Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. 3 9 Lot __34 Zone of Contribution: In Out Vie-Acreage.3 y aas + / Commercial: Residential: 16.---- Street: 6 3 l--/,35 i vus CAD(,vel! l2 Village: II fi Floor Plan: +� .2. #Bedrooms: Owner: kJ OS h v a t n 1-Nc!/e r_s a nJ Installer: A Address: `�/'�'C`q t r Phone: .1 'Dg s/ 7 - 6 O 3- Phone: 50 g - 3 35-_ 6 Builder: Engineer: �,., / Address: �N��N�e r'� � � o t-/lC S Phone: Phone: S a E z/7 9- 53 13 N/A YES NO 1.Required#of copies received 2.Date of soils exam and percolation test not older than 2 years 3.4-5 ft of naturally occurring pervious material,above water table 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: 5.Water line 10 ft from septic components Var.: V 6.Benchmark indicated and shown-NGVD if near wetlands 7. Se tic tank minimum 10 ft from foundation, deck Var.: ,/ 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 9.Leaching minimum 100 ft from wetlands Var.: 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: .__/ 11.Tank/leaching minimum 10 ft from property line Var.: % . 12. System meets all other setback requirements Var.: 1..-/-- 13.Uses adjustment for maximum high groundwater Var.: 14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.: %/- 15. System not in top or subsoil(A,B horizons)or 5' removal 1 16.Proposed contours are suitable 17. System meets slope requirements-min. 1/8", 1/"preferred .0/ 18. System meets breakout requirements PVC liner: Wall: f 19. Specified tee sizes are proper, gas baffle on outlet tee 1/- 20. Sewage is under 10,000 gpd for parcel __ ___ 21.No garbage disposal 22. System adequately sized for its intended use 23.Minimum 6"stone or compacted below tank and dbox I 24. Manhole covers within 6"of grade,pump chamber cover to grade I 25. Inspection port on plastic chambers/leach field \../- 26.Electrical permit for pump chamber/Separate meter for duplexes ✓ 27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size ‘/ 28. Septic tank/pump chamber to be factory waterproofed ../ 29.Vent provided if leaching below 3 feet,under driveway/parking 30.Buoyancy calculations for tank/pump chamber 31. Engineer to inspect and certify soils: wall: commercial: F 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33.H-20 loading is subject to vehicular traffic,groundwater ' 34.Title V Application and permit fee,installer signature 35.Foundation footing min.2 feet above adjusted ground water for new house V 36.Deed Restriction required max. #bedrooms: max. flow: gpd v". 37. Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: 60,0: