Loading...
22-EB057 32 Forest Gate ApprovedSherman, Lisa From: Selin Nacar - Sprinkle Home Improvement <sprink@comcast.net> Sent: Thursday, May 5, 2022 3:52 PM To: Sherman, Lisa Subject: Milka, 32 Forest Gate, Yarmouthport Attachments: Milka - Deck.pdf; Milka - Sliders.pdf, Gravel Path.docx; IMG_2733.jpg; IMG_1330jpg; IMG_1335.jpg; IMG_1331 jpg; IMG_1333 jpg Attention!: This email originates outside of the organization. Do not open attachments or click links unless you are sure this email is from a known sender and you know the content is safe. Call the sender to verify if unsure. Otherwise delete this email. Hello, The sliders are white and the deck and railings are Gravel Path (light gray). I attached another picture of the color for you as well. Also, I attached picture of the condo. Nothing is changing in regards to shape, size or location... same footprint as the understructure will remain for the deck and the sliders will go into the spots where removed from. Hope the pictures help. Please let me know what else I can do. Thank you again, Seii.*v Sprinkle Home Improvement 199 Barnstable Rd. Hyannis, MA 02601 508 775-1778 Ext. 10 RECEIVED MAY 0 6 2022 Htlmvu i e, APPROVED MAY 0 6 2022 YARMOU 0 Sherman, Lisa From: RICHARD GEGENWARTH <r.gegenwarth@comcast.net> Sent: Friday, May 6, 2022 9:40 AM To: Sherman, Lisa Subject: Re: 22-EB057 32 Forest Gate Attention!: This email originates outside of the organization. Do not open attachments or click links unless you are sure this email is from a known sender and you know the content is safe. Call the sender to verify if unsure. Otherwise delete this email. This should look good after completed. approve. The guidelines from Kings Way are very usefull. Richard On 05/06/2022 8:40 AM Sherman, Lisa <Isherman@yarmouth.ma.us> wrote: Hi Richard, Request to replace sliders and the deck at 32 Forest Gate. Please let me know if you need any additional information. Thanks Richard, Lisa Lisa Sherman Office Administrator Old Kings Highway Committee/Yarmouth Historical Commission Town of Yarmouth 508-398-2231, ext. 1292 1 APPROVED MAY 0 6 2N2 {ARMUu !'Ft HOME IMPROVEMENT SP RIN KLE 199 Barnstable Road Hyannis, MA 02601 (508) 775-1778 Fax (508) 775-1350 Email—sprinkncorruast,Ret Website address: wii w.snrinklebonre.com November 15, 2021 Re: 32 Forest Gate Yarmouthport, MA 02664 Dear Mr. Milka, Listed below is the replacement for your patio door using a white vinyl Harvey "Classic" style patio door. Sliders • Remove and dispose of two 2 -paneled sliding glass doors. • Supply and install two 2 -paneled white vinyl Harvey Gliding Patio Doors, one in the basement and one in the kitchen. • New doors will be Energy Star Rated with flush mounted deadbolts, Seacoast hardware, white powder -coat locksets and sliding screens. • Installation includes all necessary flashing, insulation and caulking as well as composite exterior trim and colonial pine interior trim. • Painting is not included and will be the homeowner's responsibility. -- Harvey Vinyl Patio Door Tr* fkrve "pidq duan Is saran cori"ed and+airm win heefydry tlurto¢to far owed bretiity. Welded each Camaa PIWW POWnM M SV"m"n n-dwriwedlrame olruoR6 im"W mem wit and ftTra dkmq. VnW a a MM -M =w, and ®n to cu*n M tD sUl KMT %*. Avasabe it om 2e WAW 0*M • DUO 51AR2 . Rbe,q�ss eaeen eritl, aU dedaufdMrn VWw . Rah mod doadbdi stawad on gmkg 9wids • lawn -pony haroware • camsaiSMUWA pwdape �J[ Thank you, Spydn� .Mala JmpwvemeW ECEIVED MAY 0 6 2022 ( kkhlVluu I r: APPROVED MAY 0 6 2022 YAR MOUI'H V"07 RECEIVED MAY 06 2C,'22 iAhmju : r, DLQ KING'S APPROVED MAY 0 6 Y kl-liv,. O ! i-, Tf �� H I Ghl W Ay 031 RECEIVED MAY 4 6 2022 YFit1muJ i r - MAY a 6 2022 YARNIUU'i h ULD KING'S HIGHWAY f000*� HOMEIMPROVEMENTPEI��NKLE 199 Barnstable Road Hyannis, MA 02601 (508) 775-1778 Fax (508) 775-1350 Email —s Website address: %viviv.sprinklehome.eom November 15, 2021 E CEIVFn'i Re: 32 Forest GateAY 6 ZOZZYarmouthport, MA 02664 i'AHMOU! r,KING'S Dear Mr. Milka, Listed below is the replacement for your deck. Decking • Remove and dispose of decking from rear deck, side deck and side landing. • Supply and install new Trex Transcend 514" X 6" decking using the Concealed Fastening System. Color: Gravel Path • Replace railing to both decks with Azek composite railing. Thank you, SpyWW . aaw Jmpwtwtn d APPROVED MAY 0 6 2022 YARMou s H o 51 I ECEIVED MAY 0 6 2022 y Arlivivo i r, APPROVW MAY 0 6 2022 YAHMOUTH ECr=IVED APPR7',,) MAY 0 6 2022 MAY 0 rmhlviuu I r Y'%I II,,, v.. Ain In , . Pc osl ECEIVED MAY 0 6 2022 A1PPW FI/EI/ MAY 0 6 2022 Er,FiVF li MAY 0 6 20'/ t Y / 1khlvivu + , APPRO E MAY 0 6 2022 ni n ?',fIF3 qOU 1 H P;4tfo�-7 RECEIVED APPROVED MAY 0 6 M,`) KINGS WAY CONDOMINIUM TRUST MAY 0 6 2022 ARCHITECTURAL