Loading...
HomeMy WebLinkAboutEngineer PlanPONAL WATER LTD (TYPICAL) SURVEY HATH PROPERTY BOUNDARIES, UTILITY LOCATION AND EXISTING TOPOGRAPHY PROVIDED BY ENGINEERINGSERVICES DEMAREST LAND SURVEYING, PLS I4 FEBRUARY 2022. VARIANCES I SITE NOTES: 1 PROPOSED SYSTEM COMPONENTS MAP 60 PCL. 72 o O AR T TEDINAFLOOD ZONE. Vytao��9 aS PLACUS o aa�o 85COUrtIBnd Street 2. THE PROPERTY IS NOT LOCATED Providence, RI 02909 HIN AZONE It.-- i L 3. O DRINKING WATER WELLS WITHIN " P: +1 (508) 954 0677 100 FEET OF PROPOSED SYSTEM. 4 E: Jay@robialwater.COm CONSULTANTS: { \ r. FO Q VICINITY MAP. c1 O.a GENERAL NOTES SP Great EXCAVATING LLQ G 235 Greet Western Rd 1.. THIS PLAN IS INTENDED FOR THE DESIGN OF THE SEWAGE DISPOSAL SYSTEM ONLY AND IS NOT TO Dennis, MA 02660 \ ` t G. 00. F� BE USED TO ESTABLISH NEW OR EXISTING. PROPERTY LINES OR DWELLINGS. P: +1 (508) 432 5565 2. LOCATION OF WATER, GAS AND ELECTRIC UTILITY LINES IS APPROXIMATE. THE CONTRACTOR IS E: info@speakmmnexcavating.com RESPONSIBLE FOR CONTACTING DIGSAFE AT 1-888,M,14233 AND THE LOCAL WATER DEPARTMENT PRIOR TO CONSTRUCTION 23. INSTALLATION SHALL BE IN ACCORDANCE WITH THE STATE ENVIRONMENTAL CODE, TITLE 5 (310 CMR v+° F' p' 15.000), THE LOCAL BOARD OF HEALTH REGULATIONS, AND THE INFILTRATOR SEPTIC MA DESIGN CATCH BASIN AND INSTALLATION MANUAL. J (TYPICAL) 4. THE CONTRACTOR MUST HOLD A VALID INSTALLER LICENSE IN THE TOWN OF RECORD. 5. THE CONTRACTOR SHALL NOTIFY THE ENGINEER AND THE LOCAL BOARD OF HEALTH OF ANY r - - - - - - - - _ - - - BENCHMARK CONCRETE \ ,(10 \ CHANGES TO THESE PLANS. BOUND ARL=lK CO ° QP a � � 6. CONTRACTOR SHALL CALL FOR INSPECTIONS AND APPROVALS FROM THE BOARD OF HEALTH AND \ THE ENGINEER AFTER: MAP 60 (ASSUMED) \ G�.. `\ 6.1. EXCAVATION OF SAS AREA EXPOSING THE BOTTOM OF SYSTEM. PCL. 70. / 98 y 6.2. INSTALLATION OF SYSTEM COMPONENTS PRIOR TO BACKFILL I �(t,P1' A'SSgc / w 7. ALL PIPING AND FITTINGS SHALL BE SCHEDULE 40 PVC UNLESS OTHERWISE SPECIFIED. y QjF.• \`C !t �'. 8. FINISHED GRADE OVER THE SAS SHALL HAVE A MINIMUM 2% SLOPE. I g JAY THRASHW ER GN ` J J 9. EXISTING TANK AND CESSPOOL TO BE PUMPED DRY AND FILLED WITH SAND. g "E 1Da63 EXISTINGTANKAND /� y� 10. NO GARBAGE GRINDER SHALL BE INSTALLED AT THE EXISTING DWELLING. U CIVIL y 9 11. PLUMBER SHALL REROUTE EXISTING SEWER TO FRONT OF DWELLING AS SHOWN ON SITE PLAN CESSPOOLS TO BE . I No. 54434 63133 \ ABANDONED SEE NOTES gP�� % PROPOSED INVERT N13! \ \ 4" PVC CLEANOUTS NA TO BE OT PLACED AT SEWER \ CONNECTIONS '� O \ 1500 GAL. HAA \ 1 -COMPARTMENT \ SEPTICTANK r I BENCHMARK: CORNER OF 20 / \ \ CONCRETE SHOWER PAD EL = 100.2'(ASSUMED) 11993 \ \ / TH EL=99.1' \ y AREA EDGE OF WOODS L=99.2' \ -- 23,441*S.F. (0.64* AC.) oro a� 0 SAS:12 CUTLEC C-4 CHAMBERS 4" PVC INSPECTION / 12' W x 32'L x 85'1-1 6`\ PORT �L \ / Q SOIL EVALUATION TEST PIT LOGS Address: 95 Pond St Test Date; 1/20/2022 BOH Agent; Phillip Renaud Soil Evaulator. :Dave Mason SEp1501 = rw.z n Test Hole I (Eiev.99.1) c DEPTH (inches) HORIZON( LAYER TEXTURE (USDA) COLOR (Munsell) 0-6 Ap Loamy