Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST / Location: A.M. 70 Lot (P2 Zone of Contribution: In Out " Acreage (0.6,-c':1-- s F-- Commercial: Residential: +V Street: 6- ce c ' _ -E- �,v e_A-c.; ,,e,c, Village: 52:5-c.,77-/ Floor Plan: " #Bedrooms: 3 Owner: 0 .c-'v Installer: N t--I-n Address: Phone: Phone: Builder: Engineer: d-'(&- � Address: Phone: Phone: N/A YES NO 1. Required#of copies received t/ 2. Date of soils exam and percolation test not older than 2 years 3.4-5 ft of naturally occurring pervious material,above water table / 4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: / 5.Water line 10 ft from septic components Var.: 6. Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: / 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: / 9.Leaching minimum 100 ft from wetlands Var.: / 10. Leaching minimum 150 ft from drinking wel1/25 ft irrigation well Var.: 7 11.Tank/leaching minimum 10 ft from property line Var.: 12. System meets all other setback requirements Var.: / 13. Uses adjustment for maximum high groundwater Var.: I 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: 7/ 15. System not in top or subsoil(A,B horizons)or 5' removal V 16.Proposed contours are suitable 17. System meets slope requirements-min. 1/8", 1/"preferred 18. System meets breakout requirements PVC liner: Wall: ✓/ 19. Specified tee sizes are proper, gas baffle on outlet tee 20. Sewage is under 10,000 gpd for parcel ✓ 21.No garbage disposal 22. System adequately sized for its intended use t . 23.Minimum 6"stone or compacted below tank and dbox i 24.Manhole covers within 6"of grade,pump chamber cover to grade V 25. Inspection port on plastic chambers/leach field ✓ 26. Electrical permit for pump chamber/Separate meter for duplexes / 27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size f 28. Septic tank/pump chamber to be factory waterproofed ,/ 29. Vent provided if leaching below 3 feet,under driveway/parking ✓ 30. Buoyancy calculations for tank/pump chamber J 31. Engineer to inspect and certify soils: wall: commercial: V 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33.H-20 loading is subject to vehicular traffic, groundwater .,/ 34.Title V Application and permit fee, installer signature 35. Foundation footing min. 2 feet above adjusted ground water for new house 36.Deed Restriction required max. #bedrooms: max. flow: gpd ✓ 37. Check area lots for groundwater/Label groundwater in Assessor's Map t/ Plan reviewed by:__`�4 - 5 / 13_f 2,21 6 0.3 01