HomeMy WebLinkAboutEngineer Certification Letter Engineering Works, Inc.
Civil Engineers-Surveyors-Soil Evaluators
12 West Crossfield Road, Forestdale, MA 02644 Tel/fax (508)477-5313
Bruce Murphy - Health Director April 15, 2022
Yarmouth Board of Health
1146 Route 28
South Yarmouth, MA 02664
Re: 8A & 8B John's Path, West Yarmouth - Septic Upgrade, Map ID: 33-186
Dear Mr. Murphy,
As per your request and in accordance with 310 CMR 15.021(3) of the State
Environmental Code-Title 5, an as-built review of the septic system at the subject site
has been conducted. I hereby certify that the Sanitary Subsurface Disposal System
has been installed in substantial compliance with the design plan by Engineering
Works, Inc. & JC Engineering, Inc., dated 1/18/22, revised 2/25/22. The septic system
consists of a new 2500 gallon H-20 2-compartment septic tank. 1000 gallon H-10 pump
chamber, a new H-20 D-box and 4 rows of 5, Cultec C4-HD Field Drain units , as shown
on the plan.
Should you have any questions, please do not hesitate to call.
Sincerely,
Peter T. McEntee P.E.
RECEIVED
APR 2 0 2022
HEALTH DEPT.