FIELD REPORT
RJK discussed the issues with PE, CB, and Beacon on site.
Work Observed
• Air and Vapor Barrier (AVB) Installation
• Window Installation
• Roofing Installation
Observations
• On the Part B, south elevation rising walls, Grid Lines A2 - B13, GCP Perm-A-Barrier Aluminum AVB
was installed by Beacon prior to RJK observations. Primer/adhesive was applied to the DensGlass
Sheathing. The membrane was installed in a water shedding fashion, with a minimum 2 inch side lap
and 10 inch lap around outside corners, as required. (Figure 1)
• On the Part B, north, east, and south elevation rising walls, Grid Lines B25 - B33, GCP Perm-A-Barrier
NPL 10 was spray applied at the concrete block prior to RJK observations. (Figure 2)
• On Part B, south elevation, Grid Lines A2 - B13, window rough openings were detailed into the AVB
prior to RJK observations. A strip of AVB was installed extending past the jamb and onto the exterior
sheathing. The horizontal field sheets were run into the jambs in water shedding fashion. A head strip
was then installed lapping over the jamb strips, as required. (Figure 3)
• On Part B, south elevation, Grid Lines A22 - B29, window flanges are stripped in utilizing self-adhered
aluminum flashing in a water shedding fashion. Dow Sil 795 sealant was applied to the membrane
edges. (Figure 4)
• On Part B, south elevation, Grid Lines A22 - B29, bent plates were installed below windows, set in Dow
Sil 795 sealant, and fastened utilizing screws. (Figure 5)
Project: Q504 - Mattacheese, Dennis-Yarmouth Intermediate
Middle School Report Number: FR-8
Property Address: 276 Station Avenue, South Yarmouth, MA 02664
Client: Perkins Eastman
Date of Site Visit: Thursday, May 12, 2022
Report Date: Monday, May 16, 2022
Weather: Fog-Partly Cloudy 56 - 65 °F
Purpose of Visit: Observe Building Enclosure Construction
On-Site During Visit:
Michael Groome - R. J. Kenney Associates, Inc. (RJK)
Andrew Hazelton - Perkins Eastman (PE)
Paul Genereux - Commodore Builders (CB)
Ryan DeRico - CB
Ken - Beacon Waterproofing and Restoration Inc (Beacon)
Report By: Michael Groome
Report Attachments: Detailed Photographs
Q504 - Mattacheese, Dennis-Yarmouth Intermediate Middle School
Report Number FR-8
5/16/2022
Report Narrative
G:\RJK\WORD\31810 Q504 Mattacheese DYIMS Yarmouth FR8 Report 5-12-22.docx Page 2 of 13
• On Part B, east and north elevation, Grid Lines P.1-J, Kawneer 1600IR curtain wall systems were
installed, fastened to the rough opening through F anchors and T anchors. (Figures 6, 7)
• On Part B, south and east elevations, Grid Lines A17 - B33, insulated glazing units (IGU) were installed
in the Kawneer 1600IR curtain wall systems, utilizing final pressure plates in the field of the system and
temporary pressure plates at the perimeter. (Figure 8)
• On Part B, south elevation, Grid Lines A17 - B21, aluminum brake metal back pans were installed in the
curtain wall framing utilizing clips. Dow Sil 795 application was in progress at the perimeter of the
panels. (Figure 9)
• On Part B, south elevation, Grid Lines A17 - B21, ELBEX HS-222 Silicone Transition Sheet was
installed at curtain wall frames, lapping into the glazing pocket and onto the vertical AVB membrane
and installed in water shedding fashion between strips at the head, jambs, and sill. Dow Sil 795 Sealant
was applied to the edges of the membrane at the wall and glazing pocket. (Figure 10)
• On Part B, east elevation rising walls, Grid Lines J - J.7, Hohmann & Bernard Thermal 2-Seal Wing Nut
Anchors are installed through 6 inch John Mansville MinWool-1200. (Figure 11)
• On Part B, south elevation rising walls, Grid Lines B25 - B33, Hohmann & Bernard Thermal 2-Seal
Wing Nut Anchors are installed through 2 inch extruded polystyrene insulation. Precast concrete bases
were installed onto the foundation supported by the masonry anchors. (Figure 12)
• On Part B, south elevation base detail, solid grout fill was installed between precast concrete bases and
extruded polystyrene insulation. (Figure 13)
• On Part B, south elevation rising walls, Grid Lines B25 - B33, Knight MFI ThermaBracket S-Series
wall ties were installed, fastened utilizing screws, and wet set in GCP Perm-A-Barrier S100 Sealant.