and GROUNDS STANDARDS AND GUIDELINES YARMOU-FH )i D KING'S HIGHWAY DECK REHABILITATION POLICY In accordance with Section 7 (Rights and Obligations Appurtenant to Units) of the Master Deed, maintenance, repair and replacement of decks and stoops are the responsibility of the unit owner. By definition, decks and stoops shall include deck planking, support systems, railings, stairs, platforms and privacy screens. To ensure aesthetic uniformity in the appearance of Kings Way homes, specifications below must be followed when working on any deck or stoop. Proposed deviations require Trustees' prior approval. Please inform property management before any work is performed on your deck so to ensure you have an understanding of the rules and regulations. Non-compliance with these specifications shall be subject to fines and/or revisions to bring the structure into compliance. DECK RE -FINISHING: Surface treatment for wood decks, front and side steps, and railings is recommended to prolong the life span of the deck. Meticulous maintenance and regular coating cycles can increase deck service life from a normal 8-12 years to 20 years or more. There are five steps that should be followed when treating or staining your deck: 1) Wash the decking and railings with a fungicide and let the fungicide sit for 24 to 48 hours. This will help remove and prevent any fungus, mold and mildew that is existing or may exist in the future. 2) Pressure wash the decking and railings to remove the fungicide wash and any other material that may adversely affect the deck. You can rent a pressure washer, but if you are inexperienced in pressure washing it is advised you have a professional company wash the deck for you. 3) The decking and railings should be sanded lightly if needed. By sanding the deck it will help expose newer wood fibers, which will help to accept the stain as well as remove most rough surfaces and splinters. 4) If you decide to keep your deck natural, applying a wood preservative water seal (without color) such as Thompson Water Seal. This will help seal your wood deck and prolong the life span of the wood. 5) If you would like to stain the deck you have two options to use; Benjamin Moore's Arborcoat Silver Gray #623-70* and Benjamin Moore's Arborcoat Translucent Stain 326-10*. There is a Benjamin Moore store (Hubbard Paint) in Dennis. CONSTRUCTION: Replacement decks, front and side steps, and railings shall be similar to the original in all respects, except that planking may vary according to the type of material. Design plans and specifications for decks not previously constructed must be submitted to the Property Manager and Architectural Modification Committee (AMC) to review for compliance with the Massachusetts State Building Code and for Trustees' approval. The route for moving construction material to and from the work site should be discussed with the Property Manager to plan ways to avoid infringement on neighbors' area of use or Golf Club Property. Please refer to the Property Manager for wood dimensions for decking and railings. LUMBER: Use ACG pressure treated wood, Wolmanized Natural Select wood or any similar non -arsenic pressure treated wood. Mahogany may also be used. ,05� COMPOSITE: Only Trex Transcend decking and railing material are approved for use. The decking colors are Gravel Path or Rope Swing. The railing and baluster colors should be Gravel Path if using Gravel Path decking and Rope Swing if using Rope Swing decking. SHARED STRUCTURES: When deck components (support columns, stringers, railings, privacy screens, etc.) are common to two or more units, it is incumbent upon the interested unit owners to reach agreement on the need for repairs or replacement and their appropriate portion of the cost. If agreement cannot be reached, the issue must be brought before the Board of Trustees- the Board, acting as arbiters, will render a resolution that will be binding upon all parties. Residents in Fairway Homes should discuss questions on deck repairs with the Property Manager. POWER WASHING: If you live in a Carriage House or Fairway Home you MUST notify the home owners below your unit before the washing begins because dirty water and debris from the power washing may end up on your neighbor's windows, decks and furniture. Any deviation from the preceding policy must be approved in writing„ by the Property Manager, and/or Kings Way Condominium Trustee(s). If written permission is not received the unit will be fined by the association. I have read and understand the rules and regulations of the deck policy and will abide by them: Signature: Print Name: Unit#: REC M EIS MAY 0 6 2022 Y ArAN1VU k I, (Homeowner) Date: APPENDIX "B"— PET REGISTRATION FORM