Loading...
HomeMy WebLinkAboutCorrespondence 4/14/2022 Grant, Kelly From:eejenglish@aol.com Sent:Thursday, April 14, 2022 3:51 PM To:Grant, Kelly Subject:Order of Conditions SE83-2199 Attachments:Salt Box Association 2019 recorded OOC SE83-2199.tif; ACOE Salt Box Assoc. - PCN 9-28-20.pdf Hello Kelly: The Salt Box Association plans beach nourishment around May 20 before Memorial Day. Here is the Order of Conditions SE83-2199. Also attached is ACOE NAE-2007-3427. The dredging work was completed by LEMCO in December 2021. We have permission to maintain MHW level 15' from seawall when renourishment required. (See graphic on PP.s 6-7 in ACOE document) Child's will perform the work as they have in the past. Should need a foot to 18" of approved Cape Cod sand to renourish. I have checked with Cape Cod sand and they have sand from the identical source approved the last time we renourished in June 2020. Because the dredging moved approximately 25 cubic yards, I'm estimating only 50 to 75 yards may be necessary to meet specified contour. Our consultant, Mark Burgess can be available for any technical questions. Thank you. Ed English President, SBA 201-669-0216 1