HomeMy WebLinkAbout8807 C5 Details_NotesROADWAY PAVEMENT SECTION:
LU w
J NOT TO SCALE J
LU w
40'
(RIGHT OF WAY) 2'MIN.
( ) TYPICAL WOODEN GUARDRAIL
24'
8' SHOULDER 12 12 12' 12'� 8' SHOULDER
o? l
PX SV
3 HIGH BERM 3 HIGH BERM
1/4" PER FOOT PITCH 1/4" PER FOOT PITCH 1 (�
- - - - - -
�l '(MAX+)
�P�S�OQ
1 3 y 6 Ir 'I 6 I`
3 ------
GAS MAIN " "
CABLE/ELECTRIC LINES
6'----
1" FINISH COVER (ROLLED)*
2" BINDER COURSE (ROLLED)*
9 1/2" DENSE GRADE CRUSHED STONE BASE ((2) 4 3/4" LIFTS)*
(MIN) 4" CLEAN SAND (SUB -BASE)
ALL ROADWAY FILL SHALL BE CLEAN SAND PLACED IN
(MAX) 6" LIFTS AND COMPACTED TO 95% DENSITY AS
DETERMINED BY THE MODIFIED PROCTOR TEST
(*SEE BELOW NOTES FOR SPECIFICATIONS ON ROAD CONSTRUCTION
WITHIN ROUTE 6A STATE HIGHWAY LAYOUT)
STATE HIGHWAY LAYOUT PAVEMENT NOTES:
• PROPOSED ROADWAY (WITHIN SHLO) SHALL HAVE AN 8" GRAVEL BASE THAT HAS BEEN MACHINE
COMPACTED THEN PAVED WITH 4" OF HOT MIX ASPHALT (HMA) LAID IN TWO COURSES CONSISTING
OF A 2-1/2" BINDER COURSE AND A 1-1/2" FINISH COURSE.
• ANY EXISTING HMA BERM THAT EXISTS WITHIN THE PROPOSED DRIVEWAY MUST BE SAWCUT AND
REMOVED. THE NEW PAVEMENT MUST TIE INTO, AND NOT OVERLAP, THE EDGE OF THE HARDENED
SURFACE OF THE ROADWAY. ALL ABUTTING EDGES OF THE EXISTING PAVEMENT SHALL BE COATED
WITH A HOT POURED JOINT SEALER IMMEDIATELY PRIOR TO THE PLACEMENT OF THE HMA.
UPPER DRAINAGE FACILITY SECTION:
NOT TO SCALE
erm
24"x24" Cast Iron Frame and Grate
Raised to Grade
Use EJIW LF248-2 OR EQUAL
12" DIAM. HDPE @ 0% PITCH
Solid 4' Dia.
Catch Basin
USE H-20
AS MANUFACTURED BY SHOREY OR EQUAL
24" Diam. Cast Iron Frame and Cover
Raised to Grade
Use EJIW LK 110A or Equal
4' m
Solid 4' Dia.
Manhole
USE H-20
AS MANUFACTURED BY SHOREY OR EQUAL
Berm
12" DIAM. HDPE @ 1% PITCH
LOWER DRAINAGE FACILITY SECTION:
NOT TO SCALE
24"x24" Cast Iron Frame and Grate
Raised to Grade
Use EJIW LF248-2 OR EQUAL
erm
RIM=39.2±
s
41rDIAM:HDPE @ 0% PITCH
Lrl
Ln
4'
Solid 4' Dia.
Catch Basin
USE H-20
AS MANUFACTURED BY SHOREY OR EQUAL
SWALE NOTES:
30'±
6'
4" TOPSOIL
DRIVEWAY PAVEMENT SECTION:
NOT TO SCALE
REQUIRED ACCESS PRUNING ZONE
F TA
(12' LL X14' WIDEN
10' (ACCESS)
2' 20' (PARKING) 2'
1/4" P�ERFOOTPITCH 1,
DRIVEWAY NOTES:
�S�o • IN ORDER TO ALLOW SAFETY VEHICLE ACCESS TO
DRIVEWAYS, ALL DRIVEWAYS SHALL BE 10' WIDE WITH 2'
GRASSED SHOULDERS ON EACH SIDE (2% MAX. GRADE).
