HomeMy WebLinkAboutBP sign off 5.19.2022BE OUT
Building Site Location:e (R
Map # - .sz3 Q"'c.tlH?
PropBrty Owner:S
Town of Yarmouth
Gonservation Commission
Building Permit Sign-off Application
PPL
Lot(s)#lu
Date filed:2?.
t,,\\{s I L
ConseNation Office
koranl@varmoulh.ma. us
'Applicant:-Jr}.'..t\l-{\$L
Applicant Adaress: H? l..Jo'..v \,^,..1 n\\R.l" S*L4 cv..'orr\L..0166q
'MAY ls 2022
3
emait: B dI (
Proposed Piqoct Description, U1 *,,\r.\\ P.otorrrt (<q\,.
Q2))
Site Plan Tite/Date:
f1^'.uft.C\rr.ol [""-.c oh Lo\ 16
p\o-....
3 3o 20zz OLA a &si
t
Does the proposed project requiro a perm ft? 1t5
Referto: SeAe- ,12'.tr (or DOA permit
Comments from Co nsewation Commission: Approved ndition
u brlr"^+^'
ally Approved Rejected
Consen/atlon Commission Sign-off Signalure:*t' sltq\ LoLo
.TO APPLICANT:
AII work-related debris shall be taken offsite or disposed in a legal upland location. At the end of eachday, the area shall be clean and no debris shall be in the Resource Area.
lf work is permitted under an Order of Conditions, please arrange a pre-construction site visit with theConservation Administrator. At the time of site visit, the MassDEP File Number sign must be installed,
along with the erosion controlArork-limit line. A copy of the Order of Conditions -musl remain on-site
during construction. Please refer to the order of conditions for further details.
n
rvat ion
renpnone: 1l{ --la? .J}\?