(Figure 14)
• On Part D, north elevation rising wall, Grid Lines D6 - D21, LYMO 2000 ACM panels were installed,
fastened utilizing panel clips to horizontal GreenGirt. (Figure 15)
• On Part D, north and west elevation rising walls, Grid Lines D1 - D5, Rieder Öko Skin high
performance cementitious wall panels were installed, fastened utilizing screws to the horizontal
galvanized hat channel. (Figure 16)
• On Part B, Gymnasium Roof, Grid Lines B24 - B25, Sika Sarnafil G 410-80 EnergySmart PVC Roof
Membrane base flashing was adhered to parapet walls utilizing Sika Sarnacol-2170 VC Adhesive. The
membrane was laid out adhesive roller applied to the back of the membrane and to the parapet wall and
was then allowed to tack off. The membrane was flown into place and pressed in utilizing a silicone
roller. (Figure 17)
• On Part B, Gymnasium Roof, Grid Lines B24 - B25, Sika Sarnafil G 410-80 EnergySmart PVC Roof
Membrane base flashing was heat welded to the field membrane utilizing a hand welder and pressed in
utilizing a silicone roller to promote adhesion. Prior to welding, the field membrane was cleaned
utilizing membrane cleaner and rags.
• On Part B, Gymnasium Roof, Grid Lines B24 - B25, T-joint patches were heat welded to the field
membrane utilizing a hand welder and pressed in utilizing a silicone roller to promote adhesion.
(Figure 18)
Q504 - Mattacheese, Dennis-Yarmouth Intermediate Middle School
Report Number FR-8
5/16/2022
Report Narrative
G:\RJK\WORD\31810 Q504 Mattacheese DYIMS Yarmouth FR8 Report 5-12-22.docx Page 3 of 13
Discussion Items
Air Barrier
8.1 Missing AVB - Part B, Level 1, Rising Wall to Parapet Transition - Self-adhered membrane does not
fully cover the exterior sheathing gypsum and parapet nailer. Apply new materials to create a
continuous building enclosure. (Figure 19)
8.2 Discontinued AVB at Curtain Wall Column - Part B, East Elevation Rising Wall, Grid Lines M.9-L -
The steel columns between curtain wall are not detailed utilizing self-adhered air barrier membrane per
Detail 12 on A-6.10. (Figure 8)
Brick Cladding
8.3 Missing Insulation Behind Brick - Part B, North Elevation Rising Wall, Grid Lines B32 - A section of
mineral wool insulation is missing from the wall behind the installed masonry cladding. (Figure 11)
Roofing
8.4 Roof Discontinuation Between Vapor Barrier and PVC Membrane - Part B, Gymnasium Roof, Grid
Lines B24 - B25 - No vapor barrier was observed lapping onto the parapet wall to contact the back of
the roof membrane, creating a void in the building enclosure. (Figure 20)
END OF REPORT
RJK has no contractual responsibility in the design or actual construction of the project and is acting solely in a consultant and/or in an
advisory capacity to the Client. Any and all modifications, changes, recommendations, suggestions, etc., relating to the design and/or
construction, should be forwarded, reviewed, and approved by the designer of record prior to implementation. RJK reserves the right
to change or amend this report as new information becomes available.
Q504 - Mattacheese, Dennis-Yarmouth Intermediate Middle School
Report Number FR-8
5/16/2022
Appendix A
G:\RJK\WORD\31810 Q504 Mattacheese DYIMS Yarmouth FR8 Report 5-12-22.docx Page 4 of 13
Callouts:
Comments:
0512 028 R. J. Kenney Associates, Inc.
Figure 1 ‐ Sheet-Applied AVB
Callouts:
1. GCP Perm-A-Barrier
NPL 10
Comments:
0512 050 & 0512 062 R. J. Kenney Associates, Inc.
Figure 2 ‐ Spray Applied AVB
1
1
Q504 - Mattacheese, Dennis-Yarmouth Intermediate Middle School
Report Number FR-8
5/16/2022
Appendix A
G:\RJK\WORD\31810 Q504 Mattacheese DYIMS Yarmouth FR8 Report 5-12-22.docx Page 5 of 13
Callouts:
Comments:
0512 020 R. J. Kenney Associates, Inc.
Figure 3 ‐ AVB Rough Opening Detailing
Callouts:
Comments:
0512 005 R. J. Kenney Associates, Inc.
Figure 4 ‐ Window Flange Detailing
Q504 - Mattacheese, Dennis-Yarmouth Intermediate Middle School
Report Number FR-8
5/16/2022
Appendix A
G:\RJK\WORD\31810 Q504 Mattacheese DYIMS Yarmouth FR8 Report 5-12-22.docx Page 6 of 13
Callouts:
Comments:
0512 006 R. J. Kenney Associates, Inc.
