HomeMy WebLinkAboutDYIMS PE Site report 20220407 Architect: Perkins Eastman DPC Distribution: Commodore PMA Consultants Sandra Cashen Mark Grylls File ARCHITECT’S SITE OBSERVATION REPORT DATE OF VISIT: 04/07/2022 PROJECT: Dennis Yarmouth Intermediate Middle School 286 Station Avenue South Yarmouth, MA 02664 DATE OF ISSUE: 04/19/2022 PROJECT NO: 71011 WEATHER CONDITIONS: sunny, high 50s ARCHITECT: Perkins Eastman, DPC 20 Ashburton Street 8th floor Boston, MA The purpose of the Site Observation Report is to record general observations of the work in progress at the time of the Architect’s visit. WORK IN PROGRESS: 1) Interior partition framing, drywall 2) Painting 3) MEP rough-in 4) Fire protection 5) Misc. metals work (seismic clips) 6) Elevator installation 7) K 13 installation at open ceiling areas 8) Geo foam installation at B stair 9) AVB installation and prep for window installation; stripping in of windows and Curtain wall 10) Curtain wall installation 11) GFRC panel girt installation and insulation 12) Brick masonry at Area D 13) CMU at gymnasium 14) Prep for gym AVB installation at GYM 15) Exterior framing and sheathing at A 16) roofing 17) Site work at the upper sports field FIELD OBSERVATIONS: PE visited the site on Thursday 04-07, to review ongoing progress. 1. Sheetrock installation is ongoing at C, and Prime painting is ongoing for walls in Area D 2. Interior partition framing is ongoing at both A and B; 3. MEP rough-in is ongoing at Areas A and B. 4. The Colony crew is continuing to do detailing work at Area C (soffits and portals etc.) 5. Geofoam installation at Area B stair is substantially complete and the concrete on the second tier is poured. 6. Sprinkler piping installation by Rustic is ongoing. 7. K-13 installation now complete in B and is moving to the deck area of the cafetorium in A 8. Elevator installation is ongoing in area B 9. United Steel is in the process of installing seismic clips for the gym CMU walls, ahead of Beacon’s AVB (see photo) 10. Moving to exterior items, Brick masonry work is ongoing at Area D, working its way around the north face and now commencing on the east face of the building. 11. CMU work at the gym has shifted to the lower south gym area; beacon has been working on prepping the CMU envelope for application of spray applied AVB. 12. Lambrian (CW and window) is working on CW at the Area B-C “link.” 13. Two sun shades for classrooms have been installed (mocked up) at Area D; PE approved the installation REPORT BY: ABH Page 2 of 3 14. The Lymo crew is installing clips and mineral wool for the GFRC panels at the south side of Area C, at the B-C courtyard (see photo on page 3). 15. The beacon crew is working on sealing the gaps at the gym walls in prep for upcoming liquid applied AVB installation. 16. Roofing at the gym is mostly complete; Stanley’s crew is working on the metal flashing/coping details. 17. At the time of observation Marguerite was forming EOS for an upcoming pour at the loading dock (Area A). 18. Site progress: RBO is prepping the subgrade for the athletic fields and prepping for the installation of the retaining wall at the north side of Field B. DISCREPANCIES, SPECIAL INSTRUCTIONS Note: see attached RJK report for additional exterior envelope items 4071. Loading dock slab pour. PE reviewed details of the loading dock slab pour including sequencing. Prior Items 3311. (from 03 31 site report) Missing expansion joint. Update: Colony has addressed the missing expansion joint as requested on 3-31 (SEE PHOTO BELOW), but PE additionally requested that Colony tweak the location of the jog in the wall finish at the gym corner so that it coincides with the edge of the interior EJ, and to coordinate radiant panel size with Arden—this item is being closed. 