Loading...
HomeMy WebLinkAboutEngineer PlanPROFILE: NOT TO SCALE CRAWL SPACE �r MA MANHOLE COVERS AS REQUIRED - VG TO WITHIN 6 OF FINISH GRADE) /- 4" PVC SCH 40 t U 14"MIN. / TEE MIN. IC HIGH STRENGTH 1.0 "FAST" NEW 1500 GALLON SEPTIC PRECAST CONCRETE I/A H-20 SEPTIC TANK SOIL TEST PIT DATA: TEST PIT #1 FINISH GRADE EL=9A - 0 EXISTING GRADE 2" PVC FORCE MAIN rl 1,000 GALLON PRECAST CONCRETE H-20 PUMP CHAMBER SCALOR UV DISINFECTION UNIT MODEL 313 (SUPPLIED BY FAST) FINISH GRADE EL=9.2 1.5" PVC I=F LEVEL LEACHING FIELD 5' SEPARATION ADJUSTED GROUNDWATER = H TOWN OF YARMOUTH TO ALLOW THE SEPTIC TANK AND PUMP CHAMBER TO BE 36' FROM THE EDGE OF WETLANDS IN LIEU OF 50' TO ALLOW THE LEACHING FIELD TO BE 42' FROM EDGE OF WETLANDS IN LIEU OF 100'. (ON BOTH SIDES) F for..REPAIR OF SEPTIC SYSTEMo State and I-vai septic variances.th review and appsman is required for additionstrennc:,uun.faiteration, Io es and/or structure./d.relling. mouth health Dcp., Intent APPRON' L D sr&"A,&„' Name Date MAY 2 0 zQ22 HEAL'T`H DEPT. 1D. 14; y� DESIGN CRITERIA: .NOVEMBER. 30, 2006 0� 2� MARK U GRD. EL. 9.2 HIGH GROUNDWATER COMPUTATION EST. HIGH GW. 2.5 BASED ON MILL CREEK MHW MR INDICATES ELEV.=8.93 i LOAMY VARIANCES REQ. 10YR 3/1 9.7 OF HEALTH REGULATIONS. TITLE 5: PERC. LOAMY SAND FINISH GRADE 15.211: TEST GROUND WATER 5. WITHIN LIMIT OF EXCAVATION REMOVE EL=9.0 TO ALLOW THE PUMP CHAMBER AND SEPTIC TANK TO BE 9.2' EXISTING GRADE AND 8.7' RESPECTIVELY FROM THE GARAGE IN LIEU OF 10'. 10YR 7/4 D 50" EL = 2.5 - TO ALLOW THE LEACHING FIELD TO BE 42' FROM THE EDGE 1009 MUST PASS#4 SIEVE OF WETLANDS IN LIEU OF 50'. (ON BOTH SIDES) F (0.15 mm EFFECTIVE PARTICLE SIZE) TO ALLOW THE PUMP CHAMBER AND SEPTIC TANK TO BE 6.0' BOTTOM OF LEACH FIELD FROM THE WATER LINE IN LIEU OF 10'. GROUNDWATER ELEVATION 2.5 TO ALLOW THE LEACHING FIELD TO BE 3' FROM THE 1.2 ENGINEER DOES NOT GUARANTEE PROPERTY LINE IN LIEU OF 10'. UTILITIES AND SUBSURFACE STRUCTURES ARE SHOWN. LOCATIONS AND ELEVATIONS OF UNDERGROUND UTILITIES TOWN OF YARMOUTH TO ALLOW THE SEPTIC TANK AND PUMP CHAMBER TO BE 36' FROM THE EDGE OF WETLANDS IN LIEU OF 50' TO ALLOW THE LEACHING FIELD TO BE 42' FROM EDGE OF WETLANDS IN LIEU OF 100'. (ON BOTH SIDES) F for..REPAIR OF SEPTIC SYSTEMo State and I-vai septic variances.th review and appsman is required for additionstrennc:,uun.faiteration, Io es and/or structure./d.relling. mouth health Dcp., Intent APPRON' L D sr&"A,&„' Name Date MAY 2 0 zQ22 HEAL'T`H DEPT. 1D. 14; y� DESIGN CRITERIA: .NOVEMBER. 30, 2006 0� 2� MARK U GRD. EL. 9.2 HIGH GROUNDWATER COMPUTATION EST. HIGH GW. 2.5 BASED ON MILL CREEK MHW .1 DATE: TEST BY: THE BSC GROUP, INC. WITNESSED BY: AMY VON HONE PERC. RATE: 2 MIN./INCH SOIL EVALUATOR MARK DIBB SOIL CLASS: 0.74 G.P.D./SQ.FT. MR INDICATES ELEV.=8.93 i LOAMY SAND 10YR 3/1 9.7 OF HEALTH REGULATIONS. 3. ALL PIPES LOCATED UNDER PAVEMENT PERC. LOAMY SAND 10YR 6/6 TEST GROUND WATER 5. WITHIN LIMIT OF EXCAVATION REMOVE i INDICATES B EL = 8.0 A INDICATES y OBSERVED MEDIUM SAND 10YR 7/4 D 50" EL = 2.5 - EL = 1.2 .1 DATE: TEST BY: THE BSC GROUP, INC. WITNESSED BY: AMY VON HONE PERC. RATE: 2 MIN./INCH SOIL EVALUATOR MARK DIBB SOIL CLASS: 0.74 G.P.D./SQ.FT. 'a DIBB , c CIVIL y �~ . % 140.45997ft 30M EXISTING FLOW: BEDROOM 3 BEDROOM 4 d NOTE: A9t5A`@moo �Q 5 BEDROOMS AT 110 G.P.B./D 330 G.P.D. NOTE: 1,10 " r EXISTING SEPTIC COMPONENTS TO BE EXISTING GARBAGE DISPOSAL TO BE PUMPED, CLEAN FILLED OR REMOVED FROM SITE IN (ACCORDANCE WITH REMOVED FROM EXISTING KITCHEN DUE 47- TITLE 5. j °67 DESIGN FLOW' BATH TO RECOGNIZED ADVERSE INFLUENCE. O ON THE PROPOSED SEPTIC SYSTEM: /q� 5 BEDROOMS AT 110 G. P.B./D 330 G.P.D. h CO cws REQUIRED SEPTIC TANK: 0. 