HomeMy WebLinkAboutJ5951 Dennis Yarmouth Middle School WE 2022-04-29Summary Report #48
May 2, 2022
Attn:
Job No: 5951
Job Name:Dennis Yarmouth Middle School
296 Station Ave
South Yarmouth, MA 02664
Permit No.:BLD-21-006153
TESTING
INSPECTION
ENGINEERING
GK
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
April 25, 2022
Roney Nakhoul reported to Nick Hull with PMA at the jobsite. Performed bond testing inspection for spray-applied fireproofing. (13) Caps
applied. See attached.
Roney Nakhoul reported to Nick Hull with PMA at the jobsite. Performed engineering misc. inspection. See attached.
The work observed was, to the best of Roney's knowledge, in accordance with the approved plans, specifications and applicable standards of
workmanship.
April 27, 2022
Roney Nakhoul reported to Nick Hull with PMA at the jobsite. Performed engineering misc. inspection. See attached.
The work observed was, to the best of Roney's knowledge, in accordance with the approved plans, specifications and applicable standards of
workmanship.
Laboratory test results are enclosed if testing was done during the period covered by this report.
Limitations: These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as
acceptance or guarantee of the work. Even with diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the
code.
Reviewed by:
Jillian Kass
Staff Engineer
05-06-2022
Date
TESTING
INSPECTION
ENGINEERING
GK
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
Technical Contact: Bruce Tie, Engineering Manager (btie@fenaghengineering.com)
Administrative Contact: Gabriella Kass (Gkass@fenaghengineering.com)
cc:Fenagh PM – emushi@fenaghengineering.com (email)
Fenagh Technical Reviewer – btie@fenaghengineering.com (email)
TESTING
INSPECTION
ENGINEERING
Project No: 5951
Project Name: Dennis Yarmouth Middle School
Project Location: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Roney Nakhoul
Inspection Type: Spray-Applied Fire-Resistive Material
Pg. 1 of 2
April 25, 2022
Time In: 12:00 Time Out: 15:30
DFR ID: 34084
Weather: Sunny
Temperature: 58°F
Permit No. : BLD-21-006153
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
Roney Nakhoul reported to Nick Hull with PMA at the jobsite. Performed bond testing on spray-applied fire-resistive material at
the following locations: See below . Placed caps for bond testing of spray-applied fire-resistive material at the following locations:
See below . SFRM was Cafco, 300SB. 13 caps were applied. Diameter of cap 2-1/2, Area of cap .0341, Bond Strength Requirement
3.5 lbs.
Cohesion/Adhesion of SFRM Applied to Structural Members (ASTM E736)
Structure
Type Grid Location Floor Force
(lb)Cohesion/Adhesion (psf)Type of
Failure
Approximate
Area of material
involved in
failure
Comments
WF
Column L5/b12 Bldg A 11.5 337.24 Adhesive 0
WF
Column K8/b4 Bldg A 9.5 278.59 Adhesive 0
WF
Column N4/b5 Bldg A 9.8 287.39 Adhesive 0
Beam N.6/b2-b4 Bldg A 14.2 416.42 Adhesive 0
Beam N.6-N.7/b3 Bldg A 13.4 392.96 Adhesive 0
Beam M9-L9/b13 Bldg A 13.6 398.83 Adhesive 0
Beam M9-L9/b2.5 Bldg A 8.9 261.00 Adhesive 0
Beam M9-L9/b2.5 Bldg A 7.9 231.67 Adhesive 0
Beam A11/W-V.5 Bldg A 7.2 211.14 Adhesive 0
Beam A12/W-V.5 Bldg A 12.2 357.77 Adhesive 0
Fluted
deck A12/V-V.5 Bldg A 10.5 307.92 Adhesive 0
Beam A12/V-V.5 Bldg A 11.2 328.45 Adhesive 0
Beam A12/V-V.5 Bldg A 11.5 337.24 Adhesive 0
Referenced Details: Project specs and submittal
TESTING
INSPECTION
ENGINEERING
Project No: 5951
Project Name: Dennis Yarmouth Middle School
Project Location: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Roney Nakhoul
Inspection Type: Spray-Applied Fire-Resistive Material
Pg. 2 of 2
April 25, 2022
Time In: 12:00 Time Out: 15:30
DFR ID: 34084
Weather: Sunny
Temperature: 58°F
Permit No. : BLD-21-006153
Plans Dated: 11/18/2021
Conformance:
The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable standards
of workmanship.
Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below.
Reviewed by:
Roney Nakhoul
Inspector
04-25-2022
Date Jillian Kass
Staff Engineer
04-27-2022
Date
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
TESTING
INSPECTION
ENGINEERING
Project No: 5951
Project Name: Dennis Yarmouth Middle School
Project Location: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Roney Nakhoul
Inspection Type: Engineering Inspection
Pg. 1 of 1
April 25, 2022
Time In: 15:30 Time Out: 16:00
DFR ID: 34086
Weather: Sunny
Temperature: 58°F
Permit No. : BLD-21-006153
Plans Dated: 06/08/2021
Conformance:
The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable standards
of workmanship.
Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below.