3173. (from 03 17 site report) Curtain wall at gym corner. Still open. 31002. (from 03 10 site report) Exposed HSS support brackets in gym.. still open 22402. (from 03 03 site report) Caulk color Update: Beacon has mocked up two color options for control joints at brick—neither one is a good option; PE requested a special color (beige). 11301. (From 01-13 site report): Guard rail welds at D & C stairs - United still needs to grind welds for guards at academic stairs (see photo). still open Attachments: · RJK site report for 04 07 22 · RJK open items log SITE PHOTOS EXP JOINT CONDITION – J.7/B24 PREP FOR AVB AT GYM N. - AREA B UPPER CAF. FRAMING – AREA A REPORT BY: ABH Page 3 of 3 SEISMIC CLIPS AT GYMNASIUM NORTH WALL (AREA B) PANEL GIRT INSTALLATION AT B-C COURTYARD SLEEVES AT CORRIDOR PLENUM – AREA D CROSS CORRIDOR LOOKING SOUTH FIELD REPORT RJK discussed the issues with PE, PMA, CB and Beacon on-site. Work Observed • Air and Vapor Barrier (AVB) Installation • Window Installation • Roofing Installation Observations • At Part A and Part B, GCP Perm-A-Barrier Aluminum AVB was installed by Beacon Waterproofing and Restoration Inc. (BWR). Primer/adhesive was applied to the DensGlass Sheathing prior to RJK observations. The membrane was installed in a water shedding fashion, with a minimum 2 inch side lap and 10 inch lap around outside corners, as required. (Figure 1) • At Part C, window flanges are stripped in utilizing self-adhered aluminum flashing in a water shedding fashion. (Figure 2) • At Part C, bent plates were installed below windows, set in GCP Perm-A-Barrier S100 Sealant and fastened utilizing screws. The top of the bent plate is stripped in utilizing GCP Perm-A-Barrier Aluminum Wall Membrane and the patch sealed at the wall with GCP Perm-A-Barrier S100 Sealant. (Figures 3, 4) • Kawneer 1600IR curtain wall systems were installed at Part D and Part C, fastened to the rough opening through F-anchors and T-anchors. (Figures 5 - 7) • Elbex HS-222 Silicone Transition Sheet was installed at curtain wall frames, lapping into the glazing pocket and onto the vertical AVB membrane and installed in water shedding fashion between strips at the head, jambs and sill. GCP Perm-A-Barrier S100 Sealant is applied to the edges of the membrane at the wall and glazing pocket. (Figure 8) • Hohmann & Bernard Thermal 2-Seal wing nut masonry anchors are installed through 6-inch John Mansville MinWool-1200. (Figure 9) Project: Q504 - Mattacheese, Dennis-Yarmouth Intermediate Middle School Report Number: 6 Property Address: 276 Station Avenue, South Yarmouth, MA 02664 Client: Perkins Eastman Date of Site Visit: Thursday, April 7, 2022 Report Date: Friday, April 8, 2022 Weather: Sunny 57°F, 5 mph Winds Purpose of Visit: Observe Building Enclosure Construction On-Site During Visit: Michael Groome - R. J. Kenney Associates, Inc. (RJK) Andrew Hazelton - Perkins Eastman (PE) Jon Pope - PMA Consultants (PMA) Nick Hull - PMA Paul Genereux - Commodore Builders (CB) Ken - Beacon Waterproofing and Restoration Inc (Beacon) Report By: Michael Groome Report Attachments: Detailed Photographs Q504 - Mattacheese, Dennis-Yarmouth Intermediate Middle School Report Number 6 4/8/2022 Report Narrative G:\RJK\WORD\31646 Q504 Mattacheese DYIMS Yarmouth FR6 4-7-22.docx Page 2 of 12 • Installed brick was being cleaned utilizing an unidentified cleaner, a brush, and a 5-in-1 tool. (Figure 10) • Knight MFI ThermaBracket S-Series wall ties are installed and are fastened utilizing screws and S-rails fastened vertically between the ties. Insulation is set between the ties and held in place by friction and the rails. (Figure 11) • Horizontal galvanized hat channel is installed, fastened to vertical Knight S-Rails. (Figure 12) • GreenGirt is installed in horizontal runs at Part D, north elevation, west bump out fastened utilizing screws and set in sealant, as required. (Figure 13) Discussions 6.1 Voids in Dampproofing From Damage - Part D and Part C - The applied dampproofing is being damaged by construction activities. The damaged areas should be cleaned and repaired as required. (Figure 14, 15) 6.2 AVB Damage - Part D and Part C - Multiple areas of damage are observed and marked in red lumber crayon to be repaired as required. (Figure 16) 6.3 Roof Debris - Typical - Throughout the installed roofing areas construction materials and debris are on the roofing membrane which can cause damage. Remove materials and debris to protect the membrane and check for any damage due to the materials. (Figure 17) 6.4 Roof Ponding - Part C to Part B - An area of ponding is observed and should be monitored for drying within the manufacturer’s required timeline and repaired if the is limit exceeded. (Figures 18, 19) 6.5 PVC In Contact with Asphalt - Part B Penthouse - The AVB is lapped onto the PVC roofing membrane. The asphalt of the AVB is not compatible with the PVC membrane and should not be in contact. The asphalt should be removed, and the membrane cleaned. If staining remains on the membrane, then the membrane is to be cut out and replaced. (Figure 20) END OF REPORT RJK has no contractual responsibility in the design or actual construction of the project and is acting solely in a consultant and/or in an advisory capacity to the Client. Any and all modifications, changes, recommendations, suggestions, etc., relating to the design and/or construction, should be forwarded, reviewed, and approved by the designer of record prior to implementation. RJK reserves the right to change or amend this report as new information becomes available. Q504 - Mattacheese, Dennis-Yarmouth Intermediate Middle School Report Number 6 4/8/2022 Appendix A G:\RJK\WORD\31646 Q504 Mattacheese DYIMS Yarmouth FR6 4-7-22.docx Page 3 of 12 Callouts: 1. Primer Comments: 0407 004 R. J. Kenney Associates, Inc. Figure 1 ‐ AVB Installation at Part B Callouts: Comments: 0407 037 R. J. Kenney Associates, Inc. Figure 2 ‐ Window Flange Strip-In 1 Q504 - Mattacheese, Dennis-Yarmouth Intermediate Middle School Report Number 6 4/8/2022 Appendix A G:\RJK\WORD\31646 Q504 Mattacheese DYIMS Yarmouth FR6 4-7-22.docx Page 4 of 12 Callouts: 1. Bent Plate 2. Wet Set Fasteners Comments: 0407 013 R. J. Kenney Associates, Inc. Figure 3 ‐ Bent Plate at Window Sill Callouts: 1. Bent Plate 2. GCP Perm-A-Barrier Aluminum Wall Membrane 3. GCP Perm-A-Barrier S100 Sealant Comments: 0407 018 R. J. Kenney Associates, Inc. Figure 4 ‐ AVB on Bent Plate 1 1 2 3 2 Q504 - Mattacheese, Dennis-Yarmouth Intermediate Middle School Report Number 6 4/8/2022 Appendix A G:\RJK\WORD\31646 Q504 Mattacheese DYIMS Yarmouth FR6 4-7-22.docx Page 5 of 12 Callouts: Comments: 0407 069 R. J. Kenney Associates, Inc. Figure 5 ‐ Curtain Wall System Callouts: 1. F-Anchor Comments: 0407 204 R. J. Kenney Associates, Inc. Figure 6 ‐ F-Anchor at Curtain Wall 1 Q504 - Mattacheese, Dennis-Yarmouth Intermediate Middle School Report Number 6 4/8/2022 Appendix A G:\RJK\WORD\31646 Q504 Mattacheese DYIMS Yarmouth FR6 4-7-22.docx Page 6 of 12 Callouts: 1. T-Anchor Comments: 0407 202 R. J. Kenney Associates, Inc. Figure 7 ‐ T-Anchor at Curtain Wall Callouts: 1. Elbex HS-222 Silicone Transition Sheet 2. GCP Perm-A-Barrier S100 Sealant Comments: 0407 072 R. J. Kenney Associates, Inc. Figure 8 ‐ Silicone Sheet at Curtain Wall 1 2 2 1 Q504 - Mattacheese, Dennis-Yarmouth Intermediate Middle School Report Number 6 4/8/2022 Appendix A G:\RJK\WORD\31646 Q504 Mattacheese DYIMS Yarmouth FR6 4-7-22.docx Page 7 of 12 Callouts: 1. Hohmann & Bernard Thermal 2-Seal Wing Nut Masonry Anchors Comments: 0407 052 R. J. Kenney Associates, Inc. Figure 9 ‐ Brick Ties and Wall Insulation Callouts: Comments: 0407 066 R. J. Kenney Associates, Inc. Figure 10 ‐ Brick Cleaning Q504 - Mattacheese, Dennis-Yarmouth Intermediate Middle School Report Number 6 4/8/2022 Appendix A G:\RJK\WORD\31646 Q504 Mattacheese DYIMS Yarmouth FR6 4-7-22.docx Page 8 of 12 Callouts: 1. Knight MFI ThermaBracket S-Series Wall Ties Comments: 0407 032 R. J. Kenney Associates, Inc. Figure 11 ‐ Wall Ties Callouts: 1. Knight S-Rails 2. Galvanized Hat Channel Comments: 0407 036 R. J. Kenney Associates, Inc. Figure 12 ‐ Hat Channel Over S-Rails 1 1 2 Q504 - Mattacheese, Dennis-Yarmouth Intermediate Middle School Report Number 6 4/8/2022 Appendix A G:\RJK\WORD\31646 Q504 Mattacheese DYIMS Yarmouth FR6 4-7-22.docx Page 9 of 12 Callouts: 1. GreenGirt Comments: 0407 048 R. J. Kenney Associates, Inc. Figure 13 ‐ GreenGirt Callouts: 1. Voids in Dampproofing Coverage from Damage Comments: 0407 109 R. J. Kenney Associates, Inc. Figure 14 ‐ Dampproofing Voids from Damage 1 1 Q504 - Mattacheese, Dennis-Yarmouth Intermediate Middle School Report Number 6 4/8/2022 Appendix A G:\RJK\WORD\31646 Q504 Mattacheese DYIMS Yarmouth FR6 4-7-22.docx Page 10 of 12 Callouts: 1. Voids in Dampproofing Coverage from Damage Comments: 0407 112 R. J. Kenney Associates, Inc. Figure 15 ‐ Dampproofing Voids from Damage Callouts: 1. Damage Comments: 0407 045 R. J. Kenney Associates, Inc. Figure 16 ‐ AVB Damage 1 1 Q504 - Mattacheese, Dennis-Yarmouth Intermediate Middle School Report Number 6 4/8/2022 Appendix A G:\RJK\WORD\31646 Q504 Mattacheese DYIMS Yarmouth FR6 4-7-22.docx Page 11 of 12 Callouts: 1. Metal Pipe Comments: 0407 192 R. J. Kenney Associates, Inc. Figure 17 ‐ Roof Debris and Construction Materials Callouts: 1. Ponding Water Comments: 0407 161 R. J. Kenney Associates, Inc. Figure 18 ‐ Ponding Water at Northeast Part B 01 1 1 Q504 - Mattacheese, Dennis-Yarmouth Intermediate Middle School Report Number 6 4/8/2022 Appendix A G:\RJK\WORD\31646 Q504 Mattacheese DYIMS Yarmouth FR6 4-7-22.docx Page 12 of 12 Callouts: 1. Ponding Water Comments: 0407 162 R. J. Kenney Associates, Inc. Figure 19 ‐ Ponding Water at Northeast Part B 02 Callouts: 1. AVB with Asphaltic Adhesive 2. PVC Membrane Comments: 0407 154 R. J. Kenney Associates, Inc. Figure 