Loading...
Review Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. / Lot / 5 Zone of Contribution: In Out V Acreage/61)D 6 0 Commercial: Residential: .tom Street: .3 3 fi)CSG Sa Nrt .S-t Village: Floor Plan: #Bedrooms: / Owner: Pa How s /,,:lv Re✓ocL/z "ir„s1'Installer: S IP�Rl2via n7 Address: / �'X e A u c,7` u Phone: co , 4/3,Q.-- S$ c Phone: Builder: Engineer: Address: � j)01..E I,) CA pc. res r arse�, ,uy Phone: Phone: !4.0 ? 3 6.).- S ys - 4/ N/A YES NO 1.Required#of copies received 2.Date of soils exam and percolation test not older than 2 years bra✓"irk L)41 V 3.4-5 ft of naturally occurring pervious material,above water table �' 4.Foundation 2 ft above high point of road H.P.: Fnd: Van: V 5.Water line 10 ft from septic components Var.: V 6.Benchmark indicated and shown-NGVD if near wetlands ✓ 7. Septic tank minimum 10 ft from foundation,deck 10 r. ✓ 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab 4VA 17: 8/i 9.Leachingminimum 100 ft from wetlands Var.: 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: V' 11.Tank/leaching minimum 10 ft from property line Var.: V 12. System meets all other setback requirements Var.: 13.Uses adjustment for maximum high groundwater Var.: 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: 15. System not in top or subsoil(A,B horizons)or 5'removal 16.Proposed contours are suitable V.-- 17. System meets slope requirements-min. 1/8", 1/4"preferred ir - 18. System meets breakout requirements PVC liner: Wall: 19. Specified tee sizes are proper, gas baffle on outlet tee 1/‘ 20. Sewage is under 10,000 gpd for parcel 21.No garbage disposal 22. System adequately sized for its intended use _/ 23.Minimum 6"stone or compacted below tank and dbox I V I 24.Manhole covers within 6"of grade,pump chamber cover to grade V 25. Inspection port on plastic chambers/leach field 26.Electrical permit for pump chamber/Separate meter for duplexes 27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size V 28. Septic tank/pump chamber to be factory waterproofed V 29.Vent provided if leaching below 3 feet,under driveway/parking 30.Buoyancy calculations for tank/pump chamber 31.Engineer to inspect and certify soils: wall: commercial: 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature V 33.H-20 loading is subject to vehicular traffic,groundwater 34.Title V Application and permit fee,installer signature V 35.Foundation footing min. 2 feet above adjusted ground water for new house IV 36.Deed Restriction required max. #bedrooms: max. flow: gpd V> 37. Check area lots for groundwater/Label groundwater in Assessor's Map �J Plan reviewed by: _ 4, A 603 D3