1" FINISH COVER (ROLLED)
8" WATER MAIN 1.5 BINDER COURSE (ROLLED) • GRASSED SHOULDERS SHALL BE UNDERLAIN WITH
4" DENSE GRADE CRUSHED STONE BASE (14' WIDE) CRUSHED STONE BASE, AS SHOWN, TO PROVIDE
(MIN) 4" CLEAN SAND (SUB -BASE) ADDITIONAL SLOPE STABILITY FOR SAFETY VEHICLE ACCESS.
ALL DRIVEWAY FILL SHALL BE CLEAN SAND PLACED IN
(MAX) 6" LIFTS AND COMPACTED TO 95% DENSITY AS • VEGETATION SHALL BE PRUNED TO ALLOW A 14' WIDE,
DETERMINED BY THE MODIFIED PROCTOR TEST 12' TALL ACCESS WAY.
HOT MIX ASPHALT NOTES:
• ALL HOT MIX ASPHALT (HMA) PAVEMENT SHALL BE
CONSTRUCTED PER MASSDOT'S 2021 STANDARDS AND
SPECIFICATIONS FOR HIGHWAYS AND BRIDGES,
SUBSECTION 460: HOT MIX ASPHALT PAVEMENT FOR LOCAL
STREETS.
• EACH HMA PAVEMENT COURSE SHALL BE COMPRISED
OF ONE OF THE MIXTURE TYPES LISTED ON TABLE 460.10-1,
SUBSECTION 460.
Upper Dry
Water Quality Swale
SEE SWALE NOTES
RIM=50.5± 1
BOTTOM=49.0±
RIP -RAP SPLASH PAD
SEE RIP -RAP DETAIL
24" Diam. Cast Iron Frame and Cover
_ Raised to Grade
Use EJIW LK 110A or Equal
Berm
12" DIAM. HDPE @ 1% PITCH
Ln
Ln
4' "
Solid 4' Dia.
Manhole
USE H-20
AS MANUFACTURED BY SHOREY OR EQUAL
1.) THE BOTTOM AND SIDE SLOPES OF THE SWALE, UP TO THE TOP OF THE
OUTFLOW PIPE FROM THE MANHOLE, SHALL BE COVERED WITH 6 INCHES OF
LOAM AND SEEDED WITH A WET MEADOW SEED MIX. APPLICATION RATE SHALL
BE PER MFG'S SPECIFICATIONS.
2.) THE SLOPES ABOVE THE OUTFALL PIPE FROM MANHOLE SHALL BE COVERED
WITH A MINIMUM OF 4 INCHES OF LOAM, COVERED WITH THE ON-SITE GROUND
VEGETATION.
3.) ALL SLOPED AREAS SHALL BE COVERED WITH JUTE NETTING EROSION CLOTH,
SECURED IN PLACE.
RIP -RAP DETAIL FOR OUTFALL PIPE:
12'
RIPRAP NOTES:
1.) RIP -RAP SHALL BE PLACED INTO CLEAN SAND, FREE
OF SILT AND DEBRIS.
2.) RIP -RAP STONE SHALL BE 6" TO 8" STONE PLACED IN
RANDOM PATTERN WITH UNEVEN SURFACE SO AS TO
REDUCE DISCHARGE ENERGY.
3.) THE BED OF RIP -RAP SHALL BE 1.5 FEET THICK.
4.) RIP -RAP STONE SHALL BE LAID ON A DOUBLE LAYER
OF FILTER FABRIC.
70'±
LOW PIPE
AIRED END SECTION
,UTLET GUARD
WOODEN GUARDRAIL SECTION:
NOT TO SCALE
00 3x9 Wood Railing 00
�24"x24" Cast Iron Frame and Grate
Raised to Grade
Use EJIW LF248-2 OR EQUAL
18" MAX. WATER DEPTH
12" DIAM. HDPE @ 1% PITCH (MIN.)
HIOVERFLOW CONNECTS TO
LOWER DRAINAGE SYSTEM
�n
4'
Solid 4' Dia.
Catch Basin
USE H-20
AS MANUFACTURED BY SHOREY OR EQUAL
Lower Dry
Water Quality Swale
SEE SWALE NOTES
f
RIM=35.5±
BOTTOM=34.0±
RIP -RAP SPLASH PAD
SEE RIP -RAP DETAIL
24"x24" Cast Iron Frame and Grate
Raised to Grade
Use EJIW LF248-2 OR EQUAL
18" MAX. WATER DEPTH
12" DIAM. HDPE @ 1% PITCH
4'
4 r ,
Solid 4' Dia.
