Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. 71 Lot 14 k Zone of Contribution: In Out Acreage t7 "39 i ± SP Commercial: Residential: 1.---- Street: Street: c 1 S-r-1_,73 Let' R -c, Village: Floor Plan: it)e-, #Bedrooms: 3 Owner: Installer: Address: Phone: Phone: Builder: Engineer: 6-----e-® - -14 Address: Phone: Phone: N,/A YES NO 1. Required#of copies received 2. Date of soils exam and percolation test not older than 2 years V 3. 4-5 ft of naturally occurring pervious material,above water table ✓ 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: / 5. Water line 10 ft from septic components Var.: ✓ 6.Benchmark indicated and shown-NGVD if near wetlands TG F 7. Septic tank minimum 10 ft from foundation, deck Var.: / 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: ✓ 9. Leaching minimum 100 ft from wetlands Var.: / 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: ,/ 11.Tank/leaching minimum 10 ft from property line Var.: ./ 12. System meets all other setback requirements Var.: ,i 13. Uses adjustment for maximum high groundwater Var.: V 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: ,/ 15. System not in top or subsoil(A,B horizons)or 5' removal ✓ 16. Proposed contours are suitable / 17. System meets slope requirements-min. 1/8", 'A"preferred V 18. System meets breakout requirements PVC liner: Wall: / 19. Specified tee sizes are proper, gas baffle on outlet tee ,/ 20. Sewage is under 10,000 gpd for parcel 21.No garbage disposal V 22. System adequately sized for its intended use v 23.Minimum 6"stone or compacted below tank and dbox ,i 24. Manhole covers within 6"of grade,pump chamber cover to grade ✓ 25. Inspection port on plastic chambers/leach field ,/ 26. Electrical permit for pump chamber/Separate meter for duplexes ✓ 27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size ✓ 28. Septic tank/pump chamber to be factory waterproofed ✓ 29. Vent provided if leaching below 3 feet,under driveway/parking ✓ 30.Buoyancy calculations for tank/pump chamber / 31. Engineer to inspect and certify soils: wall: commercial: i 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature ,7 33.11-20 loading is subject to vehicular traffic, groundwater / 34.Title V Application and permit fee,installer signature 35. Foundation footing min. 2 feet above adjusted ground water for new house ./ 36. Deed Restriction required max. #bedrooms: max. flow: gpd / 37. Check area lots for groundwater/Label groundwater in Assessor's Map ✓ Plan reviewed by: -er44r14 6Q;03