Reviewed by:
Roney Nakhoul
Inspector
04-25-2022
Date Jillian Kass
Staff Engineer
04-27-2022
Date
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
Roney Nakhoul reported to Nick Hull with PMA at the jobsite.
At the request of PMA, a visual inspection of the welds at S.5/b14, wind bracing in Bldg A was observed with no exceptions.
Installed 3 AVB test dollies on the east wall of the gymnasium. The glue will require more time to set before pull testing can occur.
Installed and performed Cohesion/adhesion tests for fireproofing in Bdg A, refer to DFR ID #34084 for further details.
Referenced Details: SKA-1-7
TESTING
INSPECTION
ENGINEERING
Project No: 5951
Project Name: Dennis Yarmouth Middle School
Project Location: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Roney Nakhoul
Inspection Type: Engineering Inspection
Pg. 1 of 1
April 27, 2022
Time In: 07:15 Time Out: 08:15
DFR ID: 34213
Weather: Sunny
Temperature: 55°F
Permit No. : BLD-21-006153
Plans Dated: 06/08/2021
Conformance:
The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable standards
of workmanship.
Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below.
Reviewed by:
Roney Nakhoul
Inspector
04-27-2022
Date Jillian Kass
Staff Engineer
04-28-2022
Date
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
Roney Nakhoul reported to Nick Hull with PMA at the jobsite.
At the request of PMA, the 3 installed AVB test dollies on the east wall of the gymnasium were pulled. The failure method for all three
pulls experienced was a glue failure, and no AVB pulled off. 16 psi required for this testing.
Test 1: 22 psi
Test 2: 20 psi
Test 3: 27 psi
Observed lightgage metal framing at Bldg A along U and B13 Lines, the screws at bottom track have been installed as this was
previously reported nonconforming.
Referenced Details: SKA-1-7
TESTING
INSPECTION
ENGINEERING
Project No: 5951
Project Name: Dennis Yarmouth Middle School
Project Location: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Roney Nakhoul
April 27, 2022
Permit No. :
J5951 - Dennis Yarmouth Middle School - Exception Log Pages 1 of 5
NCR ID#Date Location Inspector Issue RFI/ Submittal
No.Resolved? (Y/N)Sub/ Contractor Date Resolved Comment
1 7/21/2021 Wall : C /d3 Arsene Ntwali Low break: Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content from 4.5% to 7.5%Y Marguerite Tuesday, January 18, 2022 12:53 PM
EOR to Advise 7 day break 08/10/2021 Set 1 = 1,860 psi
28 day break 08/31/2021
Set 1 = 2,800 psi Set 1 = 2,900 psi Set 1 = 3,480 psi
28 day average = 3,060 psi
2 7/28/2021 Footing : C16/E Arsene Ntwali Low break: Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content
from 4.5% to 7.5% : Lab Log No.: 15519 (2744-2745)
Y Marguerite Tuesday, January 18, 2022 12:53
PM
EOR to Advise
28 day break 08/31/2021 Set 1 = 3,350 psi Set 1 = 3,500 psi
Set 1 = 3,620 psi 56 day break 09/22/2021 Set 1 = psi
3 7/30/2021
Footings Set # 1 :Column
line/Row: D.3/c116 Set # 2
Columm line / Row c5/H
Arsene Ntwali
Low break:
Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content
from 4.5% to 7.5%
Y Marguerite
Tuesday, January
18, 2022 12:53
PM
EOR to Advise 28 day break 08/27/2021
Set 1 = 3,070 psi Set 1 = 3,330 psi Set 1 = 3,430 psi
Set 2 = 3,330 psi
Set 2 = 3,520 psi Set 2 = 3,580 psi 56 day break 09/24/2021
Set # 1 = 3,720 psi Set #2 = 3,670 psi
4 8/3/2021 Footings: Elevator pit foundation Arsene Ntwali
Low break:
Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content
from 4.5% to 7.5%
Y Marguerite
Tuesday, January
18, 2022 12:53
PM
EOR to Advise 7 day break 08/10/2021 Set 1 = 2,610 psi
28 day break 08/31/2021 Set 1 = 3,170 psi 56 day break 9/28/2021
Set 1 = 3,330 psi
Set 1 = 3,490 psi Set 1 = 3,700 psi 56 day average set 1 = 3,510 psi
5 8/6/2021 Level 1 Wall at Building C and B - E/c2 Arsene Ntwali
Low break:
Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content from 4.5% to 7.5%Y Marguerite
Tuesday, January
18, 2022 12:53 PM
EOR to Advise 7 day break 08/13/2021 Set 1 = 2,980 psi
28 day break 09/3/2021
Set 1 = 3,170 psi 56 day break 10/8/2021 Set 1 = 3,230 psi
Set 1 = 3,400 psi
56 day average set 1 3 320 psi
6 8/6/2021 Level 1 Wall at Building C and B - J.7/b25 Arsene Ntwali
Low break:
Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content from 4.5% to 7.5%Y Marguerite
Tuesday, January
18, 2022 12:53 PM
EOR to Advise 7 day break 08/13/2021
Set 2= 2,390 psi
28 day break 09/3/2021 Set 2 = 3380 psi 56 day break 10/8/2021
Set 1 = psi
7 8/13/2021 Level 1 Footings at Building B: P.1/b33 Arsene Ntwali Low break: Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content
from 4.5% to 7.5%
Y Marguerite Tuesday, January 18, 2022 12:53
PM
EOR to Advise
17 day break 08/30/2021
Set 1 = 3,090 psi 28 day break 09/10/2021 Set 1 = 3,460 psi
Set 1 = 3,510 psi 56 day break 10/08/2021 Set 1 = psi
Set 1 = psi
8 8/13/2021 Level 1 Footings at Building
B: J.3/b24 Arsene Ntwali Low break: Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content from 4.5% to 7.5%Y Marguerite Tuesday, January 18, 2022 12:53 PM
EOR to Advise
7 day break 08/20/2021 Set 1 = 2,320 psi 28 day break 09/10/2021
Set 1 = 2,840 psi
56 day break 10/08/2021 Set 1 = psi Set 1 = psi
J5951 - Dennis Yarmouth Middle School - Exception Log Pages 2 of 5
9 8/20/2021 Level 1 Footings at Foundation: Wall: H/c5 Arsene Ntwali Low break: Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content
from 4.5% to 7.5% : Lab Log No.: 15860 (3024)
Y Marguerite Tuesday, January 18, 2022 12:53
PM
EOR to Advise
7 day break 08/27/2021
Set 1 = 2,810 psi 28 day break 09/17/2021 Set 1 = 3,440 psi
Set 1 = 3,500 psi
56 day break 10/15/2021 Set 1 = 3,920 psi Set 1 = 4,020 psi
10 9/3/2021 Level 1 Wall; U/a5 Arsene Ntwali
Low break:
Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content
from 4.5% to 7.5% ; Lab Log No.: 16067 (3123)
Y Marguerite
Tuesday, January
18, 2022 12:53
PM
EOR to Advise
7 day break 09/10/2021 Set 1 = 2,050 psi 28 day break 10/01/2021
Set 1 = 3,100 psi
56 day break 10/29/2021 Set 1 = 3,510 psi Set 1 = 3,630 psi
Set 1 = 3,660 psi
11 9/9/2021 Level 1 Footing: M.5/b17 Arsene Ntwali
Low break:
Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content from 4.5% to 7.5% ; Lab Log No.: 16132 (3175)Y Marguerite
Tuesday, January
18, 2022 12:53 PM
EOR to Advise
7 day break 09/16/2021 Set 1 = 2,400 psi 28 day break 10/07/2021
Set 1 = 3,480 psi Set 1 = 3,490 psi 56 day break 11/04/2021
Set 1 = 4,050 psi
Set 1 = 4,240 psi
12 9/10/2021 Level 1 Footing: L.9/b2 Arsene Ntwali
Low break:
Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content from 4.5% to 7.5% ; Lab Log No.: 16133 (3176)Y Marguerite
Tuesday, January
18, 2022 12:53 PM
EOR to Advise 7 day break 09/17/2021 Set 1 = 2,330 psi
28 day break 10/08/2021
Set 1 = 3,450 psi Set 1 = 3,450 psi Set 1 = 3,490 psi
56 day break 11/05/2021 Set 1 = 4,060 psi
13 8/13/2021
Level 1 Footings at Building B: Set # 1
P.1/b33 Set # 2 J.3/b24
Arsene Ntwali Low break: Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content from 4.5% to 7.5% ; Lab Log No.: 15745 (2945-2946)Y Marguerite Tuesday, January 18, 2022 12:53 PM
EOR to Advise 7 day break 08/20/2021 Set 2 = 2,320 psi
28 day break 09/10/2021
Set 1 = 3,460 psi Set 1 = 3,510 psi Set 2 = 2,840 psi
56 day break 10/08/2021 Set 1 = 3,760 psi Set 1 = 3,850 psi
Set 2 = 3,260 psi
Set 2 = 3,030 psi Set 2 = 3,150 psi Set 2 = 3,260 psi
14 8/17/2021 Level 1 Footings at Building B: S.1/b27 Arsene Ntwali Low break: Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content
from 4.5% to 7.5% ; Lab Log No.: 15745 (2945-2946)
Y Marguerite Tuesday, January 18, 2022 12:53
PM
EOR to Advise 7 day break 08/24/2021
Set 1 = 2,510 psi 28 day break 09/14/2021 Set 1 = 3,280 psi
Set 1 = 3,430 psi
56 day break 10/12/2021 Set 1 = 4,070 psi Set 1 = 4,110 psi
15 9/23/2021 Level 1 Footings at Building B: P7/a18 Arsene Ntwali Low break: Mix Desing 5000D, design strength of 5,000 psi at 28 days, specified slump from 5 to 8 in., specified air content
from 4% to 7% ; Lab Log No.: 16288 (3264)
Y Marguerite Tuesday, January 18, 2022 12:53
PM
EOR to Advise