Catch Basin
USE H-20
AS MANUFACTURED BY SHOREY OR EQUAL
DRAINAGE LEACHING FACILITY:
SCALE: 1"=10'
70'
7' 14' 141---j14`---j14' 7'
24" Diam. Cast Iron Frame and Cover
Raised to Grade (ALL 5 UNITS)
Use EJIW LK 110A or Equal
1000 Gallon
Leaching Pit (6'x6'6)
USE H-20
AS MANUFACTURED BY SHOREY OR EQUAL
70'x 14'x 6' Leaching Facility:
(5) Pits, spaced 14' on center
with stone around
TYPICAL CATCH BASIN & MANHOLE SECTION
NOT TO SCALE
PIPE CONNECTIONS TO
P11
Solid 4' Dia. Solid 4' Dia. Solid 4' Dia.
Catch Basin Manhole Catch Basin
USE H-20 USE H-20 USE H-20
AS MANUFACTURED BY SHOREY OR EQUAL AS MANUFACTURED BY SHOREY OR EQUAL AS MANUFACTURED BY SHOREY OR EQUAL
(4) 3/4" Galvanized
Bolt & Nut Fasteners, per post
x6 Wood Posts
DRAINAGE CONSTRUCTION NOTES:
1.) ALL COMPONENTS, SUBJECT TO WHEEL LOADS, SHALL BE RATED H-20.
2.) ALL WORKMANSHIP PROVIDED SHALL BE IN CONFORMANCE WITH THE TOWN OF YARMOUTH
PLANNING BOARD & ENGINEERING SPECIFICATIONS.
3.) ANY MODIFICATIONS AND/OR DEVIATIONS FROM THE PLANS SHALL BE REVIEWED AND
APPROVED BY THE ENGINEERING DEPARTMENT.
CATCH BASIN AND LEACHING NOTES:
1.) ALL PROPOSED CATCH BASINS, LEACHING GALLERIES, AND TRENCHING ACROSS PARKING AREAS AND
SIDEWALKS SHALL BE BACKFILLED, AND COMPACTED IN 6 -INCH LIFTS. COMPACTION SHALL MEET 95%
STANDARD PROCTOR REQUIREMENTS. ALL BACKFILL MATERIAL SHALL BE DENSE GRADED CRUSHED
STONE WITH A MAX SIZE OF 3/4" OR ENGINEERED APPROVED EQUAL.
2.) THE LEACHING CHAMBERS SHALL BE SET FULLY INTO CLEAN SAND. DESIGN ENGINEER SHALL INSPECT
THE SOILS AROUND AND BELOW THE LEACHING FACILITY PRIOR TO FACILITY INSTALLATION.
3.) ALL CAST IRON FRAMES AND SEALS FOR DRAINAGE COMPONENTS SHALL BE FINISHED WITH MORTAR
CEMENT.
4.) CATCH BASIN GRATES SHALL BE PLACED OVER FILTER FABRIC UNTIL SITE IS PAVED WITH BINDER
COARSE. CONTRACTOR IS RESPONSIBLE TO MAINTAIN THE FILTER FABRIC SO SEDIMENT DOES NOT GET
INTO CATCH BASIN.
5.) EXISTING CATCH BASIN ON ROUTE 6A SHOULD BE FITTED WITH SILT SOCK SO AS TO PROTECT
DRAINAGE DURING CONSTRUCTION OF THE ROADWAY.
6.) THE TWO CATCH BASINS AT STA 3+09.48 ON MIRACLE WAY SHALL BE FITTED WITH CASCADE STYLE
GRATES, IN ORDER TO HANDLE FAST-MOVING RUNOFF IN THE 8% SLOPE AREA OF THE ROAD.
ROOF RUN-OFF:
1.) ALL ROOF GUTTERS SHOULD BE DIRECTLY CONNECTED TO LEACHING FACILITIES USING 6"
ADS PIPE.
2.) EACH DWELLING SHALL UTILIZE A TOTAL OF (4) CULTEC RECHARGER 330XLHD
STORMWATER LEACHING UNITS, SPLIT INTO (2) 15.5'X 4.33' LEACHING FACILITIES.
3.) LEACHING FACILITIES SHALL BE SET FULLY INTO CLEAN SAND. NO STONE REQUIRED
ACCESS ROAD:
1.) DURING CONSTRUCTION, A 20' WIDE STONE APRON SHALL BE CONSTRUCTED AT THE
PROPOSED ENTRANCE FOR DUST/SILT CONTROL.
2.) STONE APRON SHALL REMAIN IN PLACE UNTIL THE ENTRANCE HAS BEEN PAVED.
