Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. / / 5 Lot 17/8 Zone of Contribution: In Out Y Acreage /0� UO 0 A Commercial: Residential: V Street: /.4/ A r r 0 c Ler ci Or Village: Floor Plan: 1/ #Bedrooms: Owner: LD c rV 0:C.c.` .S , I l✓e,_ Installer: Q`, '� ,...)ti S Address: Phone: 77q-3 ?a- 0O l s Phone: C1. 78 - a O/ " W 6 cj/ Builder: Engineer: ECJ;n,i e Q r;,..,, (--)or � c Address: Phone: 5 O ' 1137 9 - 5 3 i 3 Phone: N/A YES,„ NO 1. Required#of copies received V 2.Date of soils exam and percolation test not older than 2 years 3.4-5 ft of naturally occurring pervious material,above water table V 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: V 5. Water line 10 ft from septic components Var.: 6. Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: \/ 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: ,� 9. Leaching minimum 100 ft from wetlands Var.: 10.Leaching minimum 150 ft from drinking wel1/25 ft irrigation well Var.: 11.Tank/leaching minimum 10 ft from property line Var.: 12. System meets all other setback requirements Var.: 13. Uses adjustment for maximum high groundwater Var.: V 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: I/ - .f.F tV 15. System not in top or subsoil(A,B horizons)or 5' removal ` 16. Proposed contours are suitable v� 17. System meets slope requirements-min. 1/8", 1/4"preferred \/, 18. System meets breakout requirements PVC liner: Wall: \<.,19. Specified tee sizes are proper, gas baffle on outlet tee 20. Sewage is under 10,000 gpd for parcel 21.No garbage disposal 22. System adequately sized for its intended use 1"/� 23.Minimum 6"stone or compacted below tank and dbox 1} 24. Manhole covers within 6"of grade, pump chamber cover to grade 25. Inspection port on plastic chambers/leach field 26. Electrical permit for pump chamber/Separate meter for duplexes 27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size vii 28. Septic tank/pump chamber to be factory waterproofed 29. Vent provided if leaching below 3 feet,under driveway/parking V 30.Buoyancy calculations for tank/pump chamber e./ 31. Engineer to inspect and certify soils: wall: commercial: 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33.H-20 loading is subject to vehicular traffic,groundwater 34.Title V Application and permit fee,installer signature V 35. Foundation footing min.2 feet above adjusted ground water for new house / 36.Deed Restriction required max. #bedrooms: max. flow: gpd �j 37. Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by:� 40 / 6 0101