HomeMy WebLinkAboutCorrespondence 3.21.2022
Grant, Kelly
From:Sweetser Engineering <sweetsereng@aol.com>
Sent:Monday, March 21, 2022 1:07 PM
To:Grant, Kelly
Subject:Re: Yarmouth ConComm projects
Attention!: This email originates outside of the organization. Do not open attachments or click links unless you are
sure this email is from a known sender and you know the content is safe. Call the sender to verify if unsure.
Otherwise delete this email.
KELLY,
YOU HAVE GIVEN ME A WEEK MORE THAN I HAD
EXPECTED!!!!
EXETER IS EASY, HOWEVER WHEN WORKING ON ALMS HOUSE
ROAD, WHAT DO YOU MEAN BY HAVE THE SITE STAKED?
PERIMETER BOUNDS OR JUST THE PROPOSED COMPONENTS?
THE NOTE ON THE 1986-87 PLAN STATES THAT IT IS A 3
BEDROOM PER "DEQE" REGULATIONS. HAVING BEEN INSIDE
THE HOUSE THERE ARE 2 BEDROOMS UPSTAIRS AND 1
BEDROOM (WITH QUEENSIZE BED) DOWN. THE ONLY THING
UNUSUAL IS THERE ARE 2 DOORS INTO THE ROOM, ONE OF
WHICH IS BLOCKED BY DRESSER. EITHER WAY THE MINIMUM
DESIGN IS REQUIRED TO BE FOR 3 BEDROOMS.
THE HOUSE IS USABLE 24/7/365 DAYS PER YEAR. SEASONAL
USAGE ONLY SPIKES THE I/A FOR ABOUT 6 WEEKS THEN
RETURNS TO NORMAL AND OF COURSE NO OCCUPANCY
MEANS NO FLOW.
A TIGHTTANK ONLY HAS TO BE 50' FROM A WELL.
THE WELL IS THE INTEGRAL QUESTION.
ROBIN
Regards,
Gail Alger-Wilcox
Office Manager
1
Sweetser Engineering
508-385-6900
-----Original Message-----
From: Grant, Kelly <KGrant@yarmouth.ma.us>
To: 'Sweetser Engineering' <sweetsereng@aol.com>
Sent: Fri, Mar 18, 2022 1:35 pm
Subject: Yarmouth ConComm projects
Hi Robin
I wanted to follow up on last night’s hearing to confirm the updates to be provided.
122 Exeter Rd –
approved pending receipt of an updated plan showing drainage swales around the sides and front of the lot, pervious
driveway and a replanting plan. The road layout in the front of the lot that was cleared should have the trees replaced.
The plan must be received by March 31
th
50 Alms House Rd – continued to April 7. Revised/new material to be received by March 31.
Need the site staked,
Existing vegetation shown on the plan,
Proposed access for the well installation shown on the plan
Is there a less intrusive way to do a test boring to see if potable water is available at the proposed location?
Septic design should be 2 bedroom based on the previously approved house and septic design
Information on functioning of an IA system when used seasonally
Can the well be located further away from the wetland if a tight tank is used?
Thanks
Kelly Grant
Conservation Administrator
Town of Yarmouth
508-398-2231 Ext 1288
kgrant@yarmouth.ma.us