STRAW WATTLE/EROSION CONTROL DETAIL:
TYPICAL SECTION
Fill
3" Height
FLOW DIRECTION
Stake
iw Wattle
'�'Existin£ Grade
1.) LIMIT OF WORK SHALL BE MADE UP OF A 9" DIAMETER STRAW WATTLE INSTALLED PER THE
MANUFACTURERS SPECIFICATIONS.
2.) CONTRACTOR SHALL BE RESPONSIBLE FOR PREVENTING EROSION/ RUNOFF DURING
CONSTRUCTION.
3.) LIMIT OF WORK SHALL BE INSTALLED PRIOR TO ANY WORK BEING STARTED
STORMWATER POLLUTION PREVENTION PLAN:
PRIOR TO CONSTRUCTION, A STORMWATER POLLUTION PREVENTION PLAN (SWPPP) WILL BE PREPARED AND
SUBMITTED ALONG WITH THE ACCOMPANYING NOTICE OF INTENT TO THE UNITED STATES ENVIRONMENTAL
PROTECTION AGENCY. THE SWPPP WILL CONTAIN ALL SPECIFICATIONS AND REQUIREMENTS FOR STORMWATER AND
EROSION CONTROL PROTOCOL DURING THE CONSTRUCTION PHASE. CONTRACTOR SHALL REVIEW THE SWPPP PLAN IN
DETAIL IN ADDITION TO THESE PLANS AND DETAILS PRIOR TO START OF CONSTRUCTION.
G:\AAJobs\THE DAVENPORT COMPANY -ROUTE 6A -YARMOUTH PORT\DWG\Definitive Site Plans.dwg
EXISTING GRADE
E
' O.C.
O.C.
�24"x24" Cast Iron Frame and Grate
Raised to Grade
Use EJIW LF248-2 OR EQUAL
18" MAX. WATER DEPTH
12" DIAM. HDPE @ 1% PITCH (MIN.)
HIOVERFLOW CONNECTS TO
LOWER DRAINAGE SYSTEM
�n
4'
Solid 4' Dia.
Catch Basin
USE H-20
AS MANUFACTURED BY SHOREY OR EQUAL
Lower Dry
Water Quality Swale
SEE SWALE NOTES
f
RIM=35.5±
BOTTOM=34.0±
RIP -RAP SPLASH PAD
SEE RIP -RAP DETAIL
24"x24" Cast Iron Frame and Grate
Raised to Grade
Use EJIW LF248-2 OR EQUAL
18" MAX. WATER DEPTH
12" DIAM. HDPE @ 1% PITCH
4'
4 r ,
Solid 4' Dia.
Catch Basin
USE H-20
AS MANUFACTURED BY SHOREY OR EQUAL
DRAINAGE LEACHING FACILITY:
SCALE: 1"=10'
70'
7' 14' 141---j14`---j14' 7'
24" Diam. Cast Iron Frame and Cover
Raised to Grade (ALL 5 UNITS)
Use EJIW LK 110A or Equal
1000 Gallon
Leaching Pit (6'x6'6)
USE H-20
AS MANUFACTURED BY SHOREY OR EQUAL
70'x 14'x 6' Leaching Facility:
(5) Pits, spaced 14' on center
with stone around
TYPICAL CATCH BASIN & MANHOLE SECTION
NOT TO SCALE
PIPE CONNECTIONS TO
P11
Solid 4' Dia. Solid 4' Dia. Solid 4' Dia.
Catch Basin Manhole Catch Basin
USE H-20 USE H-20 USE H-20
AS MANUFACTURED BY SHOREY OR EQUAL AS MANUFACTURED BY SHOREY OR EQUAL AS MANUFACTURED BY SHOREY OR EQUAL
(4) 3/4" Galvanized
Bolt & Nut Fasteners, per post
x6 Wood Posts
DRAINAGE CONSTRUCTION NOTES:
1.) ALL COMPONENTS, SUBJECT TO WHEEL LOADS, SHALL BE RATED H-20.
2.) ALL WORKMANSHIP PROVIDED SHALL BE IN CONFORMANCE WITH THE TOWN OF YARMOUTH
PLANNING BOARD & ENGINEERING SPECIFICATIONS.
3.) ANY MODIFICATIONS AND/OR DEVIATIONS FROM THE PLANS SHALL BE REVIEWED AND
APPROVED BY THE ENGINEERING DEPARTMENT.