550 X 200% = 1100 GAL. SEPTIC TANK PROVIDED: = 1500 GAL. BEDROOM 5 � �� SIZE OF LEACHING FACILITY REQUIRED: w \ DESIGN PERC. RATE: <2 G MIN./ INCH LONG TERM APPL RATE 0.74 G.P.D/S. F. SECOND FLOOR \v D / /r NOTKTO NOT �V ����' / - sy A550 GPD T .0,74 GPD/SF = 743 S.F. T SHED \ T°F01- SIZE OF LEACHING FACILITY PROVIDED: JSE LEACHING FIELD BOTTOM 15",x 5b,-,_' 750 S.F 150'S,F X 0.74 GPD/SF555 GPD MHW AT TOE OF WALL ` /�� / \ \ (+6-bHPRRY' \� W \ 18" OAK 0 FULL "CHERRY \ \ FOUNDATION � BEDROOM 2 \ AREA 11'X`12' o\ \�\ \ LOCUS INFORMATION GARAGE \ ' 1 36.6' ' BEDROOM 1 `\ \ z PROPOSED "Uv" CURRENT OWNER: BARBARA J. PIERCE (qWITH H-20 42.0' ` \ \ tw COVER WALKWAY J / pv� Nv=s.3 \ \ TITLE REFERENCE: BOOK 16195, PAGE 299 PROPOSED 1500 00 / i INV=8.2\ \ BRICK GALLON H-20 REPL MB ALL SEWAGE IPA - \ - PATIO g PROPOSED 1000 I/A SEPTIC TANK j /- TO THIS OUTLET `y � BATH e � \ PLAN REFERENCE: BOOK 146, PAGE 135 GALLON H - 2O - PUMP CHAMBER 9 TO ASSESSORS MAP: 29 � � tP Z \ \ / w 35 B�Fi / 2 STORY yv \ \ PARCEL: 88 N/F o 4, 0µW W 8.7' / 7no WOOD FRAME \ 0" CHERRY DONNA LEA GAVIN BAKER q 9.0 9.2' 18.4' // \ \ ZONING DISTRICT: R-25 /� ,10.1' HOUSE #52 PANTRY ASSESSORS MAP 29 �.tW W _ �-r �' � SETBACKS: FRONT 30' roF=s.7 PARCEL 87 UP 9.3 nY m' SIDE 15' CB/LP 3 W /' 6.1' L U` Tf/.2' ➢n j { REAR 20' � 2"PVC _. SOS �P LIVING ROOM FIND W S Tr .2: �p KITCHEN \ / MINIMUM LOT SIZE: 25,000 4 8.8 GRAVEL EXISTING LOT AREA: 15,517±S.F. 10. ' DRIVEWAA 5/ \ DINING INV=7.` / / OVERLAY DISTRICT: NOT IN A ZONE 11 .� . WALyd ROOM -8 71 5106 K RA� (3) ® 9.4 PINE z A 1 10' _ FEMA FLOOD A-12 ELEV. 10 AS SHOWN ON - - - - - I 3' �p ®1 �. 2" f / ZONE DISTRICT: PANEL #250015 0005 D DATED 7/2/92 CF, gOFFER TO �_ SND_ " S R0D8.I A '� N �i A --� \ iX 9.9 N/F LOCUS PLAN: NO SCALE 32" WILLOW �- � BARBARA J. PIERCE � � l- 28 8.6 CB/DH g / - \ ASSESSORS MAP 29 \ W FND �C 8.7 y \ PARCEL 88 \ / / TH 1 15,517±S.F. 8.8 PROPED� / �pW 5 /°j / / X 28 N -� VF,�JT ��' pbF' PROPOSED 15x50' PRESSURE NOTE: DOSED LEACHING FIELD J 0/ EXISTING SEPTIC COMPONENTS TO BE A BENCH MARK: FO 5(P / / / FROMSITE NACCORDANCE WITH PUMPED, REMOVED m TOP OF CONCRETE BOUND \ �t \ ' / TITLE 5. ELEV. 8.93 NGVD OJ9 / 1 S/ sr°Csjr� ��y3 � \ 2.0' M/LL CREEK X 9.6 RID LOCUS ASSESSORS ILYTR . \ X 7.5 i i 'MHW AT TOE OF WAU PLAN VIEW PARCEL 89 9°0• SCALE: 1' 10 FEET LEW7S BAY 0 5 10 20 FT. REVISIONS MR INDICATES ELEV.=8.93 INVERT ELEVATIONS: DN INDICATES y ESTIMATED 9.7 OF HEALTH REGULATIONS. 3. ALL PIPES LOCATED UNDER PAVEMENT PERC. = SEASONAL HIGH A LOCATED WITHIN 150 FT. OF THE REPLUMB AND RELOCATE EXISTING PLUMBING TEST GROUND WATER 5. WITHIN LIMIT OF EXCAVATION REMOVE 4" INVERT AT SEPTIC TANK (IN) INDICATES B CLEAN GRANULAR SAND, FREE FROM ORGANIC A INDICATES y OBSERVED C NOT CONTAIN ANY MATERIAL LARGER THAN UNSUITABLE = GROUND WATER D BY WEIGHT OF THE FILL SAMPLE MAY BE MATERIAL 5.00 'a DIBB , c CIVIL y �~ . % 140.45997ft 30M EXISTING FLOW: BEDROOM 3 BEDROOM 4 d NOTE: A9t5A`@moo �Q 5 BEDROOMS AT 110 G.P.B./D 330 G.P.D. NOTE: 1,10 " r EXISTING SEPTIC COMPONENTS TO BE EXISTING GARBAGE DISPOSAL TO BE PUMPED, CLEAN FILLED OR REMOVED FROM SITE IN (ACCORDANCE WITH REMOVED FROM EXISTING KITCHEN DUE 47- TITLE 5. j °67 DESIGN FLOW' BATH TO RECOGNIZED ADVERSE INFLUENCE. O ON THE PROPOSED SEPTIC SYSTEM: /q� 5 BEDROOMS AT 110 G. P.B./D 330 G.P.D. h CO cws REQUIRED SEPTIC TANK: 0. 550 X 200% = 1100 GAL. SEPTIC TANK PROVIDED: = 1500 GAL. BEDROOM 5 � �� SIZE OF LEACHING FACILITY REQUIRED: w \ DESIGN PERC. RATE: <2 G MIN./ INCH LONG TERM APPL RATE 0.74 G.P.D/S. F. SECOND FLOOR \v D / /r NOTKTO NOT �V ����' / - sy A550 GPD T .0,74 GPD/SF = 743 S.F. T SHED \ T°F01- SIZE OF LEACHING FACILITY PROVIDED: JSE LEACHING FIELD BOTTOM 15",x 5b,-,_' 750 S.F 150'S,F X 0.74 GPD/SF555 GPD MHW AT TOE OF WALL ` /�� / \ \ (+6-bHPRRY' \� W \ 18" OAK 0 FULL "CHERRY \ \ FOUNDATION � BEDROOM 2 \ AREA 11'X`12' o\ \�\ \ LOCUS INFORMATION GARAGE \ ' 1 36.6' ' BEDROOM 1 `\ \ z PROPOSED "Uv" CURRENT OWNER: BARBARA J. PIERCE (qWITH H-20 42.0' ` \ \ tw COVER WALKWAY J / pv� Nv=s.3 \ \ TITLE REFERENCE: BOOK 16195, PAGE 299 PROPOSED 1500 00 / i INV=8.2\ \ BRICK GALLON H-20 REPL MB ALL SEWAGE IPA - \ - PATIO g PROPOSED 1000 I/A SEPTIC TANK j /- TO THIS OUTLET `y � BATH e � \ PLAN REFERENCE: BOOK 146, PAGE 135 GALLON H - 2O - PUMP CHAMBER 9 TO ASSESSORS MAP: 29 � � tP Z \ \ / w 35 B�Fi / 2 STORY yv \ \ PARCEL: 88 N/F o 4, 0µW W 8.7' / 7no WOOD FRAME \ 0" CHERRY DONNA LEA GAVIN BAKER q 9.0 9.2' 18.4' // \ \ ZONING DISTRICT: R-25 /� ,10.1' HOUSE #52 PANTRY ASSESSORS MAP 29 �.tW W _ �-r �' � SETBACKS: FRONT 30' roF=s.7 PARCEL 87 UP 9.3 nY m' SIDE 15' CB/LP 3 W /' 6.1' L U` Tf/.2' ➢n j { REAR 20' � 2"PVC _. SOS �P LIVING ROOM FIND W S Tr .2: �p KITCHEN \ / MINIMUM LOT SIZE: 25,000 4 8.8 GRAVEL EXISTING LOT AREA: 15,517±S.F. 10. ' DRIVEWAA 5/ \ DINING INV=7.` / / OVERLAY DISTRICT: NOT IN A ZONE 11 .� . WALyd ROOM -8 71 5106 K RA� (3) ® 9.4 PINE z A 1 10' _ FEMA FLOOD A-12 ELEV. 10 AS SHOWN ON - - - - - I 3' �p ®1 �. 2" f / ZONE DISTRICT: PANEL #250015 0005 D DATED 7/2/92 CF, gOFFER TO �_ SND_ " S R0D8.I A '� N �i A --� \ iX 9.9 N/F LOCUS PLAN: NO SCALE 32" WILLOW �- � BARBARA J. PIERCE � � l- 28 8.6 CB/DH g / - \ ASSESSORS MAP 29 \ W FND �C 8.7 y \ PARCEL 88 \ / / TH 1 15,517±S.F. 8.8 PROPED� / �pW 5 /°j / / X 28 N -� VF,�JT ��' pbF' PROPOSED 15x50' PRESSURE NOTE: DOSED LEACHING FIELD J 0/ EXISTING SEPTIC COMPONENTS TO BE A BENCH MARK: FO 5(P / / / FROMSITE NACCORDANCE WITH PUMPED, REMOVED m TOP OF CONCRETE BOUND \ �t \ ' / TITLE 5. ELEV. 8.93 NGVD OJ9 / 1 S/ sr°Csjr� ��y3 � \ 2.0' M/LL CREEK X 9.6 RID LOCUS ASSESSORS ILYTR . \ X 7.5 i i 'MHW AT TOE OF WAU PLAN VIEW PARCEL 89 9°0• SCALE: 1' 10 FEET LEW7S BAY 0 5 10 20 FT. REVISIONS DATUM: VERTICAL DATUM: ASSUMED BENCH MARK USED: RM 19 BENCH MARK SET: TOP OF CONCRETE BOUND ELEV.=8.93 INVERT ELEVATIONS: DISPOSAL FACILITY ONLY. 2. ALL CONSTRUCTION METHODS AND TOP OF FOUNDATION 9.7 OF HEALTH REGULATIONS. 3. ALL PIPES LOCATED UNDER PAVEMENT 4" INVERT AT BUILDING 6.30 A LOCATED WITHIN 150 FT. OF THE REPLUMB AND RELOCATE EXISTING PLUMBING *** 150' OF ANY KNOWN LEACHING FACILITY, 5. WITHIN LIMIT OF EXCAVATION REMOVE 4" INVERT AT SEPTIC TANK (IN) 5.60 B CLEAN GRANULAR SAND, FREE FROM ORGANIC 4" INVERT AT SEPTIC TANK (OUT) 5.35 C NOT CONTAIN ANY MATERIAL LARGER THAN 4" INVERT AT PUMP CHAMBER (IN) 5.25 D BY WEIGHT OF THE FILL SAMPLE MAY BE 2" INVERT AT PUMP CHAMBER (OUT) 5.00 ' E ANALYSES MUST DEMONSTRATE THAT THE INVERTS AT LEACHING FACILITY: SPECIFICATIONS: 1009 MUST PASS#4 SIEVE i 1 1/2" INVERT AT LEACH FIELD 8.0 F (0.15 mm EFFECTIVE PARTICLE SIZE) BREAKOUT=8.3 FG=9.0 7. EXISTING UTILITIES WHERE SHOWN IN THE DRAWINGS ARE APPROXIMATE. BOTTOM OF LEACH FIELD 7.5 G AND THE APPLICABLE UTILITY GROUNDWATER ELEVATION 2.5 H THE STATE OF MASSACHUSETTS OBSERVED GROUNDWATER 1.2 ENGINEER DOES NOT GUARANTEE 'a DIBB , c CIVIL y �~ . % 140.45997ft 30M EXISTING FLOW: BEDROOM 3 BEDROOM 4 d NOTE: A9t5A`@moo �Q 5 BEDROOMS AT 110 G.P.B./D 330 G.P.D. NOTE: 1,10 " r EXISTING SEPTIC COMPONENTS TO BE EXISTING GARBAGE DISPOSAL TO BE PUMPED, CLEAN FILLED OR REMOVED FROM SITE IN (ACCORDANCE WITH REMOVED FROM EXISTING KITCHEN DUE 47- TITLE 5. j °67 DESIGN FLOW' BATH TO RECOGNIZED ADVERSE INFLUENCE. O ON THE PROPOSED SEPTIC SYSTEM: /q� 5 BEDROOMS AT 110 G. P.B./D 330 G.P.D. h CO cws REQUIRED SEPTIC TANK: 0. 550 X 200% = 1100 GAL. SEPTIC TANK PROVIDED: = 1500 GAL. BEDROOM 5 � �� SIZE OF LEACHING FACILITY REQUIRED: w \ DESIGN PERC. RATE: <2 G MIN./ INCH LONG TERM APPL RATE 0.74 G.P.D/S. F. SECOND FLOOR \v D / /r NOTKTO NOT �V ����' / - sy A550 GPD T .0,74 GPD/SF = 743 S.F. T SHED \ T°F01- SIZE OF LEACHING FACILITY PROVIDED: JSE LEACHING FIELD BOTTOM 15",x 5b,-,_' 750 S.F 150'S,F X 0.74 GPD/SF555 GPD MHW AT TOE OF WALL ` /�� / \ \ (+6-bHPRRY' \� W \ 18" OAK 0 FULL "CHERRY \ \ FOUNDATION � BEDROOM 2 \ AREA 11'X`12' o\ \�\ \ LOCUS INFORMATION GARAGE \ ' 1 36.6' ' BEDROOM 1 `\ \ z PROPOSED "Uv" CURRENT OWNER: BARBARA J. PIERCE (qWITH H-20 42.0' ` \ \ tw COVER WALKWAY J / pv� Nv=s.3 \ \ TITLE REFERENCE: BOOK 16195, PAGE 299 PROPOSED 1500 00 / i INV=8.2\ \ BRICK GALLON H-20 REPL MB ALL SEWAGE IPA - \ - PATIO g PROPOSED 1000 I/A SEPTIC TANK j /- TO THIS OUTLET `y � BATH e � \ PLAN REFERENCE: BOOK 146, PAGE 135 GALLON H - 2O - PUMP CHAMBER 9 TO ASSESSORS MAP: 29 � � tP Z \ \ / w 35 B�Fi / 2 STORY yv \ \ PARCEL: 88 N/F o 4, 0µW W 8.7' / 7no WOOD FRAME \ 0" CHERRY DONNA LEA GAVIN BAKER q 9.0 9.2' 18.4' // \ \ ZONING DISTRICT: R-25 /� ,10.1' HOUSE #52 PANTRY ASSESSORS MAP 29 �.tW W _ �-r �' � SETBACKS: FRONT 30' roF=s.7 PARCEL 87 UP 9.3 nY m' SIDE 15' CB/LP 3 W /' 6.1' L U` Tf/.2' ➢n j { REAR 20' � 2"PVC _. SOS �P LIVING ROOM FIND W S Tr .2: �p KITCHEN \ / MINIMUM LOT SIZE: 25,000 4 8.8 GRAVEL EXISTING LOT AREA: 15,517±S.F. 10. ' DRIVEWAA 5/ \ DINING INV=7.` / / OVERLAY DISTRICT: NOT IN A ZONE 11 .� . WALyd ROOM -8 71 5106 K RA� (3) ® 9.4 PINE z A 1 10' _ FEMA FLOOD A-12 ELEV. 10 AS SHOWN ON - - - - - I 3' �p ®1 �. 