCH 40 PVC INV: 45.05 V GAS PROPOSED DB -3 BAFFLE 7-717�N . DISTRIBUTION BOX (H20) PROP. 1,500 GALLON SEPTIC TANK GAS BAFFLE TO BE INSTALLED ON OUTLET TEE AS MANUFACTURED BY TUF-TITE, ZABEL, OR EQUAL NOTES: 1) CONTRACTOR SHALL VERIFY ALL EXISTING PIPE INVERTS PRIOR TO CONSTRUCTION 2) TANK/D-BOX SHALL BE SET LEVEL AND TRUE TO GRADE ON A MECHANICALLY COMPACTED SIX INCH CRUSHED STONE BASE, AS SPECIFIED IN 310 CMR 15.221(2) 3) INSTALL INLET & OUTLET TEES W/ GAS BAFFLE AS REQUIRED 4) PLUMBING TO BE MODIFIED TO MEET OUTLET LOCATION AND ELEVATION, PLUMBING PERMIT REQUIRED. SEPTIC SYSTEM PROFILE NOTE: BRING LEACHING COVERS TO GRADE W/ METAL RINGS/COVER FINISHED GRADE MAINTAIN 2% MIN SLOPE OVER LEACHING AREA 2" OF 3/8" DOUBLE WASHED STONE OR FILTER FABRIC 4" SCH 40 PVC 1% (MIN. 2' E�F. DEPTHINE 44.80 4' INV. ELEV.= 44.50 TOP CONC. ELEV.= 45.50 INV. ELEV.= 44.50 - BOTTOM EL.= 42.50 - SEPARATION 5.50 FT. BOTTOM OF TESTHOLE EL: 37.00 aE3E3®® E3 E3 E3 E3 E3 E3 E3 E3 E3 E3 2X8.5'(4'B 3/4" - 1-1/2" DOUBLE WASHED EFFECTIVE LENGTH = 29' BREAKOUT ELEV.= 45.5 E3 E3 E3 E3 EM ®®® 2.5' I 5 FT. I 2.5' EFFECTIVE WIDTH = 10' SOIL ABSORPTION SYSTEM (SECTION) 500 GALLON H-20 LEACH CHAMBER) GENERAL NOTES: DESIGN CRITERIA SOIL LOGS 1. ALL CHANGES TO THIS PLAN MUST BE APPROVED BY THE LOCAL BOARD OF HEALTH AND THE DESIGN ENGINEER. NUMBER OF BEDROOMS: 3 BR DESIGN (NO INCREASE IN FLOW) 2. ALL WORK AND MATERIALS SHALL CONFORM TO THE REQUIREMENTS DATE: JANUARY 6, 2022 SOIL TEXTURAL CLASS: CLASS I (0.74 GPD/SF) OF THE STATE ENVIRONMENTAL CODE, TITLE V, AND ANY APPLICABLE SOIL EVALUATOR: DARREN MEYER, R.S., CSE #1614 DESIGN PERCOLATION RATE: <2 MIN/IN LOCAL RULES AND REGULATIONS, EXCEPT AS LISTED ON PAGE 1. WITNESS: PHIL RENAUD, YARMOUTH HEALTH DEPT. DAILY FLOW: 110 G.P.D. X 3 BR = DESIGN FLOW: 330 G.P.D. 3. THE SEWAGE DISPOSAL SYSTEM SHALL NOT BE BACKFILI.ED PRIOR TO INSPECTION AND APPROVAL BY THE BOARD OF HEALTH AND THE DESIGN ENGINEER. TP -1 GARBAGE GRINDER: NO (not designed for garbage grinder) 4. ANY CONDITIONS ENCOUNTERED DURING CONSTRUCTION DIFFERING Elev. Depth 4850 0" SEPTIC TANK: 330 gpd x 200% = 660 gpd USE PROP. 1,SOOG SEPTIC TANK FROM THOSE SHOWN HEREON SHALL BE REPORTED TO THE DESIGN ENGINEER BEFORE CONSTRUCTION CONTINUES. FILL LEACHING AREA REQUIRED: (330)/0.74 = 445.94 S.F. 5. ALL ELEVATIONS BASED ON ASSUMED DATUM. FAILURE OF 44.50 A 48" USE TWO (2) 500 GALLON (H-20) PRECAST LEACH CHAMBERS W/ 4' 6. THE DESIGN ENGINEER IS NOT RESPONSIBLE FOR THE LOAMY SAND THE CONTRACTOR OR OWNER TO NOTIFY THE LOCAL BOARD OF 10YR 4/1 STONE ON ENDS/BETWEEN 8c 2.5' STONE ON SIDES: 29'Lx10'Wx2'D HEALTH FOR PROPER INSPECTIONS DURING CONSTRUCTION. 44.09 53" 7. WATER SUPPLY PROVIDED BY TOWN WATER SERVICE B BOTTOM AREA: 29 x 10 = 290 SF 8. ALL AREAS DISTURBED DURING CONSTRUCTION SHALL BE RESTORED LOAMY SAND TO A CONDITION AGREED UPON BETWEEN OWNER AND CONTRACTOR. 10YR 5/8 SIDE AREA: (29 + 10) X 2 X 2 = 156 SF 9. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE THE LOCATION OF ALL UNDERGROUND UTILITIES, PRIOR TO BEGINNING 42'34 C 74" TOTAL SQUARE FEET PROVIDED = 446 vs. 445.94 REQ'D CONSTRUCTION. '. DESIGN FLOW PROVIDED: 0.74(446 S.F.) = 330 G.P.D. vs. 330 G.P.D. req'd 10. EXISTING TANK/LEACHING PR TO BE PUMPED, CRUSHED AND FILLED PER TITLE 5.SIEVE SAMPLE MEDIUM 11. 48 HOUR NOTICE FOR ENGINEER CERTIFICATION 0 EL 40.50 6/4 2,SY D 12. THIS PLAN IS To BE USED FOR SEPTIC SYSTEM PURPOSES ONLY PROPOSED SEPTIC SYSTEM UPGRADE PLAN AND IS NOT TO BE CONSIDERED A PROPERTY LINE SURVEY 13. NO PRIVATE WELLS WITHIN 150' OF PROPOSED LEACHING. 37.00 138" 8 McNAMARA AVENUE, WEST YARMOUTH, MA 14. PLUMBING TO BE MODIFIED TO MEET OUTLET LOCATION AND ELEVATION (PERMIT REQUIRED) PERC PATE <2 MIN/IN. ("C" HORIZON) PER SIEVE TEST 15. ALL PIPING TO BE 4" SCH 40 0 1/8"/FT (UNLESS SPECIFIED) NO GROUNDWATER OBSERVED Prepared for: Kevin Holland 16. REMOVED UNSUITABLE SOILS 5 FT. AROUND LEACHING TO EL. 42.34 - Design and Site Plan by: SCALE DRAWN DATE OR TOP OF "C" LAYER AND REPLACE W/ CLEAN MEDIUM SAND PER TITLE 5. &SONS, INC. N.T.S. DMM 01 �2$�22 17. PLACE 40 ml POLY LINER AS SHOWN AT EDGE OF SOIL REMOVAL FROM * I, Darren M. Meyer, R.S., CSE, hereby certify that I am currently approved by MADEP pursuant to 310 CMR 15.017 PO BOX PO BOX 981 EL 44.50 TO 40.50 TO PREVENT INFILTRATION TO BASEMENT. to conduct soil evaluations and that the above analysis has been Performed by me consistent with the requirements of 310 CMR 15.017. I further certify that 1 have passed the Soil Ewl. Exam in October, 1999. EAST SANDWICH, MA 02537 REV DATE CHECKED SHEET NO. 18. REFER TO YARMOUTH CONSERVATION'S STANDARD CONDITIONS FOR CONSTRUCTION REQUIREMENTS. 508-362-2922 03/08/22 DMM 2 Of 2