Loading...
HomeMy WebLinkAboutEngineer PlanMYRTLE LANE LOCUS MAP SCQI2: IU TS // DRAINAGE �\` �/ "ENT ti 0 0 d 7 B.M. NAIL IN TREE EL. =37.19 (N. A. V. D. (9 8) \ EASE L-47.57' m I \\ R=30.00' O ----- a-90"50'55» I_ ------------ - 3----------'/ v\��\ gook, P 5 e: \P -Prop ' 105_ 42y ID. 20> 050 I ---- S.F. / CONCRETE / / p p,TIO GV / GAS ApPROX. O x POOL N Z� O �G7I / NO O 34.4x o EXIST \\G A� 1000 K SEPTIPTE 4 SEE NI x34.3 PLUMBING TO BE REROUTED \ �. 34.1 x / PROPOSED\\ , 34.5 Q0 N O N O C 11 cAp �t� PEPTIC IAN ',y,, CLEANS TREE AND 3, - AT GPIADEt_0- x34.9 / r / II p 0 % Q0 00 L ;=/,30.5 ' i /�/ 135.00' / S78°47'34W / r x34.9 n= LOCUS o NOTE: LOCATED UNDER THE POOL PATIO AND IS THEREFORE INACCESSIBLE. IN THE BASEMENT WILL NEED TO BE REROUTED FROM ITS EXISTING LOCATION AND ELEVATION NOTE: PLUMBING NOTE: THE SEPTIC TANK WILL BE ABANDONED ACCORDING TO TITLE 5 STANDARDS. THE PIT STRUCTURE IS LOCUS MAP SCQI2: IU TS // DRAINAGE �\` �/ "ENT ti 0 0 d 7 B.M. NAIL IN TREE EL. =37.19 (N. A. V. D. (9 8) \ EASE L-47.57' m I \\ R=30.00' O ----- a-90"50'55» I_ ------------ - 3----------'/ v\��\ gook, P 5 e: \P -Prop ' 105_ 42y ID. 20> 050 I ---- S.F. / CONCRETE / / p p,TIO GV / GAS ApPROX. O x POOL N Z� O �G7I / NO O 34.4x o EXIST \\G A� 1000 K SEPTIPTE 4 SEE NI x34.3 PLUMBING TO BE REROUTED \ �. 34.1 x / PROPOSED\\ , 34.5 Q0 N O N O C 11 cAp �t� PEPTIC IAN ',y,, CLEANS TREE AND 3, - AT GPIADEt_0- x34.9 / r / II p 0 % Q0 00 L ;=/,30.5 ' i /�/ 135.00' / S78°47'34W / r x34.9 n= LOCUS o NOTE: LOCATED UNDER THE POOL PATIO AND IS THEREFORE INACCESSIBLE. SPINK rna M D MD SURVEY FOR SEPTIC SYSTEM 10YR2/2 ^ 12"-24" UPGRADE PURPOSES ONLY. NOT m m 0 n TO BE USED FOR PROPOSED z MED./COARSE SAND z DESIGN STRUCTURES OR PROPERTY LINE Z 0 �'� nTERMINATION. K N DE F- 2.5'2.5' o 0 = MYRTLE LANE z < JOB NO: v # mO 31,50"STONE DESCRIPTION DRAWN m CG R ADD NOTES AND FLOOR PLAN Z JCS 2 f! 4/2/22 ADD NOTES AND NEW SAS SIZE TCR X LL r i 3 /12/22 ADD NOTES AND RESIZE SAS NEW FLOOR PLAN TCR JCS \� N79° 8'29"E // MAGNOLIA ROAD - 1014.57' / LOCUS MAP SCQI2: IU TS // DRAINAGE �\` �/ "ENT ti 0 0 d 7 B.M. NAIL IN TREE EL. =37.19 (N. A. V. D. (9 8) \ EASE L-47.57' m I \\ R=30.00' O ----- a-90"50'55» I_ ------------ - 3----------'/ v\��\ gook, P 5 e: \P -Prop ' 105_ 42y ID. 20> 050 I ---- S.F. / CONCRETE / / p p,TIO GV / GAS ApPROX. O x POOL N Z� O �G7I / NO O 34.4x o EXIST \\G A� 1000 K SEPTIPTE 4 SEE NI x34.3 PLUMBING TO BE REROUTED \ �. 34.1 x / PROPOSED\\ , 34.5 Q0 N O N O C 11 cAp �t� PEPTIC IAN ',y,, CLEANS TREE AND 3, - AT GPIADEt_0- x34.9 / r / II p 0 % Q0 00 L ;=/,30.5 ' i /�/ 135.00' / S78°47'34W / r x34.9 n= o� o r2 6" MI 1 SPINK rna M D MD SANDY LOAM 10YR2/2 ^ 12"-24" B m 10YR5/8 24"-129" z MED./COARSE SAND 31.67 DESIGN 59 CLAY STREET SEPTIC SYSTEM DESIGN PLAN MIDDLEBORO, MASSACHUSETTS rn 02346-1052 I N) 0 N N 774-766-0544 OR 774-678-9066 jspinkl®gmail.com -EXISTING TO � ROOT SYSTEM BE REMOVE L Mn mm von: 10, GINA SCIALDONE farcjuouf�rEp 2 COTTONWOOD STREET YARMOUTH PORT, MASSACHUSETTS 02675 = 35.24 TP N0. DTH -1 GRD. EL. 33.3± r,W FI . BELOW EL. 22.55 9" MIN, COVER 36" MAX. COVER H-10 LOADING (L' OPTIONAL KNOCKOUTS 0 LL i - - - - - MANHOLE COVER 24" DIAMETER MIN. (TYP.) 10.5' INSTALL A RISER FOR THE D -BOX COVER IS TO BE NOTE: ALL NEW CHAMBERS WILL BE H-10 LOADING. WITHIN 6" OF F.G. T FINISHED GRADE 27 MIN. SLOPE F.G. OVER THE SOIL ABSORPTION SYSTEM IS: EL. 33.3± i" MIN n n a e LEVEL \ L 4, \\ \ (SCH. 40) 44 NOTE: THE ACCESS PORT a SHALL BE WITHIN 6" OF SLOPE OF .02 °, 4" PVC PlPf 2.5' OF STONE 1 2.51 FINISH GRADE AFFLE a SOIL TEXTURE r2 6" MI 1 a (SCH. 40) 0"-12" 0/A SANDY LOAM 10YR2/2 ^ 12"-24" B SANDY LOAM 10YR5/8 24"-129" C MED./COARSE SAND 31.67 n N 31.3± 2.5'2.5' SCALE: 1" = 10' DESIGNED BY: TCR DRAWING NO.: JOB NO: CHECKED BY: JCS # a 31,50"STONE DESCRIPTION DRAWN CHK 13/21/22 R ADD NOTES AND FLOOR PLAN TCR JCS 2 ° A� 4/2/22 ADD NOTES AND NEW SAS SIZE TCR JCS Z5vp,.//���A �r}o�"WOO 3 /12/22 ADD NOTES AND RESIZE SAS NEW FLOOR PLAN TCR JCS �, pdvb 4000 DDI0J30.8 0 00 &1-1/2"' •OUTLETS 3o0 PLUGGED 26.6 1/2" oDOUBLE WASTONE ALL AROUND) DB3 D- BOX H-10 LOADING .DOUBLE WASHED STONE H-10 LOADING " CRUSHED STONE WITH B 30.5 4.83 WIDE 00 r 310 CMR 15.2323 - 500 GAL. CHAMBERS H-20 LOADING (SEE LAYOUT) = 9.8' NO GROUND WATER AT 22.55 3 - 500 GAL. CHAMBERS (SEE LAYOUT) H-20 LOADING H-10 LOADING - DB3 D- BOX ih 3 - 500 GAL. LEACHING GALLEYS O0 WITH 2.5' OF STONE ALL AROUND SEE PLAN VIEW FOR CHAMBER AND -:�-�ESTONE CONFIGURATION ACH CHAMBER IS 8.51E x 4.8'W x 2.75'H 1,83' L USE WIGGIN PRECAST COMPONENTS OR SIMILAR. ALL COMPONENTS WILL BE INSTALLED ON A STABLE COMPACTED BASE [SEE 310 CMR 15.228(1)] SOIL TEST DATA DEEP HOLE SOIL EVALUATOR: THOMAS ROUX APPROVING AUTHORITY: PHILIP RENAUD DATE PERFORMED: JANUARY 27, 2022 PERC TEST SOIL EVALUATOR: THOMAS ROUX APPROVING AUTHORITY: PHILIP RENAUD DATE PERFORMED: JANUARY 27 9099, SOIL EVALUATION PERFORMED BY: THOMAS ROUX SOIL EVALUATOR LICENSE NUMBER: SE2703 I CERTIFY THAT I HAVE TAKEN AND PASSED TWE SOIL EVALUATOR CLASS ON OCTOBER OF 