HomeMy WebLinkAboutCompliance Commonwealth of Massachusetts
Board of Health, Yarmouth, MA Fee
CERTIFICATE OF COMPLIANCE $110.00
Description of Work: NEW TANK, D-BOX,(2) 500 GAL. CHAMBERS SURROUNDED BY STONE
The undersigned hereby certify that the Sewage Disposal System; New Construction—2 Bdrm Deed Restriction
by: SWEENEY EXCAVATING
at: 26 MINDEN LN, YARMOUTH PORT, MA 02675
Has been installed in accordance with the provisions of 310 CMR 15.00 (Title 5) and the approved
design plans or as-built plans relating to application No.: BOHDC-22-3988, dated 8/19/2020
Installer: SWEENEY EXCAVATING
Address:5 CHART WELL DRIVE BOURNE, MA 02532 Inspector: Sweetser Engineering
Designer: Sweetser Engineering
Bruce G. Murphy,'MPH, R.S., 0/ ames G. Gardiner
Health Director/ ssistant Health Director
The issuance of this permit shall not be construed as a guarantee that the system will function as designed.