TO: Andrew Hazelton DATE: April 27, 2022
Perkins Eastman
RE: Mattacheese MS, Site Visit Report PAGES: 4
BY: Frank Stramaglia
SITE VISIT REPORT:
A site visit was made on Monday - April 11th, 2022, to review current progress. While on site no
deficiencies or code issues were observed.
FIRE PROTECTION STATUS
1. Building D fire protection is complete waiting for ceiling to drop heads.
2. Sprinkler work in A, B or C building are on-going.
PLUMBING STATUS
1. Building A and B plumbing rough almost complete.
2. Plumbing Insulation in progress.
Plumbing Rough-in in progress in all areas.
VAV International, Inc.
400 W. Cummings Park, Suite 4700 - Woburn, Massachusetts 01801 Tel (781) 935-7228 Fax (781) 935-1822 www.vavint.com
Filename: J:\2018 Jobs Folder\2017-046 (Mattacheese MS) Perkins Eastman\Documents\Site Visit Report #5 \Mattacheese Site
Visit Report 2022-04-27.pdf 2
Piping insulation in progress.
VAV International, Inc.
400 W. Cummings Park, Suite 4700 - Woburn, Massachusetts 01801 Tel (781) 935-7228 Fax (781) 935-1822 www.vavint.com
Filename: J:\2018 Jobs Folder\2017-046 (Mattacheese MS) Perkins Eastman\Documents\Site Visit Report #5 \Mattacheese Site
Visit Report 2022-04-27.pdf 3
Gas main installation in progress
Fire Protection in progress
VAV International, Inc.
400 W. Cummings Park, Suite 4700 - Woburn, Massachusetts 01801 Tel (781) 935-7228 Fax (781) 935-1822 www.vavint.com
Filename: J:\2018 Jobs Folder\2017-046 (Mattacheese MS) Perkins Eastman\Documents\Site Visit Report #5 \Mattacheese Site
Visit Report 2022-04-27.pdf 4
Roofdrains and overflow drains installed.
Drain covers to be installed.