20001 PT N0. A GRD. EL. 33.3± PERC DEPTH 46" START 15 MIN. PRESOAK: 2:12 P.M. END 15 MIN. PRESOAK: 2:27 P.M. TIME AT 12 IN.: TIME AT 9 IN.: TIME AT 6 IN.: PERC RATE OF <2 m.p.i. SURFACE DEPTH SOIL HORIZON SOIL TEXTURE SOIL COLOR SOIL MOTTLING ELEVATION 0"-12" 0/A SANDY LOAM 10YR2/2 12"-24" B SANDY LOAM 10YR5/8 24"-129" C MED./COARSE SAND 2.5Y6/4 DATE: JANUARY 23, 2022 SCALE: 1" = 10' DESIGNED BY: TCR DRAWING NO.: JOB NO: CHECKED BY: JCS # DATE ESTIMATED SEASONAL GROUND WATER ELEV. NO G.W. ENCOUNTERED AT (EL. = BELOW 22.55) THE ENTIRE SAS IS IN THE C -LAYER. THERE IS NO 5' SAND OVERDIG REQUIRED. KITCHEN LSP". BEDROOM 2 GARAGE I L HALL BEDROOM 1 �P LIVING ry �oeOQ ROOM \e FRONT DOOR FLOOR PLAN DRAWING IS NTS UTILITIES ARE PLOTTED FROM FIELD LOCATION AND I ANY RECORD INFORMATION AVAILABLE, AND SHOULD BE CONSIDERED APPROXIMATE. OTHER UTILITIES MAY - EXIST WHICH ARE NOT EVIDENT OR FOR WHICH RECORD INFORMATION WAS NOT AVAILABLE. CONTRACTORS (IN ACCORDANCE WITH MASS.G.L. CHAPTER 82 SECTION 40 AS AMENDED) MUST CONTACT ALL UTILITY COMPANIES1 BEFORE EXCAVATING AND DRILLING. ALSO, CALL "DIG -SAFE" AT 1(888)344-7233 €1(888)DIG-SAFEj. TYPE OF BUILDING: SINGLE FAMILY DWELLING TOTAL NUMBER OF EXISTING BEDROOMS: 2 (DESIGNED FOR 3) DESIGN FLOW: 110 GAL./BEDROOM/DAY o DESIGN FLOW: 3 BEDROOMS X 110 GAL./BEDROOM = 330 GAL./DAY N BOTTOM AREA: 30.5' X 9.8' = 298.9 S.F. SIDE AREA: 2[2'(30.5') + 2'(9.8)] = 161.2 S.F. TOTAL LEACHING AREA: 298.9 S.F. + 161.2 S.F. = 460.1 S.F. 460.1 S.F. x .74GPD/SF = 340.4 GPD SINCE 340.4 GPD > 330 GPD O.K. LEGEND 0000�o SW STONE WALL 9 CB CATCH BASIN TL TREE LINE / BM BENCH MARK Os SMH SEWER MANHOLE e UP UTILITY POLE OD DMH DRAIN MANHOLE Z% HYD FIRE HYDRANT ® W WELL G PRC PERC TEST EC EROSION CONTROL O DH DEEP HOLE PROPOSED CONTOUR 15-93 EXISTING SPOT ELEV. ---so--- EXISTING CONTOUR "99'9 PROPOSED SPOT ELEV. NOTES 1. ALL ELEVATIONS REFER TO THE NAIL SET IN TREE, SEE PLAN FOR BENCHMARK LOCATION. 2. ALL CONSTRUCTION SHALL CONFORM TO 310 CMR 15.00, TITLE V AND THE REGULATION OF THE TOWN'S BOARD OF HEALTH. 3. THIS PLAN DOES NOT WARRANT OR IMPLY ANY SUBSURFACE SOIL CONDITIONS OTHER THAN THOSE OBSERVED AT THE IMMEDIATE TEST PIT LOCATIONS. IF UNSUITABLE MATERIAL IS ENCOUNTERED, ALL CONSTRUCTION SHALL CEASE, AND THE DESIGN ENGINEER SHALL BE CONTACTED IMMEDIATELY. 4. ALL TANKS, D -BOXES, AND CHAMBERS SHALL BE SET LEVEL AND TRUE TO GRADED ON A MECHANICALLY COMPACTED STABLE BASE. 5. AREAS DISTURBED DURING CONSTRUCTION SHALL BE STABILIZED TO MINIMIZE EROSION, THE AREA OVER THE SYSTEM SHALL BE GRADED TO A MINIMUM OF 2% SLOPE TO PROVIDE POSITION SURFACE DRAINAGE. 