HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. 71 Lot 14 k Zone of Contribution: In Out Acreage t7 "39 i ± SP
Commercial: Residential: 1.----
Street:
Street: c 1 S-r-1_,73 Let' R -c,
Village: Floor Plan: it)e-, #Bedrooms: 3
Owner: Installer:
Address: Phone:
Phone:
Builder: Engineer: 6-----e-® - -14
Address: Phone:
Phone:
N,/A YES NO
1. Required#of copies received
2. Date of soils exam and percolation test not older than 2 years V
3. 4-5 ft of naturally occurring pervious material,above water table ✓
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: /
5. Water line 10 ft from septic components Var.: ✓
6.Benchmark indicated and shown-NGVD if near wetlands TG F
7. Septic tank minimum 10 ft from foundation, deck Var.: /
8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: ✓
9. Leaching minimum 100 ft from wetlands Var.: /
10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: ,/
11.Tank/leaching minimum 10 ft from property line Var.: ./
12. System meets all other setback requirements Var.: ,i
13. Uses adjustment for maximum high groundwater Var.: V
14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: ,/
15. System not in top or subsoil(A,B horizons)or 5' removal ✓
16. Proposed contours are suitable /
17. System meets slope requirements-min. 1/8", 'A"preferred V
18. System meets breakout requirements PVC liner: Wall: /
19. Specified tee sizes are proper, gas baffle on outlet tee ,/
20. Sewage is under 10,000 gpd for parcel
21.No garbage disposal
V
22. System adequately sized for its intended use v
23.Minimum 6"stone or compacted below tank and dbox ,i
24. Manhole covers within 6"of grade,pump chamber cover to grade ✓
25. Inspection port on plastic chambers/leach field ,/
26. Electrical permit for pump chamber/Separate meter for duplexes ✓
27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size ✓
28. Septic tank/pump chamber to be factory waterproofed ✓
29. Vent provided if leaching below 3 feet,under driveway/parking ✓
30.Buoyancy calculations for tank/pump chamber /
31. Engineer to inspect and certify soils: wall: commercial: i
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature ,7
33.11-20 loading is subject to vehicular traffic, groundwater /
34.Title V Application and permit fee,installer signature
35. Foundation footing min. 2 feet above adjusted ground water for new house ./
36. Deed Restriction required max. #bedrooms: max. flow: gpd /
37. Check area lots for groundwater/Label groundwater in Assessor's Map ✓
Plan reviewed by: -er44r14
6Q;03