HomeMy WebLinkAboutEngineer Plan(28.5)
Map 60
Parcel 233
Map 60
Parcel 229
Map 60
(29.�
Parcel 231
Map 60 15,40 \+\
Parcel 232
3" E-- House #9\ \
A.p229 (29'9)-�- 4 Bedroom +
N14702:
+\ Potio TOF EL = 30.0\\ \\
Lot Area
39,599± Sq. Ft`s (29.2> ('93\)
(28.5)
(29.9)
ne
�-Top 01 Bound (28.9) \� P,2ss> TH e\
TBM EL = 28 5 (29.1)0 L 3 C
Yarmouth Health Department
htAAS
Name
110
1.) Assessor's Map 60 Parcel 230
2.) Bk. 32131 Pg. 3
3.) PI. 343 Pg 88
4.) This property is not in the Zone II
Water Protection District
5.) This property is in Flood Zone X
Firm Map 25001CO587J 7/16/14
0
C-
-77
Proposed
3 Spaces
/ 28.3) )
i 24" 1
NOTE:
LOCATION OF UTILITIES IS APPROXIMATE AND ALL
UNDERGROUND AND OVERHEAD UTILITIES MUST BE
DETERMINED IN THE FIELD PRIOR TO COMMENCEMENT
OF ANY WORK, THIS INCLUDES, BUT NOT LIMITED TO,
REQUESTS TO DIGSAFE, ANY PRIVATE UTILITY COMPANIES
AND THE LOCAL WATER DEPARTMENT.
o+
C. 0. _ t Deck \
Q
ST �•
.p ��3" Tree +
18 T °11.81 28.2) P(9of 5j w (26.1
Hedge 28
N+
Flag Poie
to be
X23 relocated (28.5) / ++
Proposed
1 Bedroom / +
F—„ + TOF EL = 30.0 /
X18 (28.2) \g274)
�--� Q
Existinal
{—Tree t8.5) /
1
D/W ' \� 41�
27.4
Zoning
R-40
40,000 SF
150' Frontage
Max. Coverage 25%
Existing Coverage 6.1%
Proposed Coverage 7.9%
Setbacks
Front 30'
Side 20'
Rear 20'
� s
a o� StCeei
01 00 00:0
N 7
o
�3
LOCUS
N
Q
ti
t SLtee
o ea \
i
r / Bass River
SOUTH YARMOUTH, MA
Site Plan
for
Proposed Building
located at
SITE LOCUS
NOT TO SCALE
B.
MOOT^.E
NO. ;sss
9 Homer Avenue South Yarmouth, MA
Prepared for:
Christina P. Demetriou,
9 Homer Avenue
South Yarmouth, MA
Prepared by:
All Cape Septic and Survey
Tr. 618 Route 28
West Yarmouth, MA 02673
(508) 771-4200
allcapesepticOgmoil. com
December 28, 2021 Sheet 1 of 2 By: MA Check: SM Dwg. #382
5 6a ` LO (26.9)
l�
`
(26.6) ' \
(27.1)
GRAPHIC SCALE
15 30 60
( IN FEET )
1 inch = 30 It
JL
e
\\
+ Barn
\
TP
— —
+ \I
—
29 + a m
+\\(29.3)
ee#19
\ Existing
`%'
—
��\
Holl Tree
(28
ST
Q +
Proposed
3 Spaces
/ 28.3) )
i 24" 1
NOTE:
LOCATION OF UTILITIES IS APPROXIMATE AND ALL
UNDERGROUND AND OVERHEAD UTILITIES MUST BE
DETERMINED IN THE FIELD PRIOR TO COMMENCEMENT
OF ANY WORK, THIS INCLUDES, BUT NOT LIMITED TO,
REQUESTS TO DIGSAFE, ANY PRIVATE UTILITY COMPANIES
AND THE LOCAL WATER DEPARTMENT.