2" f / ZONE DISTRICT: PANEL #250015 0005 D DATED 7/2/92 CF, gOFFER TO �_ SND_ " S R0D8.I A '� N �i A --� \ iX 9.9 N/F LOCUS PLAN: NO SCALE 32" WILLOW �- � BARBARA J. PIERCE � � l- 28 8.6 CB/DH g / - \ ASSESSORS MAP 29 \ W FND �C 8.7 y \ PARCEL 88 \ / / TH 1 15,517±S.F. 8.8 PROPED� / �pW 5 /°j / / X 28 N -� VF,�JT ��' pbF' PROPOSED 15x50' PRESSURE NOTE: DOSED LEACHING FIELD J 0/ EXISTING SEPTIC COMPONENTS TO BE A BENCH MARK: FO 5(P / / / FROMSITE NACCORDANCE WITH PUMPED, REMOVED m TOP OF CONCRETE BOUND \ �t \ ' / TITLE 5. ELEV. 8.93 NGVD OJ9 / 1 S/ sr°Csjr� ��y3 � \ 2.0' M/LL CREEK X 9.6 RID LOCUS ASSESSORS ILYTR . \ X 7.5 i i 'MHW AT TOE OF WAU PLAN VIEW PARCEL 89 9°0• SCALE: 1' 10 FEET LEW7S BAY 0 5 10 20 FT. REVISIONS NO. DATE DESCRIPTION GENERAL NOTES: 1. THIS PLAN IS FOR DESIGN AND CONSTRUCTION OF THE SEWAGE DISPOSAL FACILITY ONLY. 2. ALL CONSTRUCTION METHODS AND MATERIALS SHALL CONFORM TO MASS. D.E.P TITLE 5 AND LOCAL BOARD OF HEALTH REGULATIONS. 3. ALL PIPES LOCATED UNDER PAVEMENT OR TRAVELED WAY SHALL BE SCHEDULE 40 OR EQUAL. 4. THERE ARE NO KNOWN PRIVATE WELLS LOCATED WITHIN 150 FT. OF THE PROPOSED LEACHING FACILITY NOR ANY KNOWN WELLS PROPOSED WITHIN 150' OF ANY KNOWN LEACHING FACILITY, 5. WITHIN LIMIT OF EXCAVATION REMOVE ALL TOPSOIL, SUBSOIL AND OTHER IMPERVIOUS MATERIAL. 6. REPLACE ALL EXCAVATED MATERIAL WITH CLEAN GRANULAR SAND, FREE FROM ORGANIC MATERIAL AND DELETERIOUS SUBSTANCES. MIXTURES AND LAYERS OF DIFFERENT CLASSES OF SOIL SHALL NOT BE USED. THE FILL SHALL NOT CONTAIN ANY MATERIAL LARGER THAN TWO INCHES. A SIEVE ANALYSIS, USING A #4 SIEVE, SHALL BE PERFORMED ON A REPRESENTATIVE SAMPLE OF FILL. UP TO 457 BY WEIGHT OF THE FILL SAMPLE MAY BE RETAINED ON THE #4 SIEVE. SIEVE ANALYSES ALSO SHALL BE PERFORMED ON THE FRACTION OF FILL SAMPLE PASSING THE #4 SIEVE. SUCH ANALYSES MUST DEMONSTRATE THAT THE MATERIAL MEETS EACH OF THE FOLLOWING SPECIFICATIONS: 1009 MUST PASS#4 SIEVE (4.75 mm EFFECTIVE PARTICLE SIZE) 109-1009 MUST PASS #50 SIEVE (0.30 mm EFFECTIVE PARTICLE SIZE) 09-209 MUST PASS #100 SIEVE (0.15 mm EFFECTIVE PARTICLE SIZE) 09-59 MUST PASS #200 SIEVE (0.075 mm EFFECTIVE PAR71CLE SIZE) 7. EXISTING UTILITIES WHERE SHOWN IN THE DRAWINGS ARE APPROXIMATE. THE CONTRACTOR SHALL BE RESPON- COORDINATING THE PROPOSED CON- STRUCTION ACTIVITY WITH DIG -SAFE AND THE APPLICABLE UTILITY COMPANY AND MAINTAINING THE EXISTING UTILITY SYSTEM IN SERVICE. DIG -SAFE SHALL BE NOTIFIED PER THE STATE OF MASSACHUSETTS STATUTE CHAPTER 82, SECTION 409 AT TEL. 1-888-344-7233. THE ENGINEER DOES NOT GUARANTEE THEIR ACCURACY OR THAT ALL UTILITIES AND SUBSURFACE STRUCTURES ARE SHOWN. LOCATIONS AND ELEVATIONS OF UNDERGROUND UTILITIES TAKEN FROM RECORD PLANS. THE CONTRACTOR SHALL VERIFY SIZE, LOCATION AND INVERTS OF UTILITIES AND STRUCTURES AS REQUIRED PRIOR TO THE START OF CONSTRUCTION. 8. THIS SYSTEM IS NOT DESIGNED FOR THE USE OF A GARBAGE GRINDER. A GARBAGE GRINDER IS NOT RECOMMENDED DUE TO RECOGNIZED ADVERSE IMPACTS TO THE LEACHING FaclurY. 9. EXITING INVERTS ARE TO BE CHECKED BY THECONTRACTOR PRIOR TO CONSTRUCTION, CONFIRM LOCATION & NUMBER OF INVERTS. 0. THE ENGINEER IS TO BE NOTIFIED OF ANY FIELD CHANGES THAT MAY BE REQUIRED. BSC GPOUP 349 Main Street, (RT. 28) Unit D W. Yarmouth Massachusetts 02673 508 778 8919 PROJECT TITLE: DESIGN FOR SEWAGE DISPOSAL SYSTEM REPAIR tr52 PRINCE ROAD WEST YARMOUTH MASSACHUSETTS PREPARED FOR: BARBARA PIERCE 130 N. COLLIER BLVD. F6 MARCO ISLAND, FL 34145 (239) 394-0371 DATE: FEBRUARY 9, 2007 COMP./DESIGN: K. HEALY CHECK: M. DIBB DRAWN: P. HAGIST FIELD: D. GAZZOLO / J. McCARTIN FILE NO. 9187-SEP.DWG DWG NO. 5781-01 SHEET 1 OF 3 JOB NO. 4-9187.00 _n a ULTRAVIOLET UNIT DESIGN DETAIL SEPTIC TANK WITH FAST SEE DETAIL SHEET 3 18" CAST IRON FRAME & COVER REMOVABLE CAP JUNCTION.. BOX UP TO 24 TREATMENT DISINFECTED EFFLUENT EFFLUENT 18" SALCOR UV DISINFECTION UNIT MODEL 3G (SUPPLIED BY FAST) INSPECTION SCHEDULE 1. ENGINEER SHALL INSPECT WHEN THE REQUIRED EXCAVATION IS COMPLETE. C 2. WALL LOCATION TO BE STAKED OUT PRIOR TO CONSTRUCTION. 3. ENGINEER SHALL INSPECT INSTALLATION OF VERSA-LOK WALLS AND IMPERVIOUS BARRIER. PRIOR TO BACKFILL 4, ENGINEER SHALL INSPECT WHEN CLEAN FILL WITH A PERCOLATION RATE OF LESS THAN TWO (2) MINUTES PER INCH HAS BEEN PROPERLY DEPOSITED. 5. ENGINEER SHALL INSPECT WHEN THE COMPONENTS OF THE SEPTIC SYSTEM ALTERNATE BETWEEN TOP AND THE PUMP MECHANISMS HAVE BEEN INSTALLED, PRIOR TO BACKFILL. AND BOTTOM OF PIPE 6. ENGINEER TO INSPECT FINISH GRADE AROUND VERSA-LOK RETAINING WALL. EXACT DIAMETER HOLES SHOULD BE SHOP DRILLED WI in A DRILL PRESS TO ENSURE UNIFORMITY. REMOVE BURRS PRIOR TO PLACING PIPE. 1000 GALLON H-20 PUMP CHAMBER 1.5"DIA. SCH-40 PVC LATERALS SNAP-ON SHIELD DRAINAGE SLOTS ORIFIC �NIFI D DETAIL NOT TO SCALE DOSING CALCULATIONS: DESIGN FLOW TO CHAMBER = 550 GPD REQ'D EMERGENCY STORAGE = 550 GAL PUMP POWER EMERGENCY STORAGE PROVO = 607 GAL - & FLOAT 4'-5" 5 -3" 27"x4' -5"x8' -2"x7.48 GAL/CF = 607 GAL CONTROL NUMBER OF DOSING CYCLES = 4I PER DAY CABLES 0 DEPTH PER CYCLE = 4 INCHES 4"x4' -5"x8' -2"x7.48' GAL/CF = 89 GAL/DOSE INLET DESIGN TDH = 12 FEET TEE DESIGN GPM = 38 GPM 5" WALLS. FINISHED GRADE 27 MIN. PRESSURE DOSE SPECIFICATIONS PERFORATION SIZE: 1/4- DIAMETER PERFORATION SPACING 5' O.C. LATERAL DIAMETER 1.5" MANIFOLD DIAMETER 2" PERFORATIONS ON ADJACENT LATERALS TO BE STAGGERED. 30 TOTAL PUMP DOSING _ CALCULATIONS 1 DETERMINE VOLUME OF EFFLUENT TO BE PUMPED TO WASTEFLOW DRIPLINES DAILY FLOW = 550 GALLONS NUMBER OF DOSES PER DAY = t6 NUMBER OF GALLONS = 550/6 = 92 GALLONS DRAIN BACK VOLUME 2" FORCE MAIN & 2" MANIFOLD 1 GALLONS PUMPING VOLUME = DOSING VOLUME + DRAIN BACK VOLUME 93 GALS. = 1 GALS. + 92 GALS. 2. DISCHARGE RATE 38 GPM ® 12 FT OF HEAD 3 PUMP USE MYERS SRM 4 PUMP OR APPROVED EQUIVALENT. WITH VERTICAL FLOAT SWITCH 4 ORIFICE SHIELD OS150CW 24" DIA MIN. C.I. MANHOLE COVER 5'-0" DEPT. DOUBLE WASHED STONE 1H OF 1(4,91 — BROUGHT TO FINISH GRADE BOLT ON COVERS CIVIL RSct, 45937 2'-6"so TOP STONE ELEV. 8.3 FIN, GR. EL. = 9.0 & /// `/A W. Yarmouth Massachusetts 02673 PHONE 1-800-348-9843 TOP EL. =6.75 OO 00 O 2" MIN. OF 1/8" T0. 1/4" SYSTEM REPAIR #52 NOTES: OR EQUAL { 12" MIN t 130 N. COLLIER BLVD. F6 MARCO ISLAND, FL 34145 - VENT 1. PUMP CHAMBER TO WITHSTAND 36" MAX FROM SEPTIC SECURE CHAIN 1.5"PVC SCH 40 LATERALS pp p pp 2" PVC COVER H-20 LOADING INV.= 5.25 TANK 1/4" PERF. (TYP) NEAR THE CROWN OF THE PIPE TO WALL �Ooo,.. mom DISCHARGE oWo oq' DOUBLE WASHED STONE AT THE END OF EACH LATERAL. p pp 4p 1.5" PVC SCH 40 pp EMER. a 2e pp TO BE PLACED ADJACENT PIPE INV 5.00 2. WATERPROOF AT FACTORY TO 1/8" VENT HOLE 6'-0" 2" SCH 40 PVC MANIFOLD PIPES STOR. R = ORIFICE SHIELDS AS 2" GALV. UNION/WEEP HOLE MANUFACTURED OR APPROVED EQUAL. ALARM ELEV.= 3.00 2" PVC SCH 40 O v 1/4" PERFORATIONS ALTERNATED FORCE MAIN CHECK VALVE POINT OF EACH LATERAL LINE EVERY 5'-0" AT THE 6 O'CLOCK SECTION A - ww mop 2" SCH . ALL PIPE CONNECTIONS AND CONCRETE PUMP ON EL. = 2.50 T6" —_ R w F E PVC THREADED CONSTRUCTION SHALL BE WATERTIGHT. ADJ. G.W. 2.5 T 4" w vm PIPE 4. RAISE MANHOLE TO FINISH GRADE WITH PUMP OFF EL. = 2.17 ? 3 MERCURY FLOAT SEWER BRICK AND MORTAR. FULL OUTER na- - 11 LEVEL CONTROLS MORTAR PARGE TO PROVIDE WATER BOT. EL = 0.70 MYERS SRM 4 TIGHT SEAL �croP �a aboon o a oo �Q�oou�:�ooa SEWAGE PUMP/ VERTICAL FLOAT SWITCH 5. POWER GABLES TO BE PLACED IN 6" MIN. 3/4" TO 1 1/2" STONE LOCATED UNDER MH CONDUIT IN ACCORDANCE WITH LOCAL BUILDING AND WIRE CODES. NOT TO SCALE PRESSURE DOSE SPECIFICATIONS PERFORATION SIZE: 1/4- DIAMETER PERFORATION SPACING 5' O.C. LATERAL DIAMETER 1.5" MANIFOLD DIAMETER 2" PERFORATIONS ON ADJACENT LATERALS TO BE STAGGERED. 30 TOTAL PUMP DOSING _ CALCULATIONS 1 DETERMINE VOLUME OF EFFLUENT TO BE PUMPED TO WASTEFLOW DRIPLINES DAILY FLOW = 550 GALLONS NUMBER OF DOSES PER DAY = t6 NUMBER OF GALLONS = 550/6 = 92 GALLONS DRAIN BACK VOLUME 2" FORCE MAIN & 2" MANIFOLD 1 GALLONS PUMPING VOLUME = DOSING VOLUME + DRAIN BACK VOLUME 93 GALS. = 1 GALS. + 92 GALS. 2. DISCHARGE RATE 38 GPM ® 12 FT OF HEAD 3 PUMP USE MYERS SRM 4 PUMP OR APPROVED EQUIVALENT. WITH VERTICAL FLOAT SWITCH 4 ORIFICE SHIELD OS150CW NO. DATE DESCRIPTION 5'-0" 5'-0" DEPT. DOUBLE WASHED STONE 1H OF 1(4,91 ORENCO SYSTEMS INC. CIVIL RSct, 45937 2'-6"so TOP STONE ELEV. 8.3 BsC GROUPi 349 Main Street, (RT. 28) Unit D W. Yarmouth Massachusetts 02673 PHONE 1-800-348-9843 pOOO OO 00 O 2" MIN. OF 1/8" T0. 