7 day break 09/30/2021
Set 1 = 3,510 psi 28 day break 10/21/2021 Set 1 = 4,470 psi
56 day break 11/18/2021 Set 1 = 4,880 psi Set 1 = 5,120 psi
Set 1 = 5,210 psi
16 11/2/2021 Level 1 Slab at Building D:
Line A-D1, Row D1-before D16 Enea Mushi Measured Floor Flatness, Levelness (34.7 and 18.3) did not meet overall project requirement (35 and 25)N Marguerite
Tuesday, January
18, 2022 12:53 PM EOR to Advise
J5951 - Dennis Yarmouth Middle School - Exception Log Pages 3 of 5
17 9/27/2021 Level 1 Wall at Q-P.7/a18, a18-24/WD17 : Sampled @ N.4/b5 Arsene Ntwali Low break: Mix Desing 5000D, design strength of 5,000 psi at 28 days, specified slump from 5 to 8 in., specified air content from 4% to 7% ; Lab Log No.: 16339 (3323)Y Marguerite Tuesday, January 18, 2022 12:53 PM
EOR to Advise
7 day break 10/04/2021
Set 1 = 3,510 psi 28 day break 10/25/2021 Set 1 = 4,170 psi
56 day break 11/22/2021
Set 1 = 4,700 psi 90 day break 12/26/2021 Set 1 = psi
Set 1 = psi
18 12/16/2021
Level 1, area A @ S.1-S.5/b11 bottoms only: Level 16
@ K.9-N/b33 steel girts: Level
low roof/high roof @ N.9-K/b1, K/b1-b22,L+P.7/a17-b21,
LP.7/a17+b21, V-V.9/a15,
W/a1-a14, W-V/a1, V/a1-a2, V-U/a2
Tony Paradis WPSs not available for review for Stellar Steel Erectors or United Steel. Stellar Steel Used FCAW process in the 2F, 4F, 2G and 3G possitions. United Steel used the SMAW process in the 2F possition. rnWPQRs recieved for Stellar
Steel Erectors show no welders qualified for FCAW welds in the 4F or 3G positions.
N PMA EOR to Advise
19 12/17/2021 top and bottom plates Tony Paradis Contractor has failed to maintain 3/4" minimum distance from screw to edge of light gauge surfaces as called for
in General Note 4 on SK-3.Y PMA Wed 3/9/2022
12:46 PM EOR to Advise
20 11/18/2021 Level 1 Metal pan stairs at Building D Arsene Ntwali Low Break : Mix #: 4000DGRNA : Slump 5-9 air 0-3 Design Strength (psi): 4,000 @28 days : Lab Log No.: 17282 (3681)N PMA
EOR to Advise
7 day break 11/25/2021 Set 1 = 2,060 psi 28 day break 12/16/2021
Set 1 = 2,580 psi 56 day break 01/13/2022 Set 1 = 3,220 psi
90 day break 02/16/2022
Set 1 = 3,350 psi
21 12/21/2021 locations at building A and B Blake Mullens
The items as listed herein have not been accomplished in accordance with the approved documents, plans and specifications: No. 10 screw missing at inside leg of track connections. Contractor to install inside leg no 10 screws with lift access. Pins at typical parapet detail within this area not spaced properly. Pins installed at
random locations instead of 5 pins within top 2" and 4 pins within bottom 2".
N PMA EOR to Advise
22 1/10/2022 Level 1, gridlines P.1-J.1/B.33 Abdulwahab Abulgasem CMU blocks the Vertical #7 by 16” not reaching overlap requirements, and may getting conflict with other structures as going up.Y PMA 1/13/2022 EOR to Advise
23 11/8/2021 Level 2 Salb on metal deck at
Building C: E/C4 Arsene Ntwali Low Break :
Mix #: 4000DGRNA : Slump 5-9 air 0-3 Design Strength (psi): 4,000 @28 days : Lab Log No.: 16995 N PMA
EOR to Advise 7 day break 11/15/2021
Set 1 = 2,880 psi 28 day break 12/06/2021 Set 1 = 3,820 psi
56 day break 01/03/2022
Set 1 = 4,160 psi Set 1 = 4,250 psi Set 1 = 4,300 psi
24 12/2/2021 Building C : F-G/C7-9 Arsene Ntwali Low Break : Mix #: 3000DNA : Slump 5-9 air 0-3 Design Strength (psi): 3,000 @28 days : Lab Log No.: 17226 (3735)N PMA
EOR to Advise
7 day break 12/09/2021
Set 1 = 1,290 psi 28 day break 12/30/2021 Set 1 = 1,720 psi
56 day break 01/27/2022 Set 1 = 1,780 psi 90 day break 03/2/2022
Set 1 = 1,780 psi
25 1/19/2022
1-P/A.10 Low roof media
center 2-P/A.12 Lowroof mediacenter
3-A5/W Foundation plan
A
Roney Nakhoul Cohesion/Adhesion of SFRM Applied to Structural Members failure: Fireproofing material is not adhering to the glue. Noted that material was wet to touch and 2 samples taken Y PMA 2/21/2022
Fireproofing material was given more
time to dry, plus warmer weather during this dates testing resulted withthe above tests. Cohesion adhesion
values exceed requirements by project
specs .
