Loading...
HomeMy WebLinkAboutEngineer Certification Letter Engineering Works, Inc. Civil Engineers-Surveyors-Soil Evaluators 12 West Crossfield Road, Forestdale, MA 02644 Tel/fax (508)477-5313 Bruce Murphy - Health Director April 15, 2022 Yarmouth Board of Health 1146 Route 28 South Yarmouth, MA 02664 Re: 8A & 8B John's Path, West Yarmouth - Septic Upgrade, Map ID: 33-186 Dear Mr. Murphy, As per your request and in accordance with 310 CMR 15.021(3) of the State Environmental Code-Title 5, an as-built review of the septic system at the subject site has been conducted. I hereby certify that the Sanitary Subsurface Disposal System has been installed in substantial compliance with the design plan by Engineering Works, Inc. & JC Engineering, Inc., dated 1/18/22, revised 2/25/22. The septic system consists of a new 2500 gallon H-20 2-compartment septic tank. 1000 gallon H-10 pump chamber, a new H-20 D-box and 4 rows of 5, Cultec C4-HD Field Drain units , as shown on the plan. Should you have any questions, please do not hesitate to call. Sincerely, Peter T. McEntee P.E. RECEIVED APR 2 0 2022 HEALTH DEPT.