1/4" SYSTEM REPAIR #52 PRINCE ROAD OR EQUAL MASSACHUSETTS 12" MIN DOUBLE WASHED STONE 130 N. COLLIER BLVD. F6 MARCO ISLAND, FL 34145 - VENT DATE: JANUARY 31, 2007 COMP./DESIGN: K. HEALY 36" MAX TOP STONE ELEV. 7.3 1.5"PVC SCH 40 LATERALS pp p pp pp1/4" COVER SET LEVEL AT ELEV. 8.0 SHEET 2 OF 3 1/4" PERF. (TYP) NEAR THE CROWN OF THE PIPE �Ooo,.. mom rn0� oWo oq' DOUBLE WASHED STONE AT THE END OF EACH LATERAL. p pp 4p 1.5" PVC SCH 40 pp pp TO BE PLACED ADJACENT LATERALS. (TYP) TO 1/8" VENT HOLE 2" SCH 40 PVC MANIFOLD PIPES 6" OF 3/4" TO 1 1/2" ORIFICE SHIELDS AS DOUBLE WASHED STONE MANUFACTURED BY ORENCO SYSTEMS INC. 2" PVC SCH 40 OR APPROVED EQUAL 1/4" PERFORATIONS ALTERNATED FORCE MAIN MID POINT OF EACH LATERAL LINE EVERY 5'-0" AT THE 6 O'CLOCK SECTION A POSITION. (TYP) SECTION B - B NOT TO SCALE 7" DIA. CONTROL VALVE BOX AS MANUFACTURED BY AMETEK PLYMOUTH PRODUCTS DIVISION. PAT. #3858765 PVC OR APPROVED EQUAL. CAP NUT ORIFICE SHIELDS AS TO BE BROUGHT TO WITHIN MANUFACTURED BY ORENCO SYSTEMS INC. 3" OF FINISHED GRADE OR APPROVED EQUAL I Alin All,II 2.5'5'-0" 5'-0"---� CLEANOUT ALTERNATE PERFORATIONS SEE SYSTEM LAYOUT 2" MIN. OF 1/8" TO 1/4" V-0" NO. DATE DESCRIPTION 5'—O" 2-1" 45' BEND DEPT. DOUBLE WASHED STONE 1H OF 1(4,91 MARK O.c �.' wllka CIVIL RSct, 45937 TOP STONE ELEV. 8.3 BsC GROUPi 349 Main Street, (RT. 28) Unit D W. Yarmouth Massachusetts 02673 000 00p pOOO OO 00 O -411 S. _ " 1 /4 SYSTEM REPAIR #52 PRINCE ROAD WEST YARMOUTH MASSACHUSETTS PREPARED FOR: BARBARA PIERCE 130 N. COLLIER BLVD. F6 MARCO ISLAND, FL 34145 - VENT DATE: JANUARY 31, 2007 COMP./DESIGN: K. HEALY CHECK: M. DIBB pp o pp HOLE 1.5"PVC SCH 40 LATERALS pp p pp pp1/4" PERFORATION TO BE PLACED SET LEVEL AT ELEV. 8.0 SHEET 2 OF 3 1/4" PERF. (TYP) NEAR THE CROWN OF THE PIPE 6" OF 3/4" TO 1 1/2" IN THE 45' BEND 6" OF 3/4 TO 1 1/2" DOUBLE WASHED STONE AT THE END OF EACH LATERAL. DOUBLE WASHED STONE TO BE PLACED ADJACENT TO 1/8" VENT HOLE 2" SCH 40 PVC MANIFOLD PIPES AND BENEATH VALVE BOX PITCH 0.005 BACK TO FORCE MAIN. 1/4- PERFORATION TO BE PLACED 2" PVC SCH 40 AT THE 6 O'CLOCK POSITION AT THE FORCE MAIN MID POINT OF EACH LATERAL LINE SECTION A - A NOT TO SCALE REVISIONS NO. DATE DESCRIPTION OdL��0 2022 T DEPT. 1H OF 1(4,91 MARK O.c �.' wllka CIVIL RSct, 45937 BsC GROUPi 349 Main Street, (RT. 28) Unit D W. Yarmouth Massachusetts 02673 508 778 8919 PROJECT TITLE: DESIGN FOR SEWAGE DISPOSAL SYSTEM REPAIR #52 PRINCE ROAD WEST YARMOUTH MASSACHUSETTS PREPARED FOR: BARBARA PIERCE 130 N. COLLIER BLVD. F6 MARCO ISLAND, FL 34145 (239) 394-0371 DATE: JANUARY 31, 2007 COMP./DESIGN: K. HEALY CHECK: M. DIBB DRAWN: P. HAGIST FIELD: D. GAZZOLO / J. McCARTIN FILE NO. 9187SEP1.DWG DWG N0: 5781-01 SHEET 2 OF 3 JOB NO. 4-9187.00 Specif ications For HighStrengthFAST L0 Wastewater Treatment System GENERAL 5 REMOTE MOUNTED BLOW 1ER The blower may be mounted remote The contractor shalt furnish and with no more than 100 ft Install (1) HlghStrengthFAST 1.0 our M) of piping and no more than four. elbows, treatment system as manufactured by from the HighStrengthFAST unit on a Bio-Microbics, Inc. The treatment contractor supplied concrete base. system shall be complete with all The blower Must not set in standing needed equipment as shown on the water and its elevation must be higher drawings and specified herein, than the normal flood level. A two-piece, rectangular housing shalt The principal items of equipment shad be provided with tamper -proof screws. include FAST System insert, insert lid The discharge air tine from the blower Cor leg extensions if that option is to the HighStrengthFAST shall be chosen), blower assembly, blower provided and installed by the controls and alarms. The contractor. HighStrengthFAST 1.0 unit shall be situated within a 500 gallon minimum 6 ELECTRICAL compartment tank, as shown on the The electrical source should be within plans, or in a 1250 gallon one 150 feet of the blower. Consult local compartment tank. Tank(s) must code for longer wiring distances. All conform to local, state, and all other wiring must conform to code. The input applicable codes. The contractor shalt power required for the blower is provide coordination between the FAST 115/230 Volts, Single Phase, 60/50 system and tank supplier with regard Hertz, 3.8/1.9 Full Load Amps, minimum to fabrication of the tank, Installation wire size is 14 A.W,G. (Locked Rotor of the FAST unit and delivery to the Amps are 18,6/9,3). All conduit and job site. wiring between the electrical control 2, OPERATING C❑NDTIONS panel (optional), the power supply, and the blower shall be furnished and The HighStrengthFAST 1.0 treatment installed by the contractor. system shall be capable of treating the wastewater from all facilities 7. ALARMS producing appropriate waste to develop The alarm system shall consist of a and sustain a viable biomass. Waste visual and audible alarm to Indicate containing inhibitory substances is not loss of power to the blower and/or ec9mmend-"� Com +vontmonl: in .the A ,.,nru,nl SilPnCe FAST system. Consult factory for a switch is Included. proper sizing and usage. 