HomeMy WebLinkAboutMattacheese MS Site Visit Report # 5 2022-4-27VAV International, Inc.  400 W. Cummings Park, Suite 4700 - Woburn, Massachusetts 01801 Tel (781) 935-7228 Fax (781) 935-1822 www.vavint.com Filename: J:\2018 Jobs Folder\2017-046 (Mattacheese MS) Perkins Eastman\Documents\Site Visit Report #5 \Mattacheese Site Visit Report 2022-04-27.pdf 1 TO: Andrew Hazelton DATE: April 27, 2022 Perkins Eastman RE: Mattacheese MS, Site Visit Report PAGES: 4 BY: Frank Stramaglia SITE VISIT REPORT: A site visit was made on Monday - April 11th, 2022, to review current progress. While on site no deficiencies or code issues were observed. FIRE PROTECTION STATUS 1. Building D fire protection is complete waiting for ceiling to drop heads. 2. Sprinkler work in A, B or C building are on-going. PLUMBING STATUS 1. Building A and B plumbing rough almost complete. 2. Plumbing Insulation in progress. Plumbing Rough-in in progress in all areas. VAV International, Inc.  400 W. Cummings Park, Suite 4700 - Woburn, Massachusetts 01801 Tel (781) 935-7228 Fax (781) 935-1822 www.vavint.com Filename: J:\2018 Jobs Folder\2017-046 (Mattacheese MS) Perkins Eastman\Documents\Site Visit Report #5 \Mattacheese Site Visit Report 2022-04-27.pdf 2 Piping insulation in progress. VAV International, Inc.  400 W. Cummings Park, Suite 4700 - Woburn, Massachusetts 01801 Tel (781) 935-7228 Fax (781) 935-1822 www.vavint.com Filename: J:\2018 Jobs Folder\2017-046 (Mattacheese MS) Perkins Eastman\Documents\Site Visit Report #5 \Mattacheese Site Visit Report 2022-04-27.pdf 3 Gas main installation in progress Fire Protection in progress VAV International, Inc.  400 W. Cummings Park, Suite 4700 - Woburn, Massachusetts 01801 Tel (781) 935-7228 Fax (781) 935-1822 www.vavint.com Filename: J:\2018 Jobs Folder\2017-046 (Mattacheese MS) Perkins Eastman\Documents\Site Visit Report #5 \Mattacheese Site Visit Report 2022-04-27.pdf 4 Roofdrains and overflow drains installed. Drain covers to be installed.