Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: AM 7.5 LOT 2 `? Date of Subdivision Approval Street 7D/ (i SrfC�`kn Zone of Contribution: In Out Village t�yt�i�, . Gy7 Commercial Residential Owner: 77‹* Installers . kriE9? f3L b9 7c- Builder: X"' Engineer 1 .7� (Q1/ -r N/A YES NC 1. Required number of copies received. 2. Date of soils exam and percolation test not older than 2 years. 3. 4 feet of naturally occurring pe.rvious material. above water table(new construction) 4. Foundation 2 feet above high.point of fronting,road for new construction. 5. Water availability letter from Water Department for new construction. 6. Benchmark indicated and shown-NGVD if near wetlands. 7. Building sewer does not exit center of house. 8. Septic tank a minimum of 10 feet from house and deck. 9. Leachinu a minimum of 20 feet from house and 10 feet from deck. 10. Leaching a minimum of 100 feet from wetlands. 11. Leaching a minimum of 150 feet from drinking wells/25 feetfrom irrigation wells. 12. System meets all other setbackrequirements_ 13. Uses adjustment for maximum hieh anoundwater.. 14. Leachirm - f- -t above ad'ust• • water table Or bo . if s _ test • 15. System not in top or subsoil or 5 foot removal. 16. Proposed contours are suitable. 17. System meets slope requirements - min 1/8", 1/4" preferred. 18. System meets breakout requirements- peastone elevation carried out 15 feet minimum. 19. Specified tee sizes are proper. gas baffle on outlet tee. 20. Sewage flow under 10.000 gpd for parcel. 21. No garbage disposal_ 22. System adequately sized for its intended use. 23. Minimum 6" stone or mechanically compacted below the tank and d-box. 24. Manhole covers within 6" of grade - septic tank and pump chamber. 25. Electrical permit for pump chamber. 26. Pump system- 2" line, weep hole,check valve. sanitary in d-box. alarm on separate circuit. 27. Septic tank and pump chamber to be Factory waterproofed. 28. Vent provided if leaching below 3 feet or under driveway or parking. 29. Engineer to inspect and certify : a. clay removal b. wall construction schedule c. commercial system 10,3111ineer and Land Surveyor stamp and signature, 31. H2O loading when system subject to vehicular traffic. 32. Title V application and fee signed by a licensed installer. 33. Foundation footing 2 feet above adjusted water table. 34. Lot subdivided prior to July 31. 1986 - Nitrate Loading 35. Subdivided prior Lo April 7. 1989 - Phosphorus Zone 300'. Plan reviewed by: