Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. ( 7 S Lot 4 2- Zone of Contribution: In Out_ Acreage Z©a oS"o E- Commercial: Residential: Street: r Cott bn uwoc1 Siren- / Village: V1 G r vn ur 1-. FR)►=t- Floor Plan: 0 0 #Bedrooms: /..--- Owner: /Owner: CSVl►.3A- SL1,A.ODD NE Installer: Ce_ 3c..- --p77 c sc.,,,--V'C &- Address: Phone: Phone: Builder: Engineer: ,S �h reg� Address: Phone: (i') -7-7 LR -09-Yil Phone: N./A YES NO 1.Required#of copies received V/ 2.Date of soils exam and percolation test not older than 2 years 3.4-5 ft of naturally occurring pervious material,above water table 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: N./ 5.Water line 10 ft from septic components Var.: ./ 6.Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation,deck Var.: _ / _ 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: ./- 9. /9. Leaching minimum 100 ft from wetlands Var.: ✓ 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: ✓ 11.Tank/leaching minimum 10 ft from property line Var.: ✓ 12. System meets all other setback requirements Var.: ✓ 13.Uses adjustment for maximum high groundwater Var.: / 14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.: ✓ 15. System not in top or subsoil(A,B horizons)or 5'removal ✓ 16.Proposed contours are suitable \/ 17. System meets slope requirements-min. 1/8", %"preferred ✓ 18. System meets breakout requirements PVC liner: Wall: Z 19. Specified tee sizes are proper, gas baffle on outlet tee 20. Sewage is under 10,000 gpd for parcel ✓ 21.No garbage disposal yi22. System adequately sized for its intended use 23.Minimum 6"stone or compacted below tank and dbox 24. Manhole covers within 6"of grade,pump chamber cover to grade � \ 25. Inspection port on plastic chambers/leach field ./- 26.Electrical permit for pump chamber/Separate meter for duplexes 27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size ,� 28. Septic tank/pump chamber to be factory waterproofed 29.Vent provided if leaching below 3 feet,under driveway/parking 30.Buoyancy calculations for tank/pump chamber ✓ 31.Engineer to inspect and certify soils: wall: commercial: / 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33.H-20 loading is subject to vehicular traffic,groundwater ✓ 34.Title V Application and permit fee,installer signature ) 35.Foundation footing min.2 feet above adjusted ground water for new house .7' ` / � 36.Deed Restriction required max. #bedrooms: max. flow: gpd 37.Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: `th n O.. �.(mauvr 6 03 03