Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. Lot Zone of Contribution: Ir Out_ Acreage i Za 0 Wit(V 1 �1"L -4tCommercial: Residential: Street: Village: Floor Plan: # Bedrooms: Owner: Installer: T- Wet/6v Address: Phone: Phone: Builder: Engineer: M orit "7 Fill . 45C06 . Address: Phone: Phone: N/AYES NO I.Required# of copies received ✓ 2. Date of soils exam and percolation test not older than 2 years 3. 4-5 ft of naturally occurring pervious material, above water table tifit/ 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: 5. Water line 10 ft from septic components Var.: V 6. Benchmark indicated and shown-NGVD if near wetlands - 7. Septic tank minimum 10 ft from foundation, deck Var.: V f 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: ✓ 9. Leaching minimum 100 ft from wetlands Var.: V 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: ./ 11. Tank/leaching minimum 10 ft from property line Var.: ,/ 12. System meets all other setback requirements Var.: t/ 13. Uses adjustment for maximum high groundwater Var.: ✓ 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: 15. System not in top or subsoil(A,B horizons) or 5' removal i- 16. Proposed contours are suitable I/ 17. System meets slope requirements-min. 1/8", '/"preferred 18. System meets breakout requirements PVC liner: Wall: 19. Specified tee sizes are proper, gas baffle on outlet tee ✓ 20. Sewage is under 10,000 gpd for parcel ✓ 21. No garbage disposal 22. System adequately sized for its intended use tf 23. Minimum 6"stone or compacted below tank and dbox 24.Manhole covers within 6" of grade, pump chamber cover to grade 25. Inspection port on plastic chambers/leach field 26. Electrical permit for pump chamber/Separate meter for duplexes ,/ 27.Pump system-2" line,weep hole,check valve, tee in dbox,pump size t/- 28. Septic tank/pump chamber to be factory waterproofed 29. Vent provided if leaching below 3 feet, under driveway/parking ," 30. Buoyancy calculations for tank/pump chamber 31. Engineer to inspect and certify soils: wall: commercial: 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature ✓ 33. 1-1-20 loading is subject to vehicular traffic, groundwater .. 34. Title V Application and permit fee, installer signature I.,"" Foundation footing min. 2 feet above adjusted ground water for new house CP i eed Restriction required max. Z. #bedrooms: max. flow: gpd ✓ ek. f; 7. Check area lots for oundwater/Label oundwater in Assessor's Map Plan reviewed by: 6/03/03