Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. '7-7 Lot I Zone of Contribution: In Out_ Acreage /5,2-S0 sa.-C-t-. G Commercial: Residential: Street: 03 Qvc.,, F'ex-ry)c ei .'__poi,J Village: SjUhH A - ,, YYvv.O LAA-L,_ Floor Plan: ../ #Bedrooms: Owner: -5-2--fir v� a.ey `a, LI`S? t.„..)1 I`�o t••- Installer: go b�ex-f- g O v(' Ga ✓ Address: $3 Cla r-t-c.v rvl a.g-1--r R O t,J Phone: (Sps-6) 9-7-) -s c�-7 Phone: --- 5-45)- 7 J / - '7a 6 2.._ - C 0 O 7 Builder: Engineer: T. C. E{-taty�,�.:nq 1 Address: Phone: (SO)2'73. 03'7"7 J Phone: N/A YES/ NO 0N 1.Required#of copies received ,/ 2.Date of soils exam and percolation test not older than 2 years ✓ U (-A-1- 3.4-5 ft of naturally occurring pervious material,above water table ✓ 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: t/ i Cv;) 5.Water line 10 ft from septic components Var.: t/ b Cn- 6.Benchmark indicated and shown-NGVD if near wetlands I ✓ 7. Septic tank minimum 10 ft from foundation,deck Var.: ✓ 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: S ' 6-1,4-A-- ...-- 9. 9.Leaching minimum 100 ft from wetlands Var.: ✓ 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: ✓ 11.Tank/leaching minimum 10 ft from property line Var.: V 12. System meets all other setback requirements Var.: V 13.Uses adjustment for maximum high groundwater Var.: V 14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.: V 15. System not in top or subsoil(A,B horizons)or 5'removal ,/ 16.Proposed contours are suitable / 17. System meets slope requirements-min. 1/8", %"preferred 18. System meets breakout requirements PVC liner: Wall: / _ 19. Specified tee sizes are proper, gas baffle on outlet tee V 20. Sewage is under 10,000 gpd for parcel f 21.No garbage disposal V 22. System adequately sized for its intended use 1/ 23.Minimum 6"stone or compacted below tank and dbox V 24.Manhole covers within 6"of grade,pump chamber cover to grade ./ 25. Inspection port on plastic chambers/leach field i 26. Electrical permit for pump chamber/Separate meter for duplexes ✓ 27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size ✓ 28. Septic tank/pump chamber to be factory waterproofed ✓ 29. Vent provided if leaching below 3 feet,under driveway/parking ✓ 30.Buoyancy calculations for tank/pump chamber / -- 31.Engineer to inspect and certify soils: wall: commercial: I / 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature V 33.H-20 loading is subject to vehicular traffic,groundwater s . 34.Title V Application and permit fee,installer signature 1 ✓ 35.Foundation footing min.2 feet above adjusted ground water for new house I ✓ 36.Deed Restriction required max. #bedrooms: max. flow: gpd 37. Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: ( 1 6 03 03