26 11/16/2021 Building A : N/b20, A5/S Arsene Ntwali Grout, low break: Design Strength (psi): 3,000 @28 days, Lab Log No.: 17087 (3651)Y PMA
1/19/2021
Page 13 of UNIT MASONRY 04 2000-13 Notes: 28-day compressive
strength indicated, but not less than 2000 psi
EOR to Advise 7 day break 11/23/2021 Set 1 = 2,300 psi
28 day break 12/14/2021 Set 1 = 2,660 psi 56 day break 01/11/2022
Set 1 = 3,300 psi
Set 1 = 3,330 psi
J5951 - Dennis Yarmouth Middle School - Exception Log Pages 4 of 5
27 11/18/2021 Building A :T.1/A7 Arsene Ntwali Grout, low break: Design Strength (psi): 3,000 @28 days, Lab Log No.: 17119 (3678)Y PMA
1/19/2021Page 13 of UNIT MASONRY 04 2000-
13 Notes: 28-day compressive strength indicated, but not less than
2000 psi
EOR to Advise 7 day break 11/25/2021 Set 1 = 1,830 psi
28 day break 12/16/2021
Set 1 = 2,290 psi 56 day break 01/13/2022 Set 1 = 2,450 psi
90 day break 02/16/2022 Set 1 = 2,660 psi
28 11/18/2021 Building D: T.1/A7 Arsene Ntwali Concrete, low break: Design Strength (psi): 4,000 @28 days, Lab Log No.: 17282 (3681)N PMA
EOR to Advise
7 day break 11/25/2021 Set 1 = 2,060 psi 28 day break 12/16/2021
Set 1 = 2,580 psi
56 day break 01/13/2022 Set 1 = 3,220 psi 90 day break 02/16/2022
Set 1 = 3,350 psi
118 day break 03/16/2022 Set 1 = 3,580 psi
29 11/22/2021 Building A : T.1/A6 Arsene Ntwali Concrete, low break: Design Strength (psi): 3,000 @28 days, Lab Log No.: 17197 (3728)N PMA
EOR to Advise 7 day break 11/29/2021
Set 1 = 1,720 psi
28 day break 12/20/2021 Set 1 = 2,310 psi 56 day break 01/17/2022
Set 1 = 2,370 psi
90 day break 02/20/2022 Set 1 = 2,390 psi
30 12/27/2021 Level 2, L-K.8/b21-b22 Eric Pitman Grout, low break: Design Strength (psi): 2,500 @28 days: Lab Log No.: 17890 (4010)N PMA
EOR to Advise
32 day break 01/28/2022 Set 1 = 1,190 psi 56 day break 02/27/2022
Set 1 = 1,270 psi 90 day break 03/27/2022Set 1 = 1,840 psi
118 day break 04/24/2022
Set 1 = 1,610 psi
31 2/9/2022 Grade on Level 1 at Line M.5-Q, Row a18-Pass a30 Enea Mushi
Floor Levelness measurement did not meet project spec requirements.
3.9 FINISHING FLOORS AND SLABSSpecified overall values of flatness, F(F) 35; and of levelness, F(L) 25; with minimum local values of flatness, F(F) 24; and of levelness, F(L) 17; for slabs-on grade
N PMA EOR to Advise
32 1/12/2022 P.2-B.30 -B-32 Bernard Connaughton Mortar low break: Design Strength (psi): 1,800 psi @ 28 days: Lab Log No.: 17776 N PMA
EOR to Advise 7 day break 01/19/2022
Set 1 = 1,060 psi Set 1 = 1,190 psi Set 1 = 1,250 psi
28 day break 02/09/2021
Set 1 =1,400 psi 56 day break 03/09/2022 Set 1 = 1,580 psi
90 day break 04/12/2022 Set 1 = 2,110 psi
33 1/11/2022 Gymnasium - East Elevation
at Line P.2-M.3-b33
Bernard
Connaughton Mortar low break: Design Strength (psi): 1,800 psi @ 28 days: Lab Log No.: 17775 N PMA
EOR to Advise 7 day break 01/18/2022 Set 1 = 630 psi
Set 1 = 740 psi Set 1 = 770 psi 28 day break 02/08/2021
Set 1 = 840 psi
56 day break 03/08/2022 Set 1 = 890 psi90 day break 04/11/2022
Set 1 = 1,010 psi
J5951 - Dennis Yarmouth Middle School - Exception Log Pages 5 of 5
34 1/24/2022 Gymnasium - at Line K/B33 Arsene Ntwali Mortar low break: Design Strength (psi): 1,800 psi @ 28 days: Lab Log No.: 17921 N PMA
EOR to Advise 7 day break 01/31/2022 Set 1 = 1,390 psi
Set 1 = 1,490 psi
Set 1 = 1,610 psi 28 day break 02/21/2021 Set 1 = 1,630 psi
56 day break 03/21/2022 Set 1 = 1,960 psiSet 1 = 2,100 psi
35 1/21/2022 Gymnasium, Line J.7-b30-b31, J.7-b25-b29 Arsene Ntwali Mortar low break: Design Strength (psi): 1,800 psi @ 28 days: Lab Log No.: 17913 N PMA
EOR to Advise
7 day break 01/28/2022 Set 1 = 1,270 psiSet 1 = 1,300 psi
Set 1 = 1,400 psi
28 day break 02/18/2021 Set 1 = 1,630 psi 56 day break 03/18/2022
Set 1 = 2,050 psi
36 3/1/2022 Bldg B section 5 and section
11 Roney Nakhoul
Missing Bands:
Banding missing in several locations at the exterior face; sheathing needs to be removed to fix in the 11section. Some of the inside bands also missing. This inspector observed that some studs were screwed into the top track which they should not, as this is a deflection track. Studs at some of the curved walls need securing at
the bottom on both sides; these areas appear in progress
Y PMA 3/9/2022 Observed hex screws being installed for
the bracing in bldg B
37 2/24/2022 P.1/b26-30 Arsene Ntwali Mortar low break: Design Strength (psi): 1,800 psi @ 28 days: Lab Log No.: 18046 (4052)N PMA
EOR to Advise
7 day break 02/11/2022 Set 1 = 1,050 psiSet 1 = 1,120 psi
Set 1 = 1,220 psi 28 day break 02/18/2021 Set 1 = 1,450 psi
Set 1 = 1,660 psi
Set 1 = 1,810 psi
38 3/30/2022 Building B Roney Nakhoul Work in Progress - Building B cold form metal framing N PMA Reinspection is required
39 4/12/2022 Level 1 Auditorium Seating Rows 1, 3, 5 Bernard Connaughton
Concrete in truck exceeded the 90 minutes batch to placement time by 35 minutes. Temperature was checked
after 100 minutes and at 115 minutes in the truck and remained at 70F. Truck fully discharged all concrete at 125
minutes.
N PMA
EOR to Advise7 day break 4/19/22
Set 1 = 4,460 psi
28 day break 5/10/22Set 1 = psi404/15/2022 Building C, Level 2 Roney Nakhoul Work in Progress - HVAC Duct near the C-D connector, east side, needs to be firestopped.N PMA Reinspection is required
Status: Work-in-Progress
Legend:
Status: Closed
Status: Open
TESTING
INSPECTION
ENGINEERINGNatick Lab: 12 Tech Circle, Natick, MA 01760
Field Number: 4 Masonry Grout Compression Test
Project Name: Dennis Yarmouth Middle School Permit # : BLD-21-006153
Project No.:5951 Sampled by: Eric Pittman Report Date: 04/24/2022
Client: PMA Consultants, LLC
Date of Sampling: 12/27/2021 Lab Log No.: 17890 (4010)
Reviewed by: Edmychael Colon, Lab
Manager
04/24/2022
Date
ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C1019, C31, C143, C231, C470, C511, C1077,
C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39.
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 1 of 1
Information provided by Field Technician
Mix #: Spec Mix Supplier: Bag Mix Contractor: Commodore
Set: 1 of 1 Truck #: N/A Design Strength (psi): 2,500 @28
days Ticket#: N/A
Sample Material/Shape: ASTM C1019 Compressive Testing of Masonry
Grout (Grout Box)Type of Structure: Elevator shaft
Location: Onsite
Location for overall pour:
Location when sampled: L-K.8/b21-b22
Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature (ºF):50-90 Slump (in.):N/A N/A Unit Wt (#cu ft):N/A
Air Temperature (ºF):>40 Air Content (%):N/A N/A Time Sampled:
Aggregate Size (in):N/A N/A Batch Time: Time in Truck:<90 Mins <90 Mins
Information supplied by Laboratory Technician
Date Received: 01/27/2022 Technician that received: MN
Test #Age of
Test (Days)Date Technician Dimensions (inch)X-section Total Load
(lbs)Strength (psi)Width Width Height Area (in²)
A 32 01/28/2022 Max Nabulsi 3.34 3.39 6.53 11.32 13,443 1,190 psi
B 56 02/21/2022 Luis Soto Soldevilla 3.39 3.33 6.35 11.29 14,295 1,270 psi
C 90 03/27/2022 Luis Soto Soldevilla 3.40 3.35 6.19 11.39 20,956 1,840 psi
D 118 04/24/2022 Max Nabulsi 3.33 3.34 6.36 11.12 17,877 1,610 psi
118 Day Avg.:1610
Remarks:
TESTING
INSPECTION
ENGINEERINGNatick Lab: 12 Tech Circle, Natick, MA 01760
Field Number: 15 Laboratory Compression Test (4x8)
Project Name: Dennis Yarmouth Middle School Permit # : BLD-21-006153
Project No.:5951 Sampled by: James Descoteaux Report Date: 04/28/2022
Client: PMA Consultants, LLC
Date of Sampling: 03/31/2022 Lab Log No.: 18943
Reviewed by: Edmychael Colon, Lab
Manager
04/28/2022
Date
ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077,
C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39.