o+
C. 0. _ t Deck \
Q
ST �•
.p ��3" Tree +
18 T °11.81 28.2) P(9of 5j w (26.1
Hedge 28
N+
Flag Poie
to be
X23 relocated (28.5) / ++
Proposed
1 Bedroom / +
F—„ + TOF EL = 30.0 /
X18 (28.2) \g274)
�--� Q
Existinal
{—Tree t8.5) /
1
D/W ' \� 41�
27.4
Zoning
R-40
40,000 SF
150' Frontage
Max. Coverage 25%
Existing Coverage 6.1%
Proposed Coverage 7.9%
Setbacks
Front 30'
Side 20'
Rear 20'
� s
a o� StCeei
01 00 00:0
N 7
o
�3
LOCUS
N
Q
ti
t SLtee
o ea \
i
r / Bass River
SOUTH YARMOUTH, MA
Site Plan
for
Proposed Building
located at
SITE LOCUS
NOT TO SCALE
B.
MOOT^.E
NO. ;sss
9 Homer Avenue South Yarmouth, MA
Prepared for:
Christina P. Demetriou,
9 Homer Avenue
South Yarmouth, MA
Prepared by:
All Cape Septic and Survey
Tr. 618 Route 28
West Yarmouth, MA 02673
(508) 771-4200
allcapesepticOgmoil. com
December 28, 2021 Sheet 1 of 2 By: MA Check: SM Dwg. #382
5 6a ` LO (26.9)
l�
`
(26.6) ' \
(27.1)
GRAPHIC SCALE
15 30 60
( IN FEET )
1 inch = 30 It
ExlSling
30 t
CONSTRUCTION
RAISE TO WITHIN a OF FINISH GRADE EL 30.0 RAISE TO WITHIN r OF FINISH GRADE RAISETO WITHIN 8" OF FINISH GRADE
MINIMUM 20" DIAMETER COVER 'p�,I MINIMUM 20" DIAMETER COVER MINIMU 20 DIAME E COVER
EI = 29.0 L.1 El - 29.0 _ _ _ EI - 28.8
M
o
GAS BAFFLE -
EXISTING
1,500 GALLON
SEPTIC TANK
L) ALL WORK SHALL CONFORM TO THE STATE ENVIRONMENTAL CODE, TITLE 5 (310 CMR 15.000
STANDARD'REOUIREMENTS FOR THE SITING, CONSTRUCTION, INSPECTION, UPGRADE, AND
EXPANSION OF ON-SITE SEWAGE TREATMENT AND DISPOSAL SYSTEMS AND FOR THE TRANSPORT
AND DISPOSAL OF SEPTAGE, AND THE LOCAL BOARD OF HEALTH REGULATIONS.
2.) ANY SEPTIC SYSTEM COMPONENT INSTALLED IN A LOCATION WHERE THERE IS POTENTIAL FOR
VEHICLES OR HEAVY EQUIPMENT TO PASS OVER 1T SHALL BE DESIGNED TO WITHSTAND AN H-20
LOADING IF UNDER AN IMPERVIOUS SURFACE, SYSTEM 94ALL BE VENTED TO THE ATMOSPHERE.
3J TO MINIMIZE UNEVEN SETTLING, SEPTIC TANKS AND D -BOX SHALL BE INSTALLED ON A STABLE
MECHANICALLv-COMPACTED BASE ON SIX INCHES OF CRUSHED STONE.
4.) COVERS OVER THE INLET AND OUTLET TEES OF THE SEPTIC TANK, THE DISTRIBUTION BOX, AND
VERTICALLY TO THE BOTTOM OF THE SOIL ABSORPTION SYSTEM PATH A CAP, TIED WITH MAGNETIC
MARKING TAPE, ACCESSIBLE TO WITHIN Y OF FINAL GRADE.
5.) PIPING SHALL CONSIST OF 4" SCHEDULE 40 PVC OR EQUIVALENT. RPE SHALL BE LAID ON A
MINIMUM CONTINUOUS GRADE OF NOT LESS THAN 2% FROM THE BUILDING TO THE SEPTIC TANK,
AND NOT LESS THAN IX OTHERWISE.
