Loading...
HomeMy WebLinkAboutReview Checklist "" - ' TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. c7--.5 Lot Zone of Contribution: In Ou( Acreage ACc,Commercial: Residential: �Street: 4Z. e�P )4--F,1 � Village: t42' (/ Floor Plan: t/ >' d 0'L a 111 # Bedrooms: Owner: tee(e Installer: 77 Address: �l Phone: E3),ta i- -71 ' I GA-(I-1-e Phone: . .! VY1/ .- • Qtt1 f th Builder: Engineer: 6S, .. , / Address: Phone: -7-7.---//�l Phone: / 12( S 7 c ref b f Ittvi N/A YES NO 1.Required#of copies received ,/ 2.Date of soils exam and percolation test not older than 2 years c.-----• 3.4-5 ft of naturally occurring pervious material,above water table Li' 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: 5. Water line 10 ft from septic components Var.: t/ 6. Benchmark indicated and shown-NGVD if near wetlands L.----• 7. Septic tank minimum 10 ft from foundation, deck Var.: u LIA. L. AeL 05.- 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: L.----- 9. /9. Leaching minimum 100 ft from wetlands Var.: 5Y 7 L_-- 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11.Tank/leaching minimum 10 ft from property line Var.: 7 7 12. System meets all other setback requirements Var.: ----- 13. Uses adjustment for maximum high groundwater Var.: �_---• 14. Leaching set 4-5 ft above adj.water or bottom e - pVar.: Com' 15. System not in top or subsoil'(A,B horizons)o, 5'remov:I (.._.------ 16.Proposed contours are suitable - 17. System meets slope requirements-min. 1/8", 1/4"preferred C� '18. System meets breakout requirements PVC liner: Wall: 1----- 19. /19. Specified tee sizes are proper, gas baffle on outlet tee 20. Sewage is under 10,000 gpd for parcel L..--- 21. 121.No garbage disposal 6 (6- e )1/t1W ) 22. System adequately sized for its intended use i 23.Minimum 6"stone or compacted below tank and dbox L --• 24.Manhole covers within 6"of grade, pump chamber cover to grade (--- 25. Inspection port on plastic chambers/leach field l/ 26. Electrical permit for pump chamber/Separate meter for duplexes (,---- 27. /27.Pump system-2" line,weep hole,check valve,tee in dbox,pump size l./ 28. Septic tank/pump chamber to be factory waterproofed l./ 29.Vent provided if leaching below 3 feet,under driveway/parking 1/4°>-' 30. Buoyancy calculations for tank/pump chamber 31. Engineer to inspect and certify soils: / wall: commercial: 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature c....----- 33. H-20 loading is subject to vehicular traffic, groundwater L.----- 34. r34. Title V Application and permit fee, installer signature 35. Foundation footing min. 2 feet above adjusted ground water for new house 36. Deed Restriction required max. #bedrooms: max. flow: gpd 37. Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: 6/03/03