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 1 of 3
Information provided by Field Technician
Mix #: 4000DNA Supplier: Cape Cod Ready Mix Contractor: Silverback Concrete Construction
Set: 1 of 3 Truck #: 56 Design Strength (psi): 4,000 @28
days Ticket#: 23801
Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical
Concrete Specimens (4x8)Type of Structure: Slab on Grade
Location: Onsite
Location for overall pour: Level 1 Slab on Grade at Buidling A and Monumental Stair Building B (B1-B3/K-L.9),(U-R/A2-A12),(N.9-
Location when sampled: N.4/B.9
Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature (ºF):64 50-90 Slump or Spread (in.):7.5 5-9 Unit Wt (#cu ft):150.1 145
Air Temperature (ºF):42 >40 Air Content (%):2.3 0-3 Time Sampled:7:33 AM
Aggregate Size (in):3/4 3/4 Batch Time:6:24 AM Time in Truck:69 minutes <90 Mins
Information supplied by Laboratory Technician
Date Received: 04/07/2022 Technician that received: JK
Test #
Age of
Test
(Days)
Date Technician Diameter Length Area (in²)Cure Loc Ultimate Load
(lbs)
Compressive
Strength (psi)
Type of
Fracture
A 7 04/07/2022 Luis Soto Soldevilla 4.00 8.00 12.57 Lab 53,885 4,290 psi Type 2
B 28 04/28/2022 Roshan Yadav 4.00 8.00 12.57 Lab 68,812 5,470 psi Type 2
C 28 04/28/2022 Roshan Yadav 4.00 8.00 12.57 Lab 71,982 5,730 psi Type 2
D 28 04/28/2022 Roshan Yadav 4.00 8.00 12.57 Lab 72,995 5,810 psi Type 2
E H H 4.00 8.00 12.57 Lab
MEETS DESIGN STRENGTH
28 Day Avg.:5,670 psi
Remarks: Received Sample Condition: Acceptable and/or Satisfactory
TESTING
INSPECTION
ENGINEERINGNatick Lab: 12 Tech Circle, Natick, MA 01760
Field Number: 15 Laboratory Compression Test (4x8)
Project Name: Dennis Yarmouth Middle School Permit # : BLD-21-006153
Project No.:5951 Sampled by: James Descoteaux Report Date: 04/28/2022
Client: PMA Consultants, LLC
Date of Sampling: 03/31/2022 Lab Log No.: 18943
Reviewed by: Edmychael Colon, Lab
Manager
04/28/2022
Date
ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077,
C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39.
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 2 of 3
Information provided by Field Technician
Mix #: 4000DNA Supplier: Cape Cod Ready Mix Contractor: Silverback Concrete Construction
Set: 2 of 3 Truck #: 75 Design Strength (psi): 4,000 @28
days Ticket#: 34225
Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical
Concrete Specimens (4x8)Type of Structure: Slab on Grade
Location: Onsite
Location for overall pour: Level 1 Slab on Grade at Buidling A and Monumental Stair Building B (B1-B3/K-L.9),(U-R/A2-A12),(N.9-
Location when sampled: R/A8
Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature (ºF):69 50-90 Slump or Spread (in.):8.25 5-9 Unit Wt (#cu ft):149.9 145
Air Temperature (ºF):48 >40 Air Content (%):1.9 0-3 Time Sampled:8:40 AM
Aggregate Size (in):3/4 3/4 Batch Time:7:41 AM Time in Truck:59 minutes <90 Mins
Information supplied by Laboratory Technician
Date Received: 04/07/2022 Technician that received: JK
Test #
Age of
Test
(Days)
Date Technician Diameter Length Area (in²)Cure Loc Ultimate Load
(lbs)
Compressive
Strength (psi)
Type of
Fracture
A 7 04/07/2022 Luis Soto Soldevilla 4.00 8.00 12.57 Lab 51,156 4,070 psi Type 2
B 28 04/28/2022 Roshan Yadav 4.00 8.00 12.57 Lab 67,889 5,400 psi Type 2
C 28 04/28/2022 Roshan Yadav 4.00 8.00 12.57 Lab 70,256 5,590 psi Type 2
D 28 04/28/2022 Roshan Yadav 4.00 8.00 12.57 Lab 69,075 5,500 psi Type 2
E H H 4.00 8.00 12.57 Lab
MEETS DESIGN STRENGTH
28 Day Avg.:5,500 psi
Remarks:
TESTING
INSPECTION
ENGINEERINGNatick Lab: 12 Tech Circle, Natick, MA 01760
Field Number: 15 Laboratory Compression Test (4x8)
Project Name: Dennis Yarmouth Middle School Permit # : BLD-21-006153
Project No.:5951 Sampled by: James Descoteaux Report Date: 04/28/2022
Client: PMA Consultants, LLC
Date of Sampling: 03/31/2022 Lab Log No.: 18943
Reviewed by: Edmychael Colon, Lab
Manager
04/28/2022
Date
ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077,
C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39.