Figure 5 ‐ Lentil Under Window
Callouts:
Comments:
0512 080 R. J. Kenney Associates, Inc.
Figure 6 ‐ Curtain Wall Installation
Q504 - Mattacheese, Dennis-Yarmouth Intermediate Middle School
Report Number FR-8
5/16/2022
Appendix A
G:\RJK\WORD\31810 Q504 Mattacheese DYIMS Yarmouth FR8 Report 5-12-22.docx Page 7 of 13
Callouts:
1. “F” Anchor
2. “T” Anchor
Comments:
0512 082 & 0512 081 R. J. Kenney Associates, Inc.
Figure 7 ‐ Curtain Wall “F” and “T” Anchors
Callouts:
1. Columns to receive self-
adhered AVB membrane.
Comments:
0512 072 R. J. Kenney Associates, Inc.
Figure 8 ‐ Insulation Glazing Units in Curtain Wall
1
2
1
1
Q504 - Mattacheese, Dennis-Yarmouth Intermediate Middle School
Report Number FR-8
5/16/2022
Appendix A
G:\RJK\WORD\31810 Q504 Mattacheese DYIMS Yarmouth FR8 Report 5-12-22.docx Page 8 of 13
Callouts:
Comments:
0512 034 & 0512 033 R. J. Kenney Associates, Inc.
Figure 9 ‐ Aluminum Brake Metal Back Pans at Curtain Walls
Callouts:
Comments:
0512 037 R. J. Kenney Associates, Inc.
Figure 10 ‐ Silicone Transition Sheet
Q504 - Mattacheese, Dennis-Yarmouth Intermediate Middle School
Report Number FR-8
5/16/2022
Appendix A
G:\RJK\WORD\31810 Q504 Mattacheese DYIMS Yarmouth FR8 Report 5-12-22.docx Page 9 of 13
Callouts:
1. Hohmann & Bernard
Thermal 2-Seal Wing Nut
Anchors.
2. Missing insulation.
Comments:
0512 084 R. J. Kenney Associates, Inc.
Figure 11 ‐ Brick Ties and Wall Insulation
Callouts:
Comments:
0512 060 R. J. Kenney Associates, Inc.
Figure 12 ‐ Precast Concrete Bases
1
2
Q504 - Mattacheese, Dennis-Yarmouth Intermediate Middle School
Report Number FR-8
5/16/2022
Appendix A
G:\RJK\WORD\31810 Q504 Mattacheese DYIMS Yarmouth FR8 Report 5-12-22.docx Page 10 of 13
Callouts:
Comments:
0512 058 R. J. Kenney Associates, Inc.
Figure 13 ‐ Solid Grout Fill
Callouts:
1. GCP Perm-A-Barrier
S100 Sealant
Comments:
0512 056 R. J. Kenney Associates, Inc.
Figure 14 ‐ Knight MFI ThermaBracket S-Series
1
Q504 - Mattacheese, Dennis-Yarmouth Intermediate Middle School
Report Number FR-8
5/16/2022
Appendix A
G:\RJK\WORD\31810 Q504 Mattacheese DYIMS Yarmouth FR8 Report 5-12-22.docx Page 11 of 13
Callouts:
Comments:
0512 100 R. J. Kenney Associates, Inc.
Figure 15 ‐ LYMO 2000 ACM panels
Callouts:
Comments:
0512 110 R. J. Kenney Associates, Inc.
Figure 16 ‐ Rieder Öko Skin High Performance Cementitious Wall Panels
Q504 - Mattacheese, Dennis-Yarmouth Intermediate Middle School
Report Number FR-8
5/16/2022
Appendix A
G:\RJK\WORD\31810 Q504 Mattacheese DYIMS Yarmouth FR8 Report 5-12-22.docx Page 12 of 13
Callouts:
Comments:
0512 153 R. J. Kenney Associates, Inc.
Figure 17 ‐ Base Flashing at Parapet
Callouts:
Comments:
0512 155 R. J. Kenney Associates, Inc.
Figure 18 ‐ T-Joint Patches
Q504 - Mattacheese, Dennis-Yarmouth Intermediate Middle School
Report Number FR-8
5/16/2022
Appendix A
G:\RJK\WORD\31810 Q504 Mattacheese DYIMS Yarmouth FR8 Report 5-12-22.docx Page 13 of 13
Callouts:
1. Missing AVB membrane.
Comments:
0512 046 & 0512 048 R. J. Kenney Associates, Inc.
Figure 19 ‐ Missing AVB
Callouts:
Comments:
0512 151 R. J. Kenney Associates, Inc.
Figure 20 ‐ Roofing Vapor Barrier Not on Parapet
1