Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. Lot Zone of Contribution: In Out Acreage Commercial: Residential: Street: T1- tvWk (,Q Village: Floor Plan: # Bedrooms: Owner: Installer: Q. W,A-,Pl Address: Phone: Phone: Builder' Engineer: Address: Phone: Phone: N/A YES I NO I 1.Required# of copies received ✓ 1 2. Date of soils exam and percolation test not older than 2 years 3. 4-5 ft of naturally occurring pervious material, above water table 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: V 5. Water line 10 ft from septic components Var.: 6. Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: 5i 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 9. Leaching minimum 100 ft from wetlands Var.: 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11. Tank/leaching minimum 10 ft from property line Var.: 12. System meets all other setback requirements Var.: 13. Uses adjustment for maximum high groundwater Var.: 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: 15. System not in top or subsoil(A,B horizons) or 5' removal 16. Proposed contours are suitable 17. System meets slope requirements-min. 1/8", 1/4" preferred 18. System meets breakout requirements PVC liner: Wall: 19. Specified tee sizes are proper, gas baffle on outlet tee ✓ 20. Sewage is under 10,000 gpd for parcel 21.No garbage disposal ✓v • 22. System adequately sized for its intended use • 23. Minimum 6"stone or compacted below tank and dbox V 24. Manhole covers within 6"of grade, pump chamber cover to grade 25. Inspection port on plastic chambers/leach field 26. Electrical permit for pump chamber/Separate meter for duplexes 27. Pump system-2" line,weep hole,check valve, tee in dbox, pump size ✓ 28. Septic tank/pump chamber to be factory waterproofed 29. Vent provided if leaching below 3 feet, under driveway/parking / 30. Buoyancy calculations for tank/pump chamber V 31. Engineer to inspect and certify soils: wall: commercial: 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature V . 33. H-20 loading is subject to vehicular traffic, groundwater / Z- 34. Title V Application and permit fee, installer signature 35. Foundation footing min. 2 feet above adjusted ground water for new house 36. Deed Restriction required max. #bedrooms: max. flow: gpd f 37. Check area lots for groundwater/Label groundwater in Assessor's Map ✓ Plan reviewed by: MA/4 NO3/Oi