CATCH BASIN AND LEACHING NOTES:
1.) ALL PROPOSED CATCH BASINS, LEACHING GALLERIES, AND TRENCHING ACROSS PARKING AREAS AND
SIDEWALKS SHALL BE BACKFILLED, AND COMPACTED IN 6 -INCH LIFTS. COMPACTION SHALL MEET 95%
STANDARD PROCTOR REQUIREMENTS. ALL BACKFILL MATERIAL SHALL BE DENSE GRADED CRUSHED
STONE WITH A MAX SIZE OF 3/4" OR ENGINEERED APPROVED EQUAL.
2.) THE LEACHING CHAMBERS SHALL BE SET FULLY INTO CLEAN SAND. DESIGN ENGINEER SHALL INSPECT
THE SOILS AROUND AND BELOW THE LEACHING FACILITY PRIOR TO FACILITY INSTALLATION.
3.) ALL CAST IRON FRAMES AND SEALS FOR DRAINAGE COMPONENTS SHALL BE FINISHED WITH MORTAR
CEMENT.
4.) CATCH BASIN GRATES SHALL BE PLACED OVER FILTER FABRIC UNTIL SITE IS PAVED WITH BINDER
COARSE. CONTRACTOR IS RESPONSIBLE TO MAINTAIN THE FILTER FABRIC SO SEDIMENT DOES NOT GET
INTO CATCH BASIN.
5.) EXISTING CATCH BASIN ON ROUTE 6A SHOULD BE FITTED WITH SILT SOCK SO AS TO PROTECT
DRAINAGE DURING CONSTRUCTION OF THE ROADWAY.
6.) THE TWO CATCH BASINS AT STA 3+09.48 ON MIRACLE WAY SHALL BE FITTED WITH CASCADE STYLE
GRATES, IN ORDER TO HANDLE FAST-MOVING RUNOFF IN THE 8% SLOPE AREA OF THE ROAD.
ROOF RUN-OFF:
1.) ALL ROOF GUTTERS SHOULD BE DIRECTLY CONNECTED TO LEACHING FACILITIES USING 6"
ADS PIPE.
2.) EACH DWELLING SHALL UTILIZE A TOTAL OF (4) CULTEC RECHARGER 330XLHD
STORMWATER LEACHING UNITS, SPLIT INTO (2) 15.5'X 4.33' LEACHING FACILITIES.
3.) LEACHING FACILITIES SHALL BE SET FULLY INTO CLEAN SAND. NO STONE REQUIRED
ACCESS ROAD:
1.) DURING CONSTRUCTION, A 20' WIDE STONE APRON SHALL BE CONSTRUCTED AT THE
PROPOSED ENTRANCE FOR DUST/SILT CONTROL.
2.) STONE APRON SHALL REMAIN IN PLACE UNTIL THE ENTRANCE HAS BEEN PAVED.
STRAW WATTLE/EROSION CONTROL DETAIL:
TYPICAL SECTION
Fill
3" Height
FLOW DIRECTION
Stake
iw Wattle
'�'Existin£ Grade
1.) LIMIT OF WORK SHALL BE MADE UP OF A 9" DIAMETER STRAW WATTLE INSTALLED PER THE
MANUFACTURERS SPECIFICATIONS.
2.) CONTRACTOR SHALL BE RESPONSIBLE FOR PREVENTING EROSION/ RUNOFF DURING
CONSTRUCTION.
3.) LIMIT OF WORK SHALL BE INSTALLED PRIOR TO ANY WORK BEING STARTED
STORMWATER POLLUTION PREVENTION PLAN:
PRIOR TO CONSTRUCTION, A STORMWATER POLLUTION PREVENTION PLAN (SWPPP) WILL BE PREPARED AND
SUBMITTED ALONG WITH THE ACCOMPANYING NOTICE OF INTENT TO THE UNITED STATES ENVIRONMENTAL
PROTECTION AGENCY. THE SWPPP WILL CONTAIN ALL SPECIFICATIONS AND REQUIREMENTS FOR STORMWATER AND
EROSION CONTROL PROTOCOL DURING THE CONSTRUCTION PHASE. CONTRACTOR SHALL REVIEW THE SWPPP PLAN IN
DETAIL IN ADDITION TO THESE PLANS AND DETAILS PRIOR TO START OF CONSTRUCTION.
G:\AAJobs\THE DAVENPORT COMPANY -ROUTE 6A -YARMOUTH PORT\DWG\Definitive Site Plans.dwg