HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. -cfg Lot 9 7 Zone of Contribution: In_ Out J Acreage
�t �I'�T�� 4::&ex f Commercial: Residential: L
Street: 7 i 9 /
Village: l,�) ((al.-14.4,04i Floor Plan: �/ # Bedrooms: l/
1
Owner: Ai ' X Installer: ,7-1 /4-
Address:
r4
Address: ` Phone:
Phone:
Builder: Engineer: k/14 a6-/10--C
Address: Phone: '7 S 17U�
Phone: I ve wov c I /d -- •> / f ,
•
N/A YES Ng
1.Required#of copies received `
_ 2. Date of soils exam and percolation test not older than 2 years i.
3. 4-5 ft of naturally occurring pervious material, above water table (/
4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: L-------
5. Water line 10 ft from septic components Var.:
_ 6. Benchmark indicated and shown-NGVD if near wetlands lam/
7. Septic tank minimum 10 ft from foundation, deck Var.: L/
8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: k,.-�
9. Leaching minimum 100 ft from wetlands Var.: l./ _
10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: L...----
11.
.�11. Tank/leaching minimum 10 ft from property line Var.: _
12. System meets all other setback requirements Var.: .
13. Uses adjustment for maximum high groundwater Var.:
14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.:
15. System not in top or subsoil(A,B horizons) or 5' removal .i/-
16.
16.Proposed contours are suitable L/
17. System meets slope requirements-min. 1/8", '/a"preferred /�
18. System meets breakout requirements PVC liner: e- .Wall: ( .
19. Specified tee sizes are proper, gas baffle on outlet tee t/
20. Sewage is under 10,000 gpd for parcel t..
21.No garbage disposal 1.
22. System adequately sized for its intended use
23.Minimum 6"stone or compacted below tank and dbox ✓_
24. Manhole covers within 6"of grade,pump chamber cover to grade
25. Inspection port on plastic chambers/leach field L/
26. Electrical permit for pump chamber/Separate meter for duplexes
27.Pump system-2" line,weep hole,check valve,tee in dbox, pump size
28. Septic tank/pump chamber to be factory waterproofed ��
29. Vent provided if leaching below 3 feet, under driveway/parking
30. Buoyancy calculations for tank/pump chamber
31. Engineer to inspect and certify soils: wall: commercial: _-----
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature
33. H-20 loading is subject to vehicular traffic, groundwater _-�`
34. Title V Application and permit fee, installer signature
35.Foundation footing min. 2 feet above adjusted ground water for new house
36. Deed Restriction required max. #bedrooms: max. flow: gpd
37. Check area lots for groundwater/Label groundwater in Assessor's Map
Plan reviewed by: 6/03/03