Loading...
HomeMy WebLinkAboutReview Checklist Avi4 Gt, n TOWN OF YARMOUTH CA'rea SEWAGE PLAN REVIEW CHECKLIST k 1 Loca •on: A.M. Lot Zone of Contribution: In Out / Acreage Commercia Residential: Y---- Street: -rat_ L-1,._ Village: Floor Plaeraim„Pill" #Bedrooms: 3 9 -R 6 wA -- Owner: Installer: Address: Phone: Phone: II Builder: Engineer: V C Address: Phone: �� Phone: N/A YES NO 1. Required#of copies received ✓ 2. Date of soils exam and percolation test not older than 2 years V 3. 4-5 ft of naturally occurring pervious material, above water table V 4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: ✓ ® ater line 10 ft from septic components Var.: K 6. Benchmark indicated and shown—NGVD if near wetlands ✓ Septic tank minimum 10 ft from foundation, deck Var.: �CtS41/ 4) � Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: x 9 Leaching minimum 100 ft from wetlands Var.: X 1 . Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: %/ Tank/leaching minimum 10 ft from property line Var.: d/VSystem meets all other setback requirements Var.: X. Uses adjustment for maximum high groundwater Var.: V14 eaching set 4-5 ft above adj. water or bottom of test hole Var.: System not in top or subsoil(A,B horizons)or 5' removal r�N,r� �/AiVI etkeL X_ Proposed contours are suitable 17. System meets slope requirements—min. 1/8", '''4"preferred ,/ 18. System meets breakout requirements PVC liner: X Wall: 19. Specified tee sizes are proper, gas baffle on outlet tee 20. Sewage is under 10,000 gpd for parcel ✓ 21.No garbage disposal t/' 22. System adequately sized for its intended use v/ 23. Minimum 6"stone or compacted below tank and dbox 24.Manhole covers within 6"of grade,pump chamber cover to grade 5. Inspection port on plastic chambers/leach field Electrical permit for pump chamber/Separate meter for duplexes V 27. Pump system-2"line,weep hole,check valve, tee in dbox,pump size t/ 28. Septic tank/pump chamber to be factory waterproofed V- 29. Vent provided if leaching below 3 feet,under driveway/parking 30. Buoyancy calculations for tank/pump chamber 31. Engineer to inspect and certify - soils: wall: commercial: t . 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33. H-20 loading is subject to vehicular traffic, groundwater ✓ 34. Title V Application and permit fee, installer signature 35. Foundation footing min. 2 feet above adjusted ground water for new house i/. - 36. Deed Restriction required max. #bedrooms: max. flow: gpd V- 37. / 37. Check area lots for groundwater/Label grou el a er ' Assessor's Map ✓ Plan reviewed by: 6,03 03