Loading...
HomeMy WebLinkAboutEngineer PlanBENCHMARK TOP OF FOUNDATION ELEV. = ; o ; (ASSUMED) 4' CAST IRON PIPE (OR EQUAL) MINIMUM PITCH 1/4' PER FT. -ELEV. _ y�l _ 20 FT. MINIMUM FROM CELLAR 10 FT. MINIMUM FROM SLAB OR CRAWL SPACE COVERS 4' SCHEDULE 40 PVC PIPE MIN. PITCH 1/8' PER FT. FLOW V, - 7 0 LE V. _ B GAS ELEV. _ + 6' SUMP ELEIV DiSTRiBUTI0 BOX "��'_-:-' -� (TO BE PLACED ON FIRM BASE) TO BE WATER TES 1500 GALLON IF MORE THAN ONE ou —r SEPTIC TANK (TO BE. PLACED ON FIRM BASE) 3/4 TO 1 1/2'-J W STONE SEWAGE DISPOSAL SYSTEM PROFILE NOT TO SCALE CLEAN SAND LOAM AND SEED 2' LA'rER OF i 1/8' TO 1/2' WASHED STONE a e HK;H CAPAGTY INFILTRATORS WTH STONE IN AN z r '" TRENCH FORMATION g SOIL ABSORPTION SYSTEM (SAS) USGS PROBABLE WATER TABLE. ELEV. = OBSERVED WATER TABLE (; ` /. } /, . 1, ELEV. BOTTOM OF TEST HOLE ELEV. = � r r i- f I � rr A ` t\ NOTTREQUIRED 1 CU. FT, OF CONCRETE ANCHOR V. WE_ ZoN& - is INDEX _'f ADJUST. ? ,= LEGEND: EXISTING SPOT ELEVATION 00,30 EXISTING CONTOUR ----00---- FINAL SPOT ELEVATION [0O FINAL CONTOUR ---[�- — SOIL TEST LOCATION UnUTY POLE -0- TOWN WATER —WSW CATCH BASIN t®) GAS LINE ---G - CLEAN OUT C•�a�""' CESSPOOL C.P- 11. ALL UHBIATABLE MATERIAL SHALL BE R£ WYM FROM UNDER AND FOR A- MMM OF V ARO" SOM, ABSORPTION SYMEM AND BE RFPLAOtIiI IM MATEO& AS SPFOIFIFA IN 310 CMR 1S2ft(3j T2. E M MIO O PMiO IS TO BE TO EXIT AS SHOW4. R IE c II- NOV � 0 2000 HEALTH DEP' SOIL TEST DATE OF SOIL TEST SOIL TEST: DONE BY SWEETSER ENGINEERING WITNESSED BY -_ OBSERVATION HOLE 1 ELEV.=�_'__ PERCOLATION RATE MIN./INCH AT INCHES DEPTH HORIZ TEXTURE COLOR MOT. OTHER PROJECT LOCATION SWEETSER ENGINEERING 235 GREAT WESTERN ROAD 508— P. 0. BOX 713 398-3322 SOUTH DENNIS, MASS. 02660 DATE 2 SC1>. _ ALE REVISED JOB N0, SHEEN OF IL LOCATION MAP REVISED ��. WATER ENCOUNTERED AT ELEV. DESIGN CALCULATIONS . NUMBER OF BEDROOMS GARBAGE DISPOSAL UNIT _ O TOTAL ESTIMATED 'FLOW ( 110 GAL/SR./DAY X illi-) y. GAL/DAY REQULcMD SEPTIC TANK CAPACITY 1500 GAL ACTUAL SZE OF SEPTIC TANK GA SOIL CLASSIFICATION I DESIGN PERCOtATM RATE < 5 MIN /IN. Oi'LUENT LOADING RATE ,034_ GAL /DAY/S.F- LEACNOIG AREA SQ. FT- LEACHING CAPACITY (AREA X RATE) GAL:/DAY RESERVE LEACHING CAPAUUTY ,�. ;.. GAL./DAY NOTES: 1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO D.E.P: TITLE 5 AND THE TOWN OF - RULES AND REGULATIONS FOR THE SUBSURFACE DISPOSAL OF SEWAGE, 2. ALL COVERS TO SANITARY UNIT'S SHALL BE BROUGHT TO WITHIN 6' OF .FINISHED GRADE. 9: 3- ALL COMPONENTSOFTHE SANITARY SYSTEM SHALL BE CAPABLE OF WITHSTANDING H-10 LOADING UNLESS THEY ARE UNDER OR WiTHW 10 FT, OF DRIVES OR PARKING AREAS: H-20 LOADING SHALL BE USED UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING ARJAS. 4. ANY MASONARY UNITS USED TO BRING COVERS TO GRADE SHALL BE MORTARED IN PLACE- 5. LACE5. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH DEEDED OR ZONING REGULATIONS. OWNER / APPLICANT IS TO OBTAIN SUCH DE.TFRMWATION FROM APPROPRIATE A THORITY lt. UTILITIEZi bhVWN AKL Ar'F'KV.UMA E iir&f, CA4!'t VPI( Y VNYiYtinvTvti 5.. IS TO CALL 'DIG -SAFE' AT 1 -OW -344-7233 AT LEAST 72 HOURS i PRIOR TO COMMENCING WORK ON SITE i 7. CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS AS WELL AS SITE CONDITIONS PRIOR TO COMMENCING WORK ON SITE ANY VARIATION IS TO BE BROUGHT TO THE AT'TE'NTION OF THE DESIGN EN"EEIR I IMMEDIATELY- l 8. PARCEL IS IN FLOOD ZONE <' j _9 -LOT IS -SHOWN-Ot+-ASSES50RS-*AP--t.;. AS PAR6EE . �,... 10. EXISTING SEPTICS ARE TO BE PUMPEDr. ti PP APPROVED: BOARD OF HEALTH .4- DATE AGENT a of h)y? a PROPOSED SEPTIC DESIGN FOR PROJECT LOCATION SWEETSER ENGINEERING 235 GREAT WESTERN ROAD 508— P. 0. BOX 713 398-3322 SOUTH DENNIS, MASS. 02660 DATE 2 SC1>. _ ALE REVISED JOB N0, SHEEN OF IL LOCATION MAP REVISED ��. a