Sand 10YR3/1 6-32 B LoamySand10YR6/8 0.74'. GPD/sqft 32 120 C Medium Sand I 2.5YR7/4 Notes: No groundwater observed. SHGW assumed @ bottom of .pit. Elev-89.1 r .a 9" MIN. Total Chambers 12 Test Hole 2(Elev. 99.21 I=98.6 DEPTH inches) HORIZON/ LAYER TEXTURE(USDA) COLOR Munsell 0-6 Ap 1oamY5and 10YR3/1 6-32 B Loam Sand 10YR6/8 32-120 C Medium Sand 2.5YR7/4 Notes: No groundwater observed. SHGW assumed @ bottom of pit, Elev=89.2 r3" Percolation Test LocaOom. Depth .Results. Rate THS 36-48" couldnotsaturate <2min/Inch. I ire 1� = rw.z n 440 GPD c 41NCH INSPECTION - "_ 99 * 9"MIN. TO 3 :1500 gallons PLACED ABOVE SAS 98.5* PORT TO GRADE. 3 I I I I I I I I L- _ _ _ _ _ _ - _ - _ 1. REVISED SAS LOCATION 4/14/2022 €� No. REVISION/SUBMISSION DATE r , > 9, 95 POND STREET ASSESSORS MAP 60 PARCEL 71 a 4. 82, m 98 - rri SITE PLAN rT o / SCALE: 1"=20' v 0 20 40 a o v v 0 v a owe = rw.z S&.5# 440 GPD FILTER. FABRIC 41NCH INSPECTION - "_ 99 * 9"MIN. TO 3 :1500 gallons PLACED ABOVE SAS 98.5* PORT TO GRADE. 3 0.74'. GPD/sqft .MAX. COVER 594.6 sgft.. T035' A PLAYER r .a 9" MIN. Total Chambers 12 9" MIN. I=98.6 Effective SAS Area =96 if x 6.7 sfAf. 633.2 sq.ft ® 476.0 GPD MAX.COVER B LAYER I = 96.43 <. C LAYER r3" W MIN. MIN. 12 CULTEC FIELD DRAIN C4 CHAMBERS .DISTRIBUTION B I T� &"MIN. WMIN. (H-10) 32' - - 10'MIN.ZABLE i SOIL ABSORPTION SYSTEM (SAS): BOB '- 3 X 4 (12) CULTEC C4 CHAMBERS FILTER 12'Wx32'Lx8.5"H a .12°M z / o g ( 12 MAX, m LEGEND j 72.r -•V WATERSURFACI ELEVATION .r GAS BAFFLE C SYSTEM PROFILE � . 1500 GALLON NOT TO SCALE `o 1- COMP. SEPTIC TANK M-10) a h DESIGN CALCULATIONS Location 48edroomsx UOGPD/Bedroom 440 GPD SEPTICTANK(Per 310CMR1S.233) N'sewennvert-@foundation (West) Single Compartment: 2 Days Flow 8110. gallons MmumumTotal Volume: :1500 gallons SOILABSORPfION SYSTEM: 4''@D -box. in Loading:Rate (310CMR.15): 0.74'. GPD/sqft Area= 440GPD/ U74GPD/sq ft 594.6 sgft.. -Select CultecC-4 HD ChambersrBed Confiigurat)on- Cultec C-4 Chambers area MassDEP I/A Technology approved for Remedial Use. Assumed 6.7 sq ft per lin: Ft Total Chambers 12 Unearfeet of chambers =.12 x8 ft 96.0 Lin. ft Effective SAS Area =96 if x 6.7 sfAf. 633.2 sq.ft Flow=Area x 0.74GPD/sq It 476.0 GPD Schedule of Invert Elevations Location Design As -built Wsewer invert @foundation (north) 98.26 N'sewennvert-@foundation (West) 98.83: 4' septic tank in 97.36. Ir'sepbc tank out 97.11 4''@D -box. in 96.50 3"@Dboxout 96.33 3"@SAS Chamberin 95.94 Top of System (TOS) 95.40 Bottomof System(BOS) 95.69 COPYRIGHT 2022 - Roble) Water Ltd. This document and the ideas and design concepts incorporated herein, as an instrument of professional service, can not be used, in whole or in part for this or any other project, without the written authorization of Robiel Water Ltd PROJECT No. t5s.2022.003 SHEET TITLE: SITE LAYOUT SYSTEM DESIGN SHEET SIZE: 18 IN. X24 IN. (ARCH C) DATE: 17 February 2022 SHEET NUMBER: SHEET 1 of 1 L PROJECT: RESIDENTIAL ONSITE WASTEWATER TREATMENT SYSTEM REMEDIAL USE 95 Pond Street Yarmouth, MA