6. THE ORIGINAL TOPOGRAPHIC SURVEY AND PLAN WERE DONE BY BORDERLAND ENGINEERING. 7. THIS PLAN SHALL NOT BE USED FOR THE REPRODUCTION OF PROPERTY LINES, NOR SHALL IT BE USED AS A MORTGAGE PLOT PLAN OR TITLE SURVEY. CONFORMANCE TO LOCAL BYLAWS SHALL BE DETERMINED BY THE OWNER PRIOR TO CONSTRUCTION. 8. THE OWNER IS RESPONSIBLE FOR THE DETERMINATION OF THE LOCATIONS OF ALL BURIED UTILITIES. 9. FOR PROPER PERFORMANCE, THE SEPTIC TANK SHOULD BE INSPECTED AT LEAST ONCE A YEAR AND PUMPED WHEN THE TOTAL DEPTH OF SOLIDS EXCEEDS 1/4 THE LIQUID DEPTH OF THE TANK. 10. ANY ALTERATIONS MUST BE REPORTED TO THE DESIGN ENGINEER PRIOR TO PROCEEDING WITH CONSTRUCTION, 11. THE SYSTEM MUST BE INSPECTED DURING CONSTRUCTION BY THE BOARD OF HEALTH OR ITS AGENT AND THE DESIGN ENGINEER AND BE CERTIFIED BY THE DESIGN ENGINEER. 12. A SPLASH PAD WILL BE USED ON THE GROUND WHERE THE WATER ENTERS THE 3 CHAMBERS. 13. ALL STONE USED IS TO BE DOUBLE WASHED STONE. 14. SEE 310 CMR 15.255 FOR FILL SPECIFICATIONS, SEE 310 CMR 15.247 FOR AGGREGATE SPECIFICATION. 15. ALL SYSTEM COMPONENTS SHALL BE MARKED WITH MAGNETIC MARKING TAPE OR A COMPARABLE MEANS IN ORDER TO LOCATE THEM ONCE BURIED. 16, THERE ARE NO WELLS WITHIN 100' OF THE SYSTEM. YSmoutthh Health Department 17. NO EFFLUENT FILTER WILL BE USED AT THE OUTLET END OF THE TANK. tii PRD 18. THE EXISTING SEPTIC TANK WILL NOT BE REUSED. THE EXISTING SYSTEM I3 m aIcv MUM e Cry 19. SLOPES MUST BE STABILIZED POST CONSTRUCTION. ` - 20. EXISTING 2 BEDROOM HOUSE WAS DESIGNED FOR 3 BEDROOMS. APR 15 2022 21. THE SYSTEM IS NOT DESIGNED FOR A GARBAGE GRINDER, HEALTH DEPT. 22. PLUMBING IN THE BASEMENT WILL BE REROUTED, 23. INSTALL RISERS FOR THE INLET AND OUTLET OF THE SEPTIC TANK, D -BOX AND THE 1 CHAMBER. 24. THE EXISTING SEPTIC TANK WILL BE ABANDONED ACCORDING TO TITLE 5 STANDARDS. THE SEPTIC TANK WILL BE PUMPED DRY, A HOLE WILL BE PUNCHED IN THE BOTTOM OF THE TANK. THE SEPTIC TANK WILL THEN BE FILLED WITH SAND. SEPTIC SYSTEM DESIGN PLAN CLIENT: LOCATION: LINA SCIALDONE 2 COTTONWOOD STREET YARMOUTH PORT. , MA. 02675 NO GARBAGE GRINDER ALLOWED'; SEPTIC TANK VOLUME: 1500 GAL DESIGN PERC RATE: < 2 MIN/INCH LTAR= .74 GPD/SF DATE: JANUARY 23, 2022 SCALE: 1" = 10' DESIGNED BY: TCR DRAWING NO.: JOB NO: CHECKED BY: JCS # DATE REVISION DESCRIPTION DRAWN CHK 13/21/22 ADD NOTES AND FLOOR PLAN TCR JCS 2 4/2/22 ADD NOTES AND NEW SAS SIZE TCR JCS 3 /12/22 ADD NOTES AND RESIZE SAS NEW FLOOR PLAN TCR JCS