8. INSTALLATIDN AND OPERATION 3. MEDIA INSTRUCTIONS The FAST media shall be manufactured ALL work must be done in accordance of rigid PVC, polyethylene or with total codes and regulations. polypropylene and it shalt be Installation of the HighStrengthFAST supported by the polyethylene insert. 1.0 shall be done In accordance with The media shalt be fixed in position and the written instructions provided by contain no moving or wearing parts and the manufacturer. No more than four shall not corrode. The media shall be feet of fill may be placed over the designed and installed to ensure that FAST lid. Operation manuals shall be sloughed solids immediately descend furnished which will include a through the media to the bottom of description of installation, operation, the septic tank. and system maintenance procedures. There shall be a separate manual for 4. BLOWER the installer, service provider, and The HighStrengthFAST 1.0 unit shalt owner, tailored to each. come equipped with a regenerative type blower capable of delivering 32-36 CFM. The blower assembly shalt include an Inlet fitter with metal filter element. MDS 6' GRATE (6-034 IMUNI)GRATE) V/9.1 SQ IN UEN SURFACE AREA OR E&P"AL.ENT 2' <Scm) SEE NOTE 3 r2cm)_ 1.25' 9.25'9(23,5cm) (22,9cm)SECURED WrM STAINLESS STEEL. SCREVS O (43.2cm) (22.9cm) 6' MA ONSERVATMN 6` (15.2cm) NOTES 1,25' VENTS 1, SECURE ORIGINAL 7' X 7' FOOT TO LEG EXTENSION (3.2cm> W/FAST LID BY PLACING TWO (2) SCREWS IN EACH SIDE OF THE G TYP 22,75' <57,8cm) EXTENSION EIGHT (8) SCREWS PER FOOT ARE BLOWER HOUSING BASE DIMENSIONS (SECTION A -A) 01 WM o 14' (35.6cm) A COCREIIE 5' (12.7cm) JJ BLOWER HOUSING DIMENSI❑NS LE INCLUDED AND SHOULD BE USED ON EACH OF THE FOUR (4) CORNER LEG EXTENSIONS. 2. ANCHOR THE LEG EXTENSIONS (4 CORNER LEGS ONLY) TO THE BASE OF THE TANK, PLACE BOLTS AT OPPOSITE CORNERS OF THE LEG EXTENSION BASE. 3. TO ELONGATE FOOT PAST THE PROVIDED 12', CUT THE 3,9' LEG EXTENSION IN THE CENTER INTO TWO SEPARATE PIECES THEN CUT A SCH 40 PVC PIPE TO THE DESIRED 'LENGTH AND SLIP THE 'PIPE OVER THE TOP AND BOTTOM CUT SECTIONS OF THE LEG EXTENSIONS. 4. ATTACH' PIPES WITH STAINLESS STEEL SCREWS, 5. VENT TO BE LOCATED ABOVE FINISH GRADE OR HIGHER TO AVOID INFILTRATIDN. CAP WITH 6' VENT GRATE W/AT LEAST 9.1 SQ. IN. OF OPEN SURFACE AREA. SECURE WITH STAINLESS STEEL SCREWS (SEE HSF 1.0 L DWG), OR RUN VENT TO DESIRED LOCATION AND COVER OPENING WITH 3' VENT GRATE, SECURE WITH STAINLESS STEEL SCREWS. VENT MUST NOT ALLOW EXCESS MOISTURE BUILDUP OR BACK PRESSURE. IN THE INTEREST OF TECHNOLOGICAL PROGRESS, ALL PRODUCTS ARE SUBJECT TO DESIGN AND/OR MATERIAL CHANGE WITHOUT NOTICE. Date 01-03-05 B1O- MICROBIC$10"H:ighStrengthFAST61.0 X INCORPORAT1-800-753-FAST(3278) 1BNm. rnm by BMI oseNmo.m ME N.BIdIEB wacas pn.plM19E.N01®. Lt5lu- MICROBIC$ I H ghStrengthFASTel.0 S INOORPO RAT EO 1-800-753-3278(FAS rc ema+,uo oma ar nn aww a ns simrnnr v Ne quo N wr rnwn by BMI la nE tRiY tMFPf N WIl6'f10M. M91H Z:: LE90M NN 11 �ON18 .Yff �eETID. O�Rad✓B M£ N /CFB IP4ES4 OTIEIT3E Nl1ED. 016` 016" (040.6cm) FAM AM (040.6cm) CLAMP EVERY 2 FT GASKET GASKET CLAW EVERY 2 'FT RISER r Atlt SUPPLY LP AM SUPPLY LINE LITE GASKET GAIT NIN-CMMSIVE NW-CORROSWE 2 FT CLAW EVERY 2 FT CLAW FAST AIR SUPPLY aIR tn=T AiR FASTT* OPTION S PLAN VIEW (SEE NOTE 5) 11 BUTTER SEE NON -SIVE KoatrwgtWA O LO L N❑TES CLAMP EVERY 2 FT. (SEE AIR SUPPLY 113PTI11114) 3' C742aM) VENT 1, SECURE ORIGINAL 7' X 71 FOOT TO LEG EXTENSION SEE M BY PLACING TWO (2) SCREWS IN EACH SIDE OF THE TOP OF A AST010 L LEG EXTENSION. EIGHT (8) SCREWS PER FOOT ARE BffrTON 13F CONCRETE LID INCLUDED AND SHOULD BE USED ON EACH OF THE WITHIN I 1/LW GASKET FOUR (4) CORNER LEG EXTENSIDNS, REVISIONS NO. DATE DESCRIPTION 9, WARRANTY The manufacturer of the HighStrengthFAST 1.0 treatment system shalt warrant for eighteen months from the date of shipment or one year from the date of start-up, whichever occurs first, ONLY) TO THE BASE OF THE TANK. PLACE BOLTS that the equipment they provide will be free from defects in material and workmanship. In the event a- mechanical