Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST G Location: A.M. Lot Zone of Contribution: In Out Acreage a 4O&U Commercial: Residential: �-- Street: i . w� - C Village: Floor Plan: #Bedrooms: 3 c Y's 71,-0.-. Owner: ICI/be(7D t3.ec AA f' PCo,5frcc /orS 4l ��rol,ds�� � ct�� iN p Installer: Km Address: Phone: SOS 3$b - 5c7 c, Phone: 7 R/ q4' - /S 6 Builder: Engineer: 0 o LA.) ry C 14 p-eEN Si N e p r 4:5 Address: Phone: SD - 3.4s - 4/3-40 Phone: N/A YES NO 1.Required#of copies received 1/- 2. /2.Date of soils exam and percolation test not older than 2 years l/. 3.4-5 ft of naturally occurring pervious material,above water table ,f 4.Foundation 2 ft above high point of road H.P.: End: Var.: V- 5.Water line 10 ft from septic components Var.: V' 6.Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation,deck Var.: 1 4.---- 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 9.Leaching minimum 100 ft from wetlands Var.: 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 1,/--- 11.Tank/leaching minimum 10 ft from property line Var.: V 12. System meets all other setback requirements Var.: , 13.Uses adjustment for maximum highV ✓5 c groundwater Var.: 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: i/ 15. System not in top or subsoil(A,B horizons)or 5'removal I ✓ 16.Proposed contours are suitable I ✓ 17. System meets slope requirements-min. 1/8", '4"preferred 18. System meets breakout requirements PVC liner: Wall: V 19. Specified tee sizes are proper,gas baffle on outlet tee 20. Sewage is under 10,000 gpd for parcel 21.No garbage disposal 1 22. System adequately sized for its intended use V 23.Minimum 6"stone or compacted below tank and dbox I ,/_ 24.Manhole covers within 6"of grade,pump chamber cover to grade 25. Inspection port on plastic chambers/leach field L/- 26. /26.Electrical permit for pump chamber/Separate meter for duplexes 'V 27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size t// 28. Septic tank/pump chamber to be factory waterproofed V 29.Vent provided if leaching below 3 feet,under driveway/parking 30.Buoyancy calculations for tank/pump chamber 31. Engineer to inspect and certify soils: wall: commercial: t...-/ 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature / ✓ 33.H-20 loading is subject to vehicular traffic, groundwater 34.Title V Application and permit fee,installer signature L.--- 35.Foundation footing min. 2 feet above adjusted ground water for new house 4� 36.Deed Restriction required max. #bedrooms: max. flow: gpd 37.Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed byol(-;fix, Q(,t..0,------- v o:o: