Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. -cfg Lot 9 7 Zone of Contribution: In_ Out J Acreage �t �I'�T�� 4::&ex f Commercial: Residential: L Street: 7 i 9 / Village: l,�) ((al.-14.4,04i Floor Plan: �/ # Bedrooms: l/ 1 Owner: Ai ' X Installer: ,7-1 /4- Address: r4 Address: ` Phone: Phone: Builder: Engineer: k/14 a6-/10--C Address: Phone: '7 S 17U� Phone: I ve wov c I /d -- •> / f , • N/A YES Ng 1.Required#of copies received ` _ 2. Date of soils exam and percolation test not older than 2 years i. 3. 4-5 ft of naturally occurring pervious material, above water table (/ 4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: L------- 5. Water line 10 ft from septic components Var.: _ 6. Benchmark indicated and shown-NGVD if near wetlands lam/ 7. Septic tank minimum 10 ft from foundation, deck Var.: L/ 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: k,.-� 9. Leaching minimum 100 ft from wetlands Var.: l./ _ 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: L...---- 11. .�11. Tank/leaching minimum 10 ft from property line Var.: _ 12. System meets all other setback requirements Var.: . 13. Uses adjustment for maximum high groundwater Var.: 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: 15. System not in top or subsoil(A,B horizons) or 5' removal .i/- 16. 16.Proposed contours are suitable L/ 17. System meets slope requirements-min. 1/8", '/a"preferred /� 18. System meets breakout requirements PVC liner: e- .Wall: ( . 19. Specified tee sizes are proper, gas baffle on outlet tee t/ 20. Sewage is under 10,000 gpd for parcel t.. 21.No garbage disposal 1. 22. System adequately sized for its intended use 23.Minimum 6"stone or compacted below tank and dbox ✓_ 24. Manhole covers within 6"of grade,pump chamber cover to grade 25. Inspection port on plastic chambers/leach field L/ 26. Electrical permit for pump chamber/Separate meter for duplexes 27.Pump system-2" line,weep hole,check valve,tee in dbox, pump size 28. Septic tank/pump chamber to be factory waterproofed �� 29. Vent provided if leaching below 3 feet, under driveway/parking 30. Buoyancy calculations for tank/pump chamber 31. Engineer to inspect and certify soils: wall: commercial: _----- 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33. H-20 loading is subject to vehicular traffic, groundwater _-�` 34. Title V Application and permit fee, installer signature 35.Foundation footing min. 2 feet above adjusted ground water for new house 36. Deed Restriction required max. #bedrooms: max. flow: gpd 37. Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: 6/03/03