component faits to perform as specified or is proven defective in service during the AT OPPOSITE CORNERS OF THE LEG EXTENSION warranty period, the manufacturer shaltrepair or replace such defective parts. (Cost of labor on repair/replacement is not covered under this warranty.) The replacement or repair of those Items normally consumed in service such as air filter, etc., shalt be considered as part of routine maintenance and upkeep. It is not intended that the manufacturer assume responsibility for 3. TO ELONGATE FOOT PAST', THE PROVIDED 12', CUT contingent liabilities or consequential damages of any nature resulting from defects in desmon material orLgV workmanship or delays in delivery. MAY 2 0 2022 replacement or otherwise._ THE 3,9° LEG EXTENSION IN THE CENTER INTO TWO HEALTH DEPT. 10 FLOW AND DOSING Wastewater treatment systems work best when influent flow is delivered as consistently as possible. FAST systems SEPARATE PIECES. THEN'CUT A SCH 40 PVC PIPE tested and certified recieving gravity, demand -based influent flow. When influent flow is controlled (either by pump or other means) to the FAST system to help with highly variable flow conditions, then multiple feeding events should be used to help assure even flow, optimum performance, and reliability. IN THE INTEREST OF TECHNOLOGICAL PROGRESS, ALL PRODUCTS ARE AND/OR MATERIAL CHANGE WITHOUT NOTICE. SUBJECT TO DESIGN D _ _ 5 Lt5lu- MICROBIC$ I H ghStrengthFASTel.0 S INOORPO RAT EO 1-800-753-3278(FAS rc ema+,uo oma ar nn aww a ns simrnnr v Ne quo N wr rnwn by BMI la nE tRiY tMFPf N WIl6'f10M. M91H Z:: LE90M NN 11 �ON18 .Yff �eETID. O�Rad✓B M£ N /CFB IP4ES4 OTIEIT3E Nl1ED. 016` 016" (040.6cm) FAM AM (040.6cm) CLAMP EVERY 2 FT GASKET GASKET CLAW EVERY 2 'FT RISER r Atlt SUPPLY LP AM SUPPLY LINE LITE GASKET GAIT NIN-CMMSIVE NW-CORROSWE 2 FT CLAW EVERY 2 FT CLAW FAST AIR SUPPLY aIR tn=T AiR FASTT* OPTION S PLAN VIEW (SEE NOTE 5) 11 BUTTER SEE NON -SIVE KoatrwgtWA O LO L N❑TES CLAMP EVERY 2 FT. (SEE AIR SUPPLY 113PTI11114) 3' C742aM) VENT 1, SECURE ORIGINAL 7' X 71 FOOT TO LEG EXTENSION SEE M BY PLACING TWO (2) SCREWS IN EACH SIDE OF THE TOP OF A AST010 L LEG EXTENSION. EIGHT (8) SCREWS PER FOOT ARE BffrTON 13F CONCRETE LID INCLUDED AND SHOULD BE USED ON EACH OF THE WITHIN I 1/LW GASKET FOUR (4) CORNER LEG EXTENSIDNS, SN OF 1'V. oma' MA RK D. tiN D.rs3 m CIVIL m No. 4,5937 �FQISTEQ'c� FSS AL 2 i 349 Main Street, (RT. 28) Unit D W. Yarmouth Massachusetts 02673 508 778 8919 PROJECT TITLE: DESIGN FOR SEWAGE DISPOSAL SYSTEM REPAIR #52 PRINCE' ROAD WEST YARMOUTH MASSACHUSETTS PREPARED FOR: BARBARA PIERCE 130 N. COLLIER BLVD. F6 MARCO ISLAND, FL 34145 (239) 394-0371 DATE: FEBRUARY 9, 2007 COMP./DESIGN: K. HEALY CHECK: M. DIBB DRAWN: P. HAGIST FIELD: D. GAZZOLO / J. McCARTIN FILE NO. 9187SEP1.DWG DWG NO. 5781-01 SHEET 3 OF 3 JOB NO. 4-9187.00 2. ANCHOR THE LEG EXTENSIONS (4 CORNER LEGS ONLY) TO THE BASE OF THE TANK. PLACE BOLTS AT OPPOSITE CORNERS OF THE LEG EXTENSION BASE. 3. TO ELONGATE FOOT PAST', THE PROVIDED 12', CUT THE 3,9° LEG EXTENSION IN THE CENTER INTO TWO SEPARATE PIECES. THEN'CUT A SCH 40 PVC PIPE TO THE DESIRED LENGTH AND SLIP THE PIPE OVER THE TOP AND BOTTOM CUT SECTIONS OF THE LEG EXTENSIONS, 16.25" (41.3cm) 4. ATTACH PIPES WITH STAINLESS STEEL SCREWS. 5. THE AIR SUPPLY LINE INT❑ THE FAST® UNIT MUST 750 GAL (2842.5 L) - 48.75' BE SECURED S❑ AS TO PREVENT DAMAGE FROM (123.8cm) PIPE VIBRATION. 42.5' 6. SEE ALL NOTES ON HSF 1.0 L DRAWING. (108cm) SETTLING' ZONE TREATMENT ZONE IN THE INTEREST OF TECHNOLOGICAL PROGRESS, ALL PRODUCTS ARE SUBJECT TO DESIGN AND/OR MATERIAL CHANGE WITHOUT NOTICE. 10' MIN. (25.4cm) Date 01-03-05 Blip® MICRICS ® HighStrengthFAST01.0 F ELEVATI❑N INCORPORATED 1 -800 -753 -FAST 3278 . .o°"o�.Ne ,� N Nnff., ansmuce Iq,®. a.nby BMI SN OF 1'V. oma' MA RK D. tiN D.rs3 m CIVIL m No. 4,5937 �FQISTEQ'c� FSS AL 2 i 349 Main Street, (RT. 28) Unit D W. Yarmouth Massachusetts 02673 508 778 8919 PROJECT TITLE: DESIGN FOR SEWAGE DISPOSAL SYSTEM REPAIR #52 PRINCE' ROAD WEST YARMOUTH MASSACHUSETTS PREPARED FOR: BARBARA PIERCE 130 N. COLLIER BLVD. F6 MARCO ISLAND, FL 34145 (239) 394-0371 DATE: FEBRUARY 9, 2007 COMP./DESIGN: K. HEALY CHECK: M. DIBB DRAWN: P. HAGIST FIELD: D. GAZZOLO / J. McCARTIN FILE NO. 9187SEP1.DWG DWG NO. 5781-01 SHEET 3 OF 3 JOB NO. 4-9187.00