HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST /
Location: A.M. 70 Lot (P2 Zone of Contribution: In Out " Acreage (0.6,-c':1-- s F--
Commercial: Residential: +V
Street: 6- ce c ' _ -E- �,v e_A-c.; ,,e,c,
Village: 52:5-c.,77-/ Floor Plan: " #Bedrooms: 3
Owner: 0 .c-'v Installer: N t--I-n
Address: Phone:
Phone:
Builder: Engineer: d-'(&- �
Address: Phone:
Phone:
N/A YES NO
1. Required#of copies received t/
2. Date of soils exam and percolation test not older than 2 years
3.4-5 ft of naturally occurring pervious material,above water table /
4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: /
5.Water line 10 ft from septic components Var.:
6. Benchmark indicated and shown-NGVD if near wetlands
7. Septic tank minimum 10 ft from foundation, deck Var.: /
8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: /
9.Leaching minimum 100 ft from wetlands Var.: /
10. Leaching minimum 150 ft from drinking wel1/25 ft irrigation well Var.: 7
11.Tank/leaching minimum 10 ft from property line Var.:
12. System meets all other setback requirements Var.: /
13. Uses adjustment for maximum high groundwater Var.: I
14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: 7/
15. System not in top or subsoil(A,B horizons)or 5' removal V
16.Proposed contours are suitable
17. System meets slope requirements-min. 1/8", 1/"preferred
18. System meets breakout requirements PVC liner: Wall: ✓/
19. Specified tee sizes are proper, gas baffle on outlet tee
20. Sewage is under 10,000 gpd for parcel ✓
21.No garbage disposal
22. System adequately sized for its intended use t .
23.Minimum 6"stone or compacted below tank and dbox i
24.Manhole covers within 6"of grade,pump chamber cover to grade V
25. Inspection port on plastic chambers/leach field ✓
26. Electrical permit for pump chamber/Separate meter for duplexes /
27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size f
28. Septic tank/pump chamber to be factory waterproofed ,/
29. Vent provided if leaching below 3 feet,under driveway/parking ✓
30. Buoyancy calculations for tank/pump chamber J
31. Engineer to inspect and certify soils: wall: commercial: V
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature
33.H-20 loading is subject to vehicular traffic, groundwater .,/
34.Title V Application and permit fee, installer signature
35. Foundation footing min. 2 feet above adjusted ground water for new house
36.Deed Restriction required max. #bedrooms: max. flow: gpd ✓
37. Check area lots for groundwater/Label groundwater in Assessor's Map t/
Plan reviewed by:__`�4 - 5 / 13_f 2,21 6 0.3 01