6.) DISTRIBUTION LINES FON THE SOIL ABSORPTION SYSTEM SHALL BE 4" DIAMETER SCHEDULE 40
PVC (OR EQUIVALENT) LAID AT 0.015 FT/FT. UNLESS OTHERWISE NOTED. LINES SHALL BE CAPPED
AT END OR AS. NOTED.
7.) LINES FROM THE DISTRIBUTION BOX TO BE LEVEL FOR THE FIRST TWO (2) FEET BEFORE
PITCHING TO THE SOK. ABSORPTION SYSTEM. DISTRIBUTION BOX SHALL BE WATER TESTED TO
ASSURE EVEN DISTRIBUTION.
8.) GROUT TO BE USED AT ALL POINTS WHERE PIPES ENTER OR LEAVE ALL CONCRETE STRUCTURES
IN ORDER TO PROVIDE A WATERTIGHT SEAL.
I HEAVY EQUIPMENT SHALL NOT BE ALLOWED TO OPERATE OVER THE LIMITS OF THE SEWAGE
DISPOSAL FIELD DURING THE COURSE OF CONSTRUCTION CF THE SYSTEM.
10.) IN ACCORDANCE VATH 310 CMR 15.221, ALL SYSTEM COMPONENTS SHALL BE MARKED WITH
MAGNETIC MARKING TAPE.
11.) THERE ARE NO KNOWN WELLS OR WETLANDS WITHIN 150' OF THE PROPOSED SOIL ABSORPTION SYSTEM.
12.) FROM THE DATE OF THE INSTALLATION OF THE SOL ABSORPTION SYSTEM UNTIL RECEIPT OF
THE CERTIFICATE OF COMPLIANCE, THE PERIMETER SHALL BE STAKED AND FLAGGED TO PREVENT
USE OF THE AREA THAT MAY CAUSE DAMAGE TO THE SYSTEM.
13.) THE DESIGNER WILL NOT BE RESPONSIBLE FOR THE SYSTEM AS DESIGNED UNLESS
CONSTRUCTED AS SHOWN ON PLAN. ANY CHANGES SHALL BE APPROVED IN WRITING BY THE ENGINEER.
14.) THE BOARD OF HEALTH REQUIRES INSPECTION OF ALL CONSTRUCTION BY AN AGENT OF THE
BOARD OF HEALTH AND THE DESIGNER: THE DESIGNER. SHALL CERTIFY I _WRITING THAT THE
SEWAGE DISPOSAL SYSTEM WAS INSTALLED IN ACCORDANCE WITH THE TERMS OF THE PERMIT
AND THE APPROVED PLANS. 48 HOURS' ADVANCE NOTICE IS REQUESTED.
15.) LOCATION OF UTILITIES IS APPROXIMATE AND CONTRACTOR SHALL' BE RESPONSIBLE FOR
DETERMINING THE LOCATION OF ALL UNDERGROUND AND -OVERHEAD UTILITIES PRIOR TO
COMMENCEMENT OF ANY WORK. THIS INCLUDES, BUT IS NOT LIMITED TO, REQUESTS TO DIGSAFE,
ANY PRIVATE UTILITY COMPANIES, AND THE 'LOCAL WATER DEPARTMENT.
16.) CONTRACTOR SHALL VERIFY THAT NA WASTEUNES ARE CONNECTED BY WATER TESTING
WA INTHE DWELLING PRIOR TO INSTALLATION OF ANY SEPTIC COMPONENTS.
17.) CONTRACTOR SHALL. VERIFY EXISTING INVERT ELEVATIONS PRIOR 10 INSTALLATION OF ANY
SEPTIC SYSTEM COMPONENTS.