20 ‐ PVC In Contact with Asphalt 1 1 2 Building Envelope Field Report Tracking Log Q504 - Mattacheese DYMIS Yarmouth Tracking Log 4/7/2022 Item #Issue Location Contractors Response Owner's Project Rep RJK Comments Status 1.1 Open Seam Part D Roof Concrete Slab that Intesects Grid Lines D21, and B.5 Open 1.2 Uncovered Polyisocyanurate Insulation Part C and Part D Roofs Open 1.3 Open Membrane at Penetration Part D Roof, East Connection to Part C, Grid Lines C115 and D.1 12/15/21: Commodore sent photos depicting sealing of membrane at penetration. Closed 2.1 Rough Opening Detailing Part D North and South Elevations 12/23/21: Per email from GCP rep Mark Kennedy the on-site condition will be sealed and acceptable for the manufacturer. Closed 2.2 Insulation Offset Part D Roof Open 2.3 Wetted Polyisocyanurate Insulation Part D Roof Open 2.4 Upside Down Insulation Part D Roof Open 3.1 Voids/Fish Mouth in Laps Part B 01/06/22: Repairs observed during site visit Closed 3.2 Voids in Penetration Detailing Part B 01/06/22: Repairs observed during site visit Closed FR-1, 12/15/2021 FR-3, 12/28/2021 FR-2, 12/22/2021 G:\RJK\WORD\31647 Q504 Mattacheese DYIMS Yarmouth FR Tracking Log 1 of 3 Building Envelope Field Report Tracking Log Q504 - Mattacheese DYMIS Yarmouth Tracking Log 4/7/2022 Item #Issue Location Contractors Response Owner's Project Rep RJK Comments Status 3.3 Tape Unadhered to Column Footing Part B 01/06/22: Repairs observed during site visit.Closed 3.4 Wet Polyisocyanurate Insulation and Cover Board Is Installed Part C Open 3.5 Incomplete Night Tie-In Part C Open 4.1 Unadhered/Missing Stego Tape Part B Open 4.2 Knife Plates in Rough Opening Part D and Part C Open 4.3 Interior Air Barrier Seal at Windows Part D Open 4.4 Window Fastening Part D Open 4.5 Wet Polyisocyanurate Insulation and Cover Board Is Installed Part C and Part D Roofs Open 4.6 Pitch Pocket Detail Part C Open 4.7 Uncut Clamping Rings Part C 04/07/22: Multiple clamping rings still left uncut at Part C.Open 4.8 No Clamping Ring Part C 04/07/22: A clamping ring was installed at the corner penetration but two penetrations were observed between Part C and Part B without clamipng rings. Open 5.1 Equipment and Debris on Roof Membrane Part A Open FR-4, 1/6/2022 FR-5, 3/21/2022 G:\RJK\WORD\31647 Q504 Mattacheese DYIMS Yarmouth FR Tracking Log 2 of 3 Building Envelope Field Report Tracking Log Q504 - Mattacheese DYMIS Yarmouth Tracking Log 4/7/2022 Item #Issue Location Contractors Response Owner's Project Rep RJK Comments Status 5.2 Damage to Below Slab Vapor Barrier Part A On Tuesday, March 22, 2022, photographs of the repairs were sent by Ryan DiRico (CB)Closed 5.3 Undetailed Penetration in Below Slab Vapor Barrier Part A On Tuesday, March 22, 2022, photographs of the repairs were sent by Ryan DiRico (CB)Closed 5.4 Voids in Below Slab Vapor Barrier Details Part A On Tuesday, March 22, 2022, photographs of the repairs were sent by Ryan DiRico (CB)Closed 5.5 Air Barrier Holes Part D North Elevation On Tuesday, March 22, 2022, photographs of the repairs were sent by Ryan DiRico (CB)Closed 6.1 Voids in Damproofing From Damage Part D and Part C Open 6.2 AVB Damage Part D and Part C Open 6.3 Roof Debris Typical Open 6.4 Roof Ponding Part C to Part B Open 6.5 PVC In Contact with Asphalt Part B Penthouse Open FR-6, 4/7/2022 G:\RJK\WORD\31647 Q504 Mattacheese DYIMS Yarmouth FR Tracking Log 3 of 3