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 3 of 3
Information provided by Field Technician
Mix #: 4000DNA Supplier: Cape Cod Ready Mix Contractor: Silverback Concrete Construction
Set: 3 of 3 Truck #: 61 Design Strength (psi): 4,000 @28
days Ticket#: 34230
Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical
Concrete Specimens (4x8)Type of Structure: Slab on Grade
Location: Onsite
Location for overall pour: Level 1 Slab on Grade at Buidling A and Monumental Stair Building B (B1-B3/K-L.9),(U-R/A2-A12),(N.9-
Location when sampled: S.7/A5
Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature (ºF):70 50-90 Slump or Spread (in.):6.25 5-9 Unit Wt (#cu ft):149.4 145
Air Temperature (ºF):52 >40 Air Content (%):1.7 0-3 Time Sampled:10:00 AM
Aggregate Size (in):3/4 N/A Batch Time:8:52 AM Time in Truck:68 minutes <90 Mins
Information supplied by Laboratory Technician
Date Received: 04/07/2022 Technician that received: JK
Test #
Age of
Test
(Days)
Date Technician Diameter Length Area (in²)Cure Loc Ultimate Load
(lbs)
Compressive
Strength (psi)
Type of
Fracture
A 7 04/07/2022 Luis Soto Soldevilla 4.00 8.00 12.57 Lab 52,782 4,200 psi Type 2
B 28 04/28/2022 Roshan Yadav 4.00 8.00 12.57 Lab 71,634 5,700 psi Type 2
C 28 04/28/2022 Roshan Yadav 4.00 8.00 12.57 Lab 70,275 5,590 psi Type 2
D 28 04/28/2022 Roshan Yadav 4.00 8.00 12.57 Lab 71,193 5,660 psi Type 2
E H H 4.00 8.00 12.57 Lab
MEETS DESIGN STRENGTH
28 Day Avg.:5,650 psi
Remarks:
TESTING
INSPECTION
ENGINEERINGNatick Lab: 12 Tech Circle, Natick, MA 01760
Field Number: 5 Laboratory Compression Test (4x8)
Project Name: Dennis Yarmouth Middle School Permit # : BLD-21-006153
Project No.:5951 Sampled by: Eric Pittman Report Date: 04/28/2022
Client: PMA Consultants, LLC
Date of Sampling: 04/21/2022 Lab Log No.: 19206
Reviewed by: Edmychael Colon, Lab
Manager
04/28/2022
Date
ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077,
C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39.
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 1 of 1
Information provided by Field Technician
Mix #: 4000 D 3/4 Supplier: Cape Cod Ready Mix Contractor: Marguerite
Set: 1 of 1 Truck #: 74 Design Strength (psi): 4,000 @28
days Ticket#: 34568
Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical
Concrete Specimens (4x8)Type of Structure: Slab on Grade
Location: Onsite
Location for overall pour: ext. sitework Slab on Grade at slab #1 for field sports storage shed
Location when sampled: Pad #1
Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature (ºF):63 50-90 Slump or Spread (in.):5.25 4-7 Unit Wt (#cu ft):N/A
Air Temperature (ºF):53 >40 Air Content (%):7.5 4.5-7.5 Time Sampled:1:10 PM
Aggregate Size (in):3/4 3/4 Batch Time:12:20 PM Time in Truck:50 minutes <90 Mins
Information supplied by Laboratory Technician
Date Received: 04/25/2022 Technician that received: MN
Test #
Age of
Test
(Days)
Date Technician Diameter Length Area (in²)Cure Loc Ultimate Load
(lbs)
Compressive
Strength (psi)
Type of
Fracture
A 7 04/28/2022 Roshan Yadav 4.00 8.00 12.57 Lab 56,055 4,460 psi Type 2
B 28 05/19/2022 4.00 8.00 12.57 Lab
C 28 05/19/2022 4.00 8.00 12.57 Lab
D 28 05/19/2022 4.00 8.00 12.57 Lab
E 28 05/19/2022 4.00 8.00 12.57 Lab
7 Day Avg.:4,460 psi
Remarks: Received Sample Condition: Acceptable and/or Satisfactory
TESTING
INSPECTION
ENGINEERINGNatick Lab: 12 Tech Circle, Natick, MA 01760
Field Number: 5 Laboratory Compression Test (4x8)
Project Name: Dennis Yarmouth Middle School Permit # : BLD-21-006153
Project No.:5951 Sampled by: Eric Pittman Report Date: 04/28/2022
Client: PMA Consultants, LLC
Date of Sampling: 04/21/2022 Lab Log No.: 19207
Reviewed by: Edmychael Colon, Lab
Manager
04/28/2022
Date
ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077,
C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39.
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 1 of 1
Information provided by Field Technician
Mix #: 4000 DGRNA Supplier: Cape Cod Ready Mix Contractor: Gorilla
Set: 1 of 1 Truck #: 67 Design Strength (psi): 4,000 @28
days Ticket#: 34559
Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical
Concrete Specimens (4x8)Type of Structure: Slab on Metal Deck
Location: Onsite
Location for overall pour: level 1 Slab on Metal Deck at T-P/a7, auditorium seating upper two tiers
Location when sampled: S/a7
Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature (ºF):61 50-90 Slump or Spread (in.):6 6-8 Unit Wt (#cu ft):N/A
Air Temperature (ºF):52 >40 Air Content (%):3 0-3 Time Sampled:8:35 AM
Aggregate Size (in):3/8 3/8 Batch Time:7:47 AM Time in Truck:48 minutes <90 Mins
Information supplied by Laboratory Technician
Date Received: 04/25/2022 Technician that received: MN
Test #
Age of
Test
(Days)
Date Technician Diameter Length Area (in²)Cure Loc Ultimate Load
(lbs)
Compressive
Strength (psi)
Type of
Fracture
A 7 04/28/2022 Roshan Yadav 4.00 8.00 12.57 Lab 41,734 3,320 psi Type 5
B 28 05/19/2022 4.00 8.00 12.57 Lab
C 28 05/19/2022 4.00 8.00 12.57 Lab
D 28 05/19/2022 4.00 8.00 12.57 Lab
E 28 05/19/2022 4.00 8.00 12.57 Lab
7 Day Avg.:3,320 psi
Remarks: Received Sample Condition: Acceptable and/or Satisfactory