1e.) TEST HOLES COMPLETED PER STATE ENVIRONMENTAL CODE: TITLE S. SOILS CAN BE
VARIABLE AND TEST HOLE DATA IS NO GUARANTEE OF SOIL CONDITIONS IN OTHER AREAS. IF
SOLS DIFFER FROM THOSE SHOWN IN THE SOLS LOGS. DESIGN ENGINEER IS TO INSPECT THE
SOILS PRIOR TO PROCEEDING WITH INSTALLATION OF ANY SEPTIC COMPONENTS.
19.) EXISTING SEPTIC COMPONENTS TO BE LOCATED, PUMPED DRY, FILLED WITH CLEAN SAND AND
ABANDONED IN PLACE ON REMOVED AS REQUIRED. AREA TO BE COMPACTED TO MINIMIZE SETTLING
1�9�
1,500 GALLON
SEPTIC TANK
FLOW PROFILE
NOT TO SCALE
Test Hole 1 (EL=29.11)
by:
Depth
Elev.
Layer
Soil Class
Soil Color
0-14"
27.9
A
Loamy Sand
10YR3/1
14"-32"
26.4
B
Loomy Sand
TOYR5/6
32"-71"
23.2
CI
Medium to
Coarse Sond
t0YR6/3
71"-104"
20.4
C2
Medium to Fine Fine Sond
104"-130"
18.3
C3
Medium to
Fine Sand
t0YR7/2
DATE OF TESTING: 07/11/1998
PERFORMED BY: HUNTER ENGINEERING ASSOC,
WITNESS: COLLEEN PELLY, AGENT, YARMOUTH HEALTH
PERCOLATION RATE HOLE: <2MIN/INCH 043"
NO GROUNDWATER ENCOUNTERED
NO MOTTLING ENCOUNTERED
NOTE:
SOILS AND DEPTH TO WATER TO BE VERIFIED
BY DESIGN ENGINEER UPON SEPTIC INSTALLATION
25.8
GEOTEXTILE
FABlRIC
f
..i
OFS
r
IX,!
1 :" 1 �• �•�����
233 CONCRETE LEACH CHAMBERS WITH 4' OF
1e't L STONE ON ENDS AND 4' ON SIDES
LEACH CHAMBERS 5.0'
ENO NEW)
EL=18.3 Bottom Test Hole 1
SYSTEM DESIGN CALCULATIONS
SEWAGE DESIGN FLOW: EXISTING 4 BEDROOM DWELLING ® 110 GPO/BEDROOM = 440 GPD
PROPOSED ONE BEDROOM DWELLING 0 110 GPO/BEDROOM - 110 GPD
(MINIMUM DESIGN REQUIRED 550 GPD)
SEWAGE DESIGN FLOW PROVIDED: FIVE (5) 500 GALLON CHAMBERS
WITH 4' STONE ON THE ENDS AND 4' STONE ON THE SIDES
Vt = [(50.5 x 12.83) + 2(50.5 + 12.83) (2) x .74 = 666 GPD PROVIDED
666 GPD PROVIDED > 550 GPD REQUIRED
SEPTIC TANK CAPACITY REQUIRED: 550 GPD X 200 - 1100 (MINIMUM)
SEPTIC TANK CAPACITY PROVIDED: 1,500 GALLON SEPTIC TANK (EXISTING)
SEPTIC TANK CAPACITY PROVIDED: 1,500 GALLON SEPTIC TANK (PROPOSED) ,1N rVA
A GARBAGE DISPOSAL IS NOT PERMITTED WITH THIS DESIGN FLOW _�N4%-'\�
NOTE:
EXISTING HOUSE AND PROPOSED ONE BEDROOM
FLOOR PLANS TO BE SUBMITTED WITH PERMIT.
Site Plan. for
-tomer Avenue
ored for:
P. Demetriou,
8 Homer Avenue
South Yarmouth, MA
Proposed Building �/(/yam
South Yarmouth, MA
Prepared
by:
All Cape Septic
and
Tr. 618 Route
28
West Yarmouth,
MA
(508) 771-4200
December 28, 2021
o l I c ap a sep tic Ogm oil. c om
